CatalystWireBeta

Sea Lion Reserves Evaluation

In brief · summary, not quotable

Sea Lion reserves evaluation shows increased gross resources and NPV of $788m on Rockhopper's 35% stake.

  • 2P NPV10 (Rockhopper 35%) $1,175,828.4k
  • 2P + 2C NPV increase $788 million
  • 2P Proved + Probable reserves (35%) 109,988.0 MBBL
  • 2C Best Estimate Contingent Resources (35%) 161,639.4 MBBL (Development Pending)
  • 2C Contingent Resources NPV10 (35%) $1,781,157.9k
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your RKH notes

Rockhopper (AIM: RKH), the oil and gas company with key interests in the North Falkland Basin, is pleased to announce the results from an updated independent technical report conducted by Netherland, Sewell & Associates, Inc. ("NSAI") on behalf of Rockhopper on the Company's Sea Lion field (the "New Report"). The Report is effective as at 31 July 2026.

The New Report shows that overall gross resource volumes and Net Present Values have increased when compared with the Company's previous independent resource evaluation, also conducted by NSAI, effective December 2025, and announced on 2 April 2026 (the "December 2025 Report").

Importantly, the New Report incorporates the newly accelerated Central Development Area ("CDA") which the Operator intends to develop utilising the OSX-1 FPSO. The increase in resources combined with the acceleration of development at the CDA and updated commodity price assumptions has led to a significant increase of approximately $788 million in the 2P + 2C Net Present Value of the Rockhopper 35% interest in the Sea Lion development.

A summary of the Key Information (oil only) is provided below:

Reserves

Rockhopper holds a 35 per cent working interest in the Sea Lion field.

Oil (MBBL) Gross (100%)Oil (MBBL) Working Interest (35%)Future Net Revenue Working Interest (35%) (US$000) UndiscountedFuture Net Revenue Working Interest (35%) (US$000) NPV10
Proved Undeveloped (1P)231,705.081,096.82,399,495.1927,773.3
Probable82,546.528,891.3999,368.1248,055.1
Proved + Probable (2P)314,251.5109,988.03,398,863.31,175,828.4
Possible93,915.532,870.41,449,350.3329,433.9
Proved + Probable + Possible (3P)408,167.0142,858.54,848,213.51,505,262.3

Note: Oil volumes are expressed in thousands of barrels (MBBL). Gross (100%) figures represent total field reserves; working interest figures represent Rockhopper's 35 per cent share. Future net revenue is after deductions for Rockhopper's share of state royalties, capital costs, abandonment costs, operating expenses and estimates of Falkland Islands corporate income taxes. NPV10 represents future net revenue discounted at an annual rate of 10 per cent. NPV10 should not be construed as the fair market value of the properties. All figures are based on the Base Price Case. See Economic Parameters below.

Contingent Resources

Unrisked Gross (100%) Contingent Resources - Oil (MBBL)

Low Estimate (1C) MBBLBest Estimate (2C) MBBLHigh Estimate (3C) MBBL
Development Pending264,157.6461,826.9608,409.3
Development On Hold65,168.6131,318.8222,543.1
Development Not Viable11,649.932,959.495,310.4
Total340,976.1626,105.1926,262.7
Unrisked Working Interest (35%) Contingent Resources - Oil (MBBL)
Low Estimate (1C) MBBLBest Estimate (2C) MBBLHigh Estimate (3C) MBBL
Development Pending92,455.2161,639.4212,943.3
Development On Hold22,809.045,961.677,890.1
Development Not Viable4,077.511,535.833,358.6
Total119,341.6219,136.8324,192.0

Summary of Unrisked Working Interest (35%) Contingent Cash Flows after Falkland Islands Taxes

Economic analysis has been performed on the Development Pending contingent resources only.

Total (US$000) UndiscountedNPV10 (US$000)
Low Estimate (1C)2,849,710.0926,027.1
Best Estimate (2C)6,043,558.01,781,157.9
High Estimate (3C)8,265,980.92,182,437.8

Economic Parameters

The New Report has been prepared using the following Base Price Case oil price parameters, based on Brent Crude prices adjusted for quality, transportation fees and market differentials:

Period EndingOil Price (US$/Barrel )
31 December 202682.99
31 December 202776.74
Thereafter75.95

The development pending contingent resources are associated with the proposed development plans for Sea Lion Field and are expected to be produced prior to the economic limit of the field; these plans comprise the CDA Phases 1 and 2 and NDA Phase 3.

For the purposes of this report, the development scenario assumes that once field-level production declines below 125,000 barrels of oil per day, the Aoka Mizu FPSO lease will be terminated and the OSX-1 FPSO will service Sea Lion Field by itself.

Additional Notes

NSAI has also provided estimates of gross and working interest (i) Contingent Gas Resources and (ii) Prospective Oil and Gas Resources. These have not been reproduced in this announcement as there is no plan in place for their development.

The information set out above does not constitute the New Report, but is derived from the New Report. A full copy of the New Report will be available on Rockhopper's website later today: www.rockhopperexploration.co.uk.

Resource Disclosure

The New Report has been prepared in accordance with the definitions and guidelines set forth in the 2018 Petroleum Resources Management System ("PRMS") approved by the Society of Petroleum Engineers ("SPE"). The estimates of reserves and resources included in this announcement have not been adjusted for risk.

Lucy Williams (BSc Geology, MSc Petroleum Geology, Chartered Geologist), the Company's Geoscience Manager, has reviewed and approved the technical information contained within this announcement.

Glossary

TermDefinition
1CLow estimate scenario of contingent resources; there is at least a 90% probability that the quantities actually recovered will equal or exceed the 1C estimate.
2CBest (most likely) estimate scenario of contingent resources; there is at least a 50% probability that the quantities actually recovered will equal or exceed the 2C estimate.
3CHigh estimate scenario of contingent resources; there is at least a 10% probability that the quantities actually recovered will equal or exceed the 3C estimate.
1P / ProvedProved Reserves - those quantities of petroleum that, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs under defined conditions.
2PProved + Probable Reserves. The sum of 1P and Probable Reserves.
3PProved + Probable + Possible Reserves. The sum of 2P and Possible Reserves.
CDACentral Development Area of the Sea Lion field.
Contingent ResourcesThose quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations by application of development project(s) not currently considered to be commercial owing to one or more contingencies.
FIDFinal Investment Decision - the decision by the joint venture to commit to full-scale project execution, having secured all necessary approvals and funding.
FPSOFloating Production Storage and Offloading vessel.
MBBLThousands of barrels of oil.
MMBBLMillions of barrels of oil (= 1,000 MBBL).
NDANorthern Development Area of the Sea Lion field.
NSAINetherland, Sewell & Associates, Inc., independent petroleum engineers.
PRMS2018 Petroleum Resources Management System approved by the Society of Petroleum Engineers (SPE) - the industry standard framework for the classification and categorisation of petroleum reserves and resources.
ReservesThose quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must be discovered, recoverable, commercial, and remaining as of the evaluation date.
SPESociety of Petroleum Engineers.
bbl/dBarrels of oil per day.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note