CatalystWireBeta

High-Grade Intercepts incl 8.75m at 5.05 g/t Au

In brief · summary, not quotable

Maiden drill programme at Eagle Lake returned high-grade gold intercepts including 8.75m at 5.05 g/t Au.

  • Best intercept (EG-26-07) 8.75m at 5.05 g/t Au
  • Broader intercept (EG-26-07) 21.25m at 2.19 g/t Au
  • Highest single assay 1.25m at 17.08 g/t Au
  • Total drill programme 12 holes, 1,169m
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your TAR notes

Encouraging results from first assays provide strong support for high-grade mineralisation at multiple areas at Eagle Lake

Talon Resources plc (AIM: TAR), the North American gold exploration company, is pleased to announce preliminary assay results of its maiden drill programme at the Eagle Lake Gold Project in Ontario, Canada ("Eagle Lake" or the "Project"). These preliminary results relate to sections of core sent for rapid assay from the 12-hole, 1,169m programme, with the majority of assay results expected from the laboratory by the end of 2026.

OVERVIEW

High-grade gold mineralisation intersected at multiple targets from the initial batch of assay results.

Stand-out intercept in EG-26-07 at Cedar Trench. This was the highest-ranked target identified by MINML's PRISM machine learning platform, reinforcing the targeting work and adding a further layer of data to guide future interpretation as work is narrowed and stepped out.

Initial highlight intercepts received to date include:

EG-26-07 (Cedar Trench) intersected:

21.25m at 2.19 g/t Au (from 64.00m), including;

8.75m at 5.05 g/t Au (from 76.50m);

0.93m at 15.10 g/t Au (from 77.57m); and

1.25m at 17.08 g/t Au (from 84.00m)

11.57m at 0.85 g/t Au (from 48.50m), including:

0.60m at 4.67 g/t Au (from 49.12m); and

1.00m at 1.98 g/t Au (from 55.50m)

EG-26-06 (Cedar Trench) intersected:

33.35m at 0.61 g/t Au (from 30.15m), including:

4.55m at 1.83 g/t Au (from 56.95m); and

1.50m at 1.85 g/t Au (from 34.00m)

EG-26-03 (East Fornieri Bay) intersected five intervals of gold mineralisation (all assays received), including:

0.50m at 6.86 g/t Au (from 19.50m); and

2.99m at 0.70 g/t Au (from 94.00m)

EG-26-01 (East Fornieri Bay) intersected:

5.80m at 0.54 g/t Au (from 33.50m), including:

1.10m at 1.68 g/t Au (from 36.00m); and

0.80m at 1.33 g/t Au (from 38.50m)

Remaining samples are being processed by the laboratory and are expected to provide a comprehensive interpretation of the geology at Eagle Lake.

Alex King, Chief Executive Officer, commented:

"These are terrific first results and give us a vital early picture of the wider prospectivity of Eagle Lake. Hole EG-26-07 at Cedar Trench is a fantastic intercept and, importantly, it reinforces the work carried out by MINML, giving us another layer of data to interpret as we narrow our focus and step out from these results. Meanwhile, the majority of samples are still at the laboratory and those additional assays will give us a much more comprehensive interpretation of the geology at Eagle Lake, which I believe will provide strong support behind our confidence that the Project’s true potential has been historically overlooked. We look forward to receiving more results from the laboratory in due course."

DETAILS

Eagle Lake hosts multiple known gold-bearing zones identified through historical exploration, including surface sample results of up to 204 g/t Au. While these results demonstrate the presence of high-grade gold mineralisation, the Project remains relatively underexplored and is now being systematically advanced through Talon's exploration programme.

The Company's Phase 1 exploration programme (see RNS dated 29 June 2026) comprised geological mapping, channel sampling and grab sampling across the Project's priority East Fornieri Bay, Cedar Trench and Parker Shear targets, and identified the new Moss Knoll target.

The maiden drill programme was planned to intersect the mineralisation encountered in the surface channel sampling programme. This programme reported high-grade gold across significant widths at multiple targets across the Project area (see RNS dated 22 July 2026).

The results from the first phase of the maiden drill programme will be incorporated into MINML's machine learning-assisted targeting platform to further refine the Company's geological model and support further drill planning and exploration, expected in Spring 2027.

Table 1: Eagle Lake maiden drill programme – significant intercepts (results received to 26 October 2026; preliminary unless noted)

HoleProspectFrom (m)To (m)Length (m)Au (g/t)Hole Results
EG-26-01E.Fornieri33.5039.305.800.54PARTIAL (22/26)
incl.36.0039.303.300.89
incl.36.0037.101.101.68
incl.38.5039.300.801.33
EG-26-03E.Fornieri4.725.300.581.00COMPLETE (80/80)
19.5020.000.506.86COMPLETE (80/80)
45.4546.000.551.24COMPLETE (80/80)
48.0749.000.930.33COMPLETE (80/80)
94.0096.992.990.70COMPLETE (80/80)
EG-26-06Cedar Trench19.5023.504.000.53PARTIAL (97/110)
30.1563.5033.350.61PARTIAL (97/110)
incl.30.1531.000.850.59
incl.32.5039.006.500.83
incl.34.0035.501.501.85
incl.42.0045.373.370.35
incl.49.0054.435.430.71
incl.52.4153.330.921.28
incl.56.9561.504.551.83
incl.56.9560.573.622.07
71.5073.502.000.59PARTIAL (97/110)
76.9579.882.930.39PARTIAL (97/110)
87.0088.001.000.73PARTIAL (97/110)
93.0093.790.790.43PARTIAL (97/110)
EG-26-07Cedar Trench48.5060.0711.570.85PARTIAL (37/106)
incl.49.1249.720.604.67
incl.55.5056.501.001.98
64.0085.2521.252.19PARTIAL (37/106)
incl.64.0068.344.340.30
incl.76.5085.258.755.05
incl.77.5785.257.685.71
incl.77.5778.500.9315.10
incl.84.0085.251.2517.08

Notes: Lengths are core lengths, true widths unknown. Metallic screen (FA-MeT) results used where available (EG-26-03 2921102; EG-26-07 2920329, 2920335–337). All results preliminary except Actlabs A26-17385 (Final). Au assays below detections of 0.03 ppm use half of the detection limit. Bulk intervals (shaded grey) are calculated at a 0.1 g/t Au cutoff with ≤3.0 m consecutive internal dilution; other intervals at 0.3 g/t Au with ≤2.0 m; no top cut applied Collars NAD83 UTM Zone 15.

Figure 1: Visible gold confirmed at Fornieri Bay: EG-26-03 – 0.50m @ 6.86 g/t Au.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note