Sea Lion reserves reclassified to higher category following Phase 1 FID; 2P reserves exceed 100 million barrels.

  • 2P Reserves (Working Interest 35%) 109,843.2 MBBL
  • 2P Reserves NPV10 (Working Interest 35%) US$965,782.5k
  • Cash balance at 31 December 2025 US$179 million
  • Working interest in Sea Lion field 35%
  • 3P Reserves (Working Interest 35%) 142,857.4 MBBL
  • Best Estimate Contingent Resources (Working Interest 35%) 211,106.7 MBBL
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your RKH notes

Rockhopper Exploration plc (AIM: RKH), the oil and gas company with key interests in the North Falkland Basin, is pleased to announce the results from an updated independent technical report conducted by Netherland, Sewell & Associates, Inc. ("NSAI") on behalf of Rockhopper on the Company's Sea Lion field (the "Report"). The Report is effective as at 31 December 2025.

The Report shows that overall gross resource volumes are consistent with the Company's previous independent resource evaluation, also conducted by NSAI, dated June 2025 (the "June 2025 Report").

Importantly, the Report has reclassified volumes contained in the Sea Lion Field Northern Development Area ("NDA") Phases 1 and 2 from the Contingent Resources classification to the Reserves classification. This reclassification has been possible following the Company's Final Investment Decision ("FID") on the Sea Lion field, made in December 2025. Phase 2 of the Sea Lion development is expected to be financed from cashflow generated by Phase 1. Later phases of the Sea Lion development have remained within the Contingent Resources category.

Following completion of the placing, the Company had, as at 31 December 2025, a cash balance of approximately US$179 million (unaudited) which is anticipated to be sufficient to fund Rockhopper's proportion of the capex required for the Phase 1 development plan for the Sea Lion field.

Key Information (oil only)

Reserves

Rockhopper holds a 35 per cent working interest in the Sea Lion field.

Oil (MBBL) Gross (100%)Oil (MBBL) Working Interest (35%)Future Net Revenue Working Interest (35%) (US$000) UndiscountedFuture Net Revenue Working Interest (35%) (US$000) NPV10
Proved Undeveloped (1P)230,672.580,735.42,134,911.1720,915.6
Probable83,165.329,107.8968,135.7244,866.9
Proved + Probable (2P)313,837.7109,843.23,103,046.8965,782.5
Possible94,326.333,014.21,399,698.4303,227.4
Proved + Probable + Possible (3P)408,164.0142,857.44,502,745.31,269,009.9

Note: Oil volumes are expressed in thousands of barrels (MBBL). Gross (100%) figures represent total field reserves; working interest figures represent Rockhopper's 35 per cent share. Future net revenue is after deductions for Rockhopper's share of state royalties, capital costs, abandonment costs, operating expenses and estimates of Falkland Islands corporate income taxes. NPV10 represents future net revenue discounted at an annual rate of 10 per cent. NPV10 should not be construed as the fair market value of the properties. All figures are based on the Base Price Case. See Economic Parameters below.

Contingent Resources

Unrisked Gross (100%) Contingent Resources - Oil (MBBL)

Low Estimate (1C) MBBLBest Estimate (2C) MBBLHigh Estimate (3C) MBBL
Development Pending238,736.9412,481.3531,242.9
Development On Hold78,971.1181,078.2299,712.5
Development Not Viable5,713.69,602.714,529.9
Total323,421.6603,162.1845,485.3
Unrisked Working Interest (35%) Contingent Resources - Oil (MBBL)
Low Estimate (1C) MBBLBest Estimate (2C) MBBLHigh Estimate (3C) MBBL
Development Pending83,557.9144,368.4185,935.0
Development On Hold27,639.963,377.4104,899.4
Development Not Viable1,999.83,360.95,085.5
Total113,197.6211,106.7295,919.9

Summary of Unrisked Working Interest (35%) Contingent Cash Flows after Falkland Islands Taxes

Economic analysis has been performed on the Development Pending contingent resources only.

Total (US$000) UndiscountedNPV10 (US$000)
Low Estimate (1C)1,813,859.5554,524.8
Best Estimate (2C)4,286,664.21,202,666.3
High Estimate (3C)6,244,948.01,610,092.7

Economic Parameters

The Report has been prepared using the following Base Price Case oil price parameters, based on Brent Crude prices adjusted for quality, transportation fees and market differentials:

Period EndingOil Price (US$/Barrel)
31 December 202662.99
31 December 202764.79
Thereafter73.63

The development scenario underlying the NPV calculation for the contingent resources aligns with the previously disclosed multi-phase, two-FPSO scheme comprising the Northern Development Area ("NDA") Phases 1, 2 and 3 and the Central Development Area ("CDA") Phases 1 and 2.

Bluewater, the FPSO operator, has served notice on the Aoka Mizu FPSO and the vessel is expected to leave its current location in mid-2026 ahead of a period of refurbishment work prior to deployment at Sea Lion.

Sam Moody, Chief Executive Officer of Rockhopper, commented:

"We are delighted to book in excess of 100 million barrels of 2P reserves following the sanction of Sea Lion Phase 1 - another milestone for Rockhopper. The new NSAI report independently confirms the significant value we are now on the path to unlocking. Navitas, our Operator, has recently reported good progress on the project and has reiterated its target for first oil in early 2028."

Additional Notes

NSAI has also provided estimates of gross and working interest (i) Contingent Gas Resources and (ii) Prospective Oil and Gas Resources. These have not been reproduced in this announcement as there is no plan in place for their development. The Report also includes economic analysis under Low and High Price Case sensitivities.

The information set out above does not constitute the Report, but is derived from the Report. A full copy of the Report will be available on Rockhopper's website later today: www.rockhopperexploration.co.uk

Resource Disclosure

The Report has been prepared in accordance with the definitions and guidelines set forth in the 2018 Petroleum Resources Management System ("PRMS") approved by the Society of Petroleum Engineers ("SPE"). The estimates of reserves and resources included in this announcement have not been adjusted for risk.

Lucy Williams (BSc Geology, MSc Petroleum Geology, Chartered Geologist), the Company's Geoscience Manager, has reviewed and approved the technical information contained within this announcement.

Glossary

TermDefinition
1CLow estimate scenario of contingent resources; there is at least a 90% probability that the quantities actually recovered will equal or exceed the 1C estimate.
2CBest (most likely) estimate scenario of contingent resources; there is at least a 50% probability that the quantities actually recovered will equal or exceed the 2C estimate.
3CHigh estimate scenario of contingent resources; there is at least a 10% probability that the quantities actually recovered will equal or exceed the 3C estimate.
1P / ProvedProved Reserves - those quantities of petroleum that, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs under defined conditions.
2PProved + Probable Reserves. The sum of 1P and Probable Reserves.
3PProved + Probable + Possible Reserves. The sum of 2P and Possible Reserves.
CDACentral Development Area of the Sea Lion field.
Contingent ResourcesThose quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations by application of development project(s) not currently considered to be commercial owing to one or more contingencies.
FIDFinal Investment Decision - the decision by the joint venture to commit to full-scale project execution, having secured all necessary approvals and funding.
FPSOFloating Production Storage and Offloading vessel.
MBBLThousands of barrels of oil.
MMBBLMillions of barrels of oil (= 1,000 MBBL).
NDANorthern Development Area of the Sea Lion field.
NSAINetherland, Sewell & Associates, Inc., independent petroleum engineers.
PRMS2018 Petroleum Resources Management System approved by the Society of Petroleum Engineers (SPE) - the industry standard framework for the classification and categorisation of petroleum reserves and resources.
ReservesThose quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must be discovered, recoverable, commercial, and remaining as of the evaluation date.
SPESociety of Petroleum Engineers.
bbl/dBarrels of oil per day.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note