CatalystWireBeta

Infill drilling hits 104m @ 6.61g/t Au at Pepas

In brief · summary, not quotable

Infill drilling at Pepas gold prospect returns 104m @ 6.61g/t Au from surface.

  • PEP047 intercept 104m @ 6.61g/t Au from surface
  • PEP047 high-grade zone 36.6m @ 10.23g/t Au
  • PEP047 deeper zone 15.4m @ 10.3g/t Au
  • PEP048 intercept 32.3m @ 3.65g/t Au from surface
  • PEP049 intercept 94.2m @ 3.74g/t Au from surface
  • Holes drilled since November 2024 38 holes
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your OMI notes

Orosur Mining Inc - infill drilling hits 104m @ 6.61g/t Au from surface at Pepas.

  • Assays from three more holes from the Pepas MRE infill program:

o PEP047 - 104m @ 6.61g/t Au from surface

o PEP048 - 32.3m @ 3.65g/t Au from surface

o PEP049 - 94.2m @ 3.74g/t from surface

Soil sampling about to recommence at El Cedro

London, August 5th, 2025. Orosur Mining Inc. ("Orosur" or the "Company") (TSXV/AIM:OMI), is pleased to announce an update on the progress of exploration activities at the Company's flagship, 100% owned, Anzá Gold Project ("Project") in Colombia.

As announced on 14th July 2025, the Company has taken the formal decision to commence infill drilling at its Pepas gold prospect, with the target of moving Pepas to a NI43-101 compliant Mineral Resource Estimate (MRE) by the end of the year.

The first several holes of this program (announced 17th July 2025), vindicated this decision by returning exceptional widths and grades, especially hole PEP045 which returned 62.3m @ 12.76g/t Au.

A drill program has been designed in conjunction with external consultants to facilitate an MRE being calculated. This program has been designed with the multiple objectives of infilling previous drilling, expanding beyond current drilling to define the boundaries, and understanding the geological controls upon mineralisation and the variations in geology and grade across the deposit.

Holes will be drilled in an order that attempts to address these issues concurrently.

As a result of the shallow nature of mineralisation, holes are generally short, taking between three and four days to complete on average. When the Company reassumed control of the Project in December 2024, samples were shifted to a fire-assay laboratory facility in Medellin, that has consistently provided 3-4 days turnaround of assay results. The Company is thus currently averaging roughly one hole per week with only one rig - an exceptionally fast rate of progress by industry standards.

These three holes announced today are a continuation of this infill program and have all returned exceptional results (most especially PEP047), with thick sequences of high-grade gold mineralisation commencing from surface.

Hole NumberFrom (m)To (m)Interval (m)Au (g/t)
PEP04701041046.61
including541.636.610.23
including83.0598.4515.410.3
PEP048032.332.33.65
including527.822.84.51
PEP049094.294.23.74
including06.656.657.27
including17.8540.3522.55.61
including61.5582.1520.65.04

Table 1. Latest drill Intercepts, Pepas Prospect

Infill drilling is ongoing, but the recent holes are already beginning to provide greater understanding of the genesis of Pepas and, as importantly, grade distribution which will be vital for mine planning studies.

While drilling continues, in the near term, the Company will soon begin to undertake additional studies on such issues as metallurgy, mining planning and logistics, so that Pepas can be advanced as quickly as possible post its maiden MRE.

Figure 2. Plan of holes

Figure 3. Section, PEP047

Figure 4. Section PEP048 and PEP049

El Cedro

The El Cedro prospect is a large gold porphyry system, located toward the south of the Anzá project, on the same granted EL as the Pepas and APTA deposits.

As previously announced (28th May 2025), the Company had commenced a large soil sampling program at El Cedro, designed to expand upon previous work by Anglo American and the Company's previous JV partner. This sampling program was roughly 1/3 complete when it had to be suspended due to road damage sustained from an unusually wet season in the region. Rains have now abated, and this road damage has been repaired such that Company geological crews will be returning to El Cedro this week to recommence this program.

Orosur CEO Brad George commented:

"The latest results at Pepas continue to impress. While size remains to be defined, the picture of Pepas as a highly lucrative mining proposition is rapidly solidifying. We are increasingly confident that there is a commercially viable opportunity at Pepas and so we will very soon commence non-drill related studies to begin the process of advancing Pepas toward development."

Colombia - ANZÁ Project

Prospects

Figure 5. Main prospects, licences pre-MMA acquisition

Holes Drilled post MMA Transaction

38 holes have been drilled at Pepas since the MMA Transaction in November 2024.

Assay results are tabulated below.

Hole NumberFrom (m)To (m)Interval (m)Au (g/t)
PEP012066.7566.755.64
PEP013077.3077.307.68
PEP014075.175.15.58
PEP01523.563.740.23.75
PEP01661.6105.343.73.13
PEP01756.196.340.22.06
PEP018054.154.16.01
PEP019044.344.31.63
PEP020054.6554.651.94
PEP0210107.05107.056.22
PEP022076.376.37.24
PEP023015151.7
PEP0249.2415.66.351.99
PEP025010.110.11.45
16.57962.55.4
PEP026014.814.80.57
43.67228.42.52
PEP027180.1579.152.0
PEP02829.560.8531.351.61
PEP029030.730.70.31
PEP030077.977.90.32
115.6122.670.31
PEP031B28.1541.112.950.73
74.195.920.80.3
PEP032092921.68
PEP033021.321.35.88
PEP03436955910.15
PEP035011.411.42.71
PEP036B040.4540.450.62
PEP0370330.65
PEP038016.816.80.68
PEP039No significant intersections
PEP040010.2510.251.35
PEP04134.3566.131.752.01
PEP042104.8107.552.751.41
116.45119.73.254.89
PEP043No significant intersections
PEP0445.844.338.56.01
PEP0459.571.862.312.76
PEP046053.253.23.36
PEP04701041046.61
PEP048032.332.33.65
PEP049094.294.23.74

Table 2. Results to date, post MMA Transaction

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note