Castillo Copper Limited (LSE and ASX: CCZ), a base metal explorer primarily focused on copper across Australia and Zambia, is pleased to announce the financial report of the Group for the half-year ended 31 December 2023.

Directors

The names of directors who held office during or since the end of the half-year and until the date of this report are as below. Directors were in office for this entire period unless otherwise stated.

Gerrard (Ged) HallNon-Executive Chairman
Dr Dennis JensenManaging Director (resigned 10 October 2023)
David DrakeleyNon-Executive Director (resigned 14 March 2024)
Jack SedgwickNon-Executive Director (resigned 14 March 2024)
Joel LoganNon-Executive Director (appointed 14 March 2024)
Eduardo RobainaNon-Executive Director (appointed 14 March 2024)

Results

The loss after tax for the half-year ended 31 December 2023 was $1,197,257 (31 December 2022 loss of $625,672).

Review of Operations

During the financial period, the principal activity of the Group was mineral exploration in eastern Australia.

The Group has four (4) exploration projects, including the North-West Copper (NWQ) Project located in the copper-belt of Mt Isa, the Broken Hill Alliance (BHA) Project situated near the world class silver-zinc-lead deposit in Broken Hill, New South Wales, the historic Cangai Copper Mine in northern New South Wales, and several assets within the copper-belt of Zambia.

An overview of significant activities carried out during the financial period is presented below:

CANGAI MINERAL RESOURCE ESTIMATE

On 25 July 2023, Castillo Copper's geology team, in collaboration with a specialist geological consultancy, generated an updated JORC (2012) compliant Mineral Resource Estimate (MRE) for the Cangai Copper Mine.

This update includes an inferred in-situ resource of 4.4 million tonnes at a copper (Cu) grade of 2.5% and an indicated resource from historic stockpiles of 0.2 million tonnes at 1.35% Cu, amounting to approximately 114,000 tonnes of contained copper metal, augmented further by zinc, gold, and silver credits (Table 1)1.

Table 1: 2023 Cangai Mineral Resource Estimate

CategoryInferred Mass (Tonnes)Cu (%)Co (%)Zn (%)Au (%)Ag (%)Cu (Tonnes)Co (Tonnes)Zn (Tonnes)Au (Kg)Ag (Kg)
Insitu [Ox.]634,0002.650.010.650.1516.116,801634,1219510,207
Insitu [Fr.]3,773,0002.480.010.550.3115.293,57022620,7521,17057,350
Dumps [Ox.]29,0002.100.020.300.5814.560958717421
Total4,436,0002.500.010.600.2915.3110,98029424,9601,28267,978
Table 1: 2023 Cangai Mineral Resource Estimate (continued)
CategoryIndicated Mass (Tonnes)Cu (%)Co (%)Zn (%)Au (%)Ag (%)Cu (Tonnes)Co (Tonnes)Zn (Tonnes)Au (Kg)Ag (Kg)
Dumps [Ox.]199,0001.350.021.90.14.62,687483,78120915
Total199,0001.350.021.90.14.62,687483,78120915
Total4,635,0002.450.010.600.2814.9113,66734228,7411,30168,893

Notes:

  • All resource tonnages rounded to the nearest 1,000 tonnes.
  • Refer to JORC Table 1 for details on data and estimation.
  • Insitu tonnages calculated as a guide only, no recovery factor, loss or dilution considered.

In updating the Mineral Resource Estimate (MRE) from its 2017 figures (3.3 million tonnes at 3.35% Cu, totalling 108,000 tonnes), the geology team incorporated data from reverse circulation and diamond core drilling activities conducted between 2017 and 2018 and applied more conservative assumptions to enhance the confidence of the revised 2023 MRE.

ASSET PORTFOLIO REVIEW

Castillo Copper's Board is of the opinion that the present tenement holdings possess significant exploration potential. Consequently, during the reporting period a comprehensive strategic review of the Group's exploration assets was conducted.

Assets identified as core to the Company's strategy will be developed, potentially in collaboration with a strategic partner. Assets considered non-essential will be divested.

As part of the review process, members of the geology team visited the North West Queensland Copper Project's Boomerang and Josephine Prospects to assess their exploration potential. Both have been interpreted as prospective for structurally controlled copper mineralisation.

The historical highlights of these prospects are as follows:

  • Boomerang Prospect: Mineralisation is hosted in the Surprise Creek Formation and is thought to be associated with secondary faulting related to the Mt Gordon Fault, a regional NE trending structure. In 1975, Dampier Mining conducted an exploration campaign that included geological mapping, rock sampling and drilling of nine RAB holes, to delineate a sandstone hosted copper oxide mineralisation over an 800m strike length. Secondary copper staining was observed along the strike length.
  • Josephine Prospect: Occurs within a fault-bounded block of middle-lower Surprise Creek Formation. The host rock consists of buff, brown and grey thin bedded fine feldspathic and labile sandstone, ferruginous sandstone and micaceous siltstone.

During the site visits, twenty-one (21) rock chip samples were collected from the Boomerang Prospect and another thirteen (13) from the outcrops at the Josephine Prospect. Analysis conducted by ALS Brisbane on these samples identified elevated copper levels up to 0.46% Cu at Boomerang. The findings from the rock chip analysis will guide the direction of subsequent exploration efforts.

With more than twenty (20) prospects within the NWQ Copper Project area, the Group's Board approved the review's suggestion to designate the NWQ Copper Project as a core asset.

CORPORATE BOARD CHANGES

On 9 October 2023, the Board announced the appointment of Mr Jack Sedgwick as interim Executive Director. On 10 October 2023, Managing Director Dr Dennis Jensen resigned from the Castillo Copper Board. Mr Sedgwick was tasked with conducting the review of the Company's assets and realigning the strategic direction of the Group.

Upon concluding the review, Mr Sedgwick transitioned from interim Executive Director to that of Non-Executive Director, effective 15 December 2023.

The restructure is anticipated to lower the annual expenses of the Board, underscoring the Company's commitment to maintaining cost efficiency and focusing strategically on enhancing its exploration properties.

Events subsequent to period end

The following significant events occurred after 31 December 2023:

  • On 11 January 2024, the Company announced it had executed a Tenement Purchase Agreement with Rimfire Pacific Mining Limited (ASX: RIM), to sell an unencumbered 100% of the Company's Exploration Licenses 8572 and 8599 which lie adjacent to Rimfire's Bald Hill Cobalt prospect, 30 kilometres west of Broken Hill, NSW.
  • Consideration for the sale comprises $150,000 worth of RIM shares at an issue price of $0.0186 per share, plus an additional $150,000 worth of RIM shares at an issue price of $0.0279 per share, conditional on the RIM 5-day volume weighted average share price being greater than $0.0279 at any time after completion.
  • On 14 March 2024, Mr David Drakeley and Mr Jack Sedgwick resigned as Non-Executive Directors and Mr Joel Logan and Mr Eduardo Robaina were appointed as Non-Executive Directors of the Company.

Castillo Copper is listed on the LSE and ASX under the ticker "CCZ".

for the half-year ended 31 December 2023

Note31 December 2023 $31 December 2022 $
Interest revenue22,8503,453
Revenue22,8503,453
Listing and public company expenses(91,829)(76,956)
Accounting and audit expenses(65,090)(57,074)
Consulting and directors' fees(313,919)(250,113)
Impairment of exploration expenditure4(518,361)-
Other expenses3(230,908)(244,982)
Loss before income tax(1,197,257)(625,672)
Income tax expense--
Loss after income tax(1,197,257)(625,672)

Other comprehensive (loss) / income

Items that may be reclassified subsequently to profit or loss

Note31 December 2023 $31 December 2022 $
Exchange differences on translation of foreign operations(4,953)2,179
Total comprehensive loss for the half-year(1,202,210)(623,493)

Loss per share attributable to owners of Castillo Copper Limited

Note31 December 2023 $31 December 2022 $
Basic loss per share (cents per share)(0.09)(0.05)
Diluted loss per share (cents per share)(0.09)(0.05)

The accompanying notes form part of these financial statements.

Condensed Consolidated Statement of Financial Position

as at 31 December 2023

Note31 December 2023 $30 June 2023 $
Assets
Current Assets
Cash and cash equivalents1,747,9982,897,611
Assets held for sale4300,000-
Other receivables120,97978,845
Total Current Assets2,168,9772,976,456
Non-Current Assets
Other receivables486,961486,961
Deferred exploration and evaluation expenditure48,297,2828,736,198
Total Non-Current Assets8,784,2439,223,159
Total Assets10,953,22012,199,615
Current Liabilities
Trade and other payables84,161128,346
Total Current Liabilities84,161128,346
Total Liabilities84,161128,346
Net Assets10,869,05912,071,269
Equity
Issued capital535,964,39635,964,396
Reserves4,076,7824,081,735
Accumulated losses(29,172,119)(27,974,862)
Total Equity10,869,05912,071,269

The accompanying notes form part of these financial statements.

Condensed Consolidated Statement of Changes in Equity

for the half-year ended 31 December 2023

NoteIssued Capital $Share-Based Payment Reserve $Foreign Currency Translation Reserve $Accumulated Losses $Total $
Balance as at 1 July 202235,964,3964,230,962(150,586)(21,032,634)19,012,138
Loss for the half-year---(625,672)(625,672)
Other comprehensive income--2,179-2,179
Total comprehensive loss for the half-year--2,179(625,672)(623,493)
Balance at 31 December 202235,964,3964,230,962(148,407)(21,658,306)18,388,645
Balance as at 1 July 202335,964,3964,230,962(149,227)(27,974,862)12,071,269
Loss for the half-year---(1,197,257)(1,197,257)
Other comprehensive income--(4,953)-(4,953)
Total comprehensive loss for the half-year--(4,953)(1,197,257)(1,202,210)
Balance at 31 December 2023535,964,3964,230,962(154,180)(29,172,119)10,869,059

The accompanying notes form part of these financial statements.

Condensed Consolidated Statement of Cash Flows

for the half-year ended 31 December 2023

31 December 2023 $31 December 2022 $
Cash flows from operating activities
Payments to suppliers and employees(654,600)(732,607)
Interest received22,8503,453
Interest paid-(1,936)
Net cash outflow from operating activities(631,750)(731,090)
Cash flows from investing activities
Tenement expenditure guarantees-(82,000)
Payments for exploration and evaluation expenditure(509,356)(1,113,264)
Net cash outflow from investing activities(509,356)(1,195,264)
Cash flows from financing activities
Net cash inflow from financing activities--
Net decrease in cash and cash equivalents(1,141,106)(1,926,354)
Cash and cash equivalents at 1 July2,897,6115,754,049
Effect of exchange rate fluctuations on cash held(8,507)20,636
Cash and cash equivalents at 31 December1,747,9983,848,331

The accompanying notes form part of these financial statements.

Notes to the Condensed Consolidated Financial Statements

for the half-year ended 31 December 2023

NOTE 1: STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES

Corporate Information

This general purpose financial report of Castillo Copper Limited and its subsidiaries (the Group) for the half-year ended 31 December 2023 was authorised for issue in accordance with a resolution of the directors on 14 March 2024.

Castillo Copper Limited is a company limited by shares incorporated in Australia whose shares are publicly traded on the Australian Securities Exchange and the London Stock Exchange.

The nature of the operations and principal activities of the Group are described in the Directors' Report.

Basis of Preparation

This financial report for the half-year ended 31 December 2023 has been prepared in accordance with AASB 134 Interim Financial Reporting and the Corporations Act 2001. The Group is a for profit entity for financial reporting purposes under Australian Accounting Standards. Compliance with AASB 134 ensures compliance with IAS 34 Interim Financial Reporting.

These half-year financial statements do not include all notes of the type normally included within the annual financial statements and therefore cannot be expected to provide as full an understanding of the financial performance, financial position and financing and investing activities of the Group as the full financial statements.

It is recommended that the half-year financial statements be read in conjunction with the annual financial statements for the year ended 30 June 2023 and considered together with any public announcements made by Castillo Copper Limited during the half-year ended 31 December 2023 in accordance with the continuous disclosure obligations of the ASX listing rules.

For the purpose of preparing the half-year report, the half-year has been treated as a discrete reporting period. The accounting policies and methods of computation adopted are consistent with those of the previous financial year. These accounting policies are consistent with Australian Accounting Standards and with International Financial Reporting Standards.

The consolidated financial statements have been prepared on the basis of historical cost.

Going Concern

Notes to the Condensed Consolidated Financial Statements

for the half-year ended 31 December 2023

The Group incurred a net loss for the period ended 31 December 2023 of $1,197,257 and a net cash outflow from operating activities of $631,750. At 31 December 2023, the Group had a net asset position of $10,869,059 and working capital of $2,084,814. The cash and cash equivalents balance at 31 December 2023 was $1,747,998.

Notwithstanding these results, the Directors believe that the Company will be able to continue as a going concern and as a result the financial statements have been prepared on a going concern basis. The interim financial report has been prepared on the assumption that the Group is a going concern for the following reasons:

NOTE 1: STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

  • the ability of the Group to scale back parts of its operations and reduce costs if required;
  • the Board is of the opinion that the Group has, or shall have access to, sufficient funds to meet the planned corporate activities and working capital requirements; and
  • as the Group is an ASX-listed entity, the Group has the ability to raise additional funds, if required.

In the event that the Group is unable to achieve the actions noted above, there is a material uncertainty that may cast significant doubt as to the Group's ability to continue as a going concern, and it may be required to realise its assets at amounts different to those currently recognised, settle liabilities other than in the ordinary course of business and make provisions for other costs which may arise as a result of cessation or curtailment of normal business operations.

New and amending Accounting Standards and Interpretations

In the half-year ended 31 December 2023, the Directors have reviewed all of the new and revised Standards and Interpretations issued by the AASB that are relevant to the Group's operations and effective for annual reporting periods beginning on or after 1 July 2023. As a result of this review, the Directors have determined that there is no material impact of the new and revised Standards and Interpretations on the Group and, therefore, no material change is necessary to Group accounting policies.

The Directors have also reviewed all new Standards and Interpretations that have been issued but are not yet effective for the half-year ended 31 December 2023. As a result of this review the Directors have determined that there is no impact, material or otherwise, of the new and revised Standards and Interpretations on the Group's business and, therefore, no change necessary to the Group accounting policies.

NOTE 2: SEGMENT REPORTING

Notes to the Condensed Consolidated Financial Statements

for the half-year ended 31 December 2023

Management has determined the operating segments based on the reports reviewed by the Board of Directors that are used to make strategic decisions. The entity has four geographical segments being exploration in Northwest Queensland (NWQ), New South Wales (Cangai), New South Wales (Broken Hill) and Zambia. Revenue attributable to all segments is immaterial. Allocation of asset, liabilities, income and expenses to each segment is shown below:

December 2023NWQ (QLD)Cangai (NSW)Broken Hill (NSW)ZambiaUnallocatedTotal
Segment assets and liabilities$$$$$$
Current assets--300,000-1,868,9772,168,977
Non-current assets6,672,992321,1001,102,026688,0041218,784,243
Current liabilities----(84,161)(84,161)
Segment income and expenses
Interest income----22,85022,850
Other expenses-(185,891)(203,145)(154,738)(676,333)(1,220,107)
Total-(185,891)(203,145)(154,738)(653,483)(1,197,257)
Notes to the Condensed Consolidated Financial Statements
for the half-year ended 31 December 2023
NOTE 2: SEGMENT REPORTING (CONTINUED)
December 2022NWQ (QLD)Cangai (NSW)Broken Hill (NSW)ZambiaUnallocatedTotal
Segment assets and liabilities$$$$$$
Current assets----4,061,5044,061,504
Non-current assets6,416,7425,498,3711,374,4961,076,91212114,366,642
Current liabilities----(39,501)(39,501)
Segment income and expenses
Interest income----3,4533,453
Interest expense----(1,936)(1,936)
Other expenses----(627,189)(627,189)
Total----(625,672)(625,672)
NOTE 3: OTHER EXPENSES
Included in other expenses are the following items:
6 months to 31 December 2023 $6 months to 31 December 2022 $
Insurance37,58061,299
Interest expenses-1,936
Marketing and investor relations181,425175,461
Foreign exchange losses / (gains)8,505(20,589)
Legal fees4,3047,368
Travel and accommodation262,948
Other expenses(932)16,559
230,908244,982
Notes to the Condensed Consolidated Financial Statements
for the half-year ended 31 December 2023
NOTE 4: DEFERRED EXPLORATION AND EVALUATION EXPENDITURE
Exploration and evaluation phase:6 months to 31 December 2023 $Year ended 30 June 2023 $
Opening balance8,736,19812,899,486
Exploration and evaluation expenditure during the period379,4451,509,584
Impairment 1,2(518,361)(5,672,872)
Re-assessed as assets held for sale 2(300,000)-
Closing balance8,297,2828,736,198

The ultimate recoupment of costs carried forward as exploration expenditure is dependent on the successful development and commercial exploitation or sale of the respective areas of interest.

NOTE 4: DEFERRED EXPLORATION AND EVALUATION EXPENDITURE (CONTINUED)

1 At each reporting date, the Group undertakes an assessment of the carrying amount of its exploration and evaluation assets. As at 31 December 2023, the Group identified indicators of impairment on certain exploration and evaluation assets under AASB 6 Exploration and Evaluation of Mineral Resources. As a result of this review, an impairment charge of $315,216 was recognised in the statement of profit or loss and other comprehensive income in relation to areas of interest where no future exploration and evaluation activities are expected.

2 On 11 January 2024, the Company announced it had executed a Tenement Purchase Agreement with Rimfire Pacific Mining Limited (ASX: RIM), to sell an unencumbered 100% of the Company's Exploration Licenses 8572 and 8599 which lie adjacent to Rimfire's Bald Hill Cobalt prospect, 30 kilometres west of Broken Hill, NSW. As a result, these assets have been assessed as held for sale and impaired down to fair value less cost to sell at 31 December 2023, resulting in impairment charge of $203,145 recognised in the statement of profit or loss and other comprehensive income.

NOTE 5: ISSUED CAPITAL

6 months to 31 December 2023 $Year ended 30 June 2023 $
Issued and paid up capital
Issued and fully paid35,964,39635,964,396
Notes to the Condensed Consolidated Financial Statements
for the half-year ended 31 December 2023
6 months to 31 December 2023Year ended 30 June 2023
Number of shares$Number of shares$
Movements in issued capital
Opening balance1,299,505,35535,964,3961,299,505,35535,964,396
Closing balance1,299,505,35535,964,3961,299,505,35535,964,396

Share options

At 31 December 2023 there were 11,000,000 (30 June 2023: 132,699,971) unlisted options with various exercise prices and expiry dates and 163,439,781 listed options (ASX:CCZOA, CCZOB & CCZOB), with various exercise prices and expiry dates.

The following share-based payment arrangements were in place during the period:

NOTE 5: ISSUED CAPITAL (CONTINUED)

SeriesNumberGrant dateExpiry dateExercise price $Fair value at grant dateVesting date
114,285,71415 June 202131 July 2024$0.08$0.021815 June 2021
22,955,66516 June 20211 August 2024£0.044$0.020516 June 2021
32,418,0445 August 202131 July 2024$0.08$0.0075 August 2021
4462,3794 August 20211 August 2024£0.044$0.01684 August 2021
54,000,00027 October 202131 July 2024$0.08$0.00727 October 2021
63,000,00030 November 202131 July 2024$0.08$0.01030 November 2021
78,000,0001 February 202231 January 2025$0.08$0.0071 February 2022

During the half-year 121,699,971 options expired, with various exercise prices and expiry dates.

No options were exercised during the period.

Weighted average fair value

Notes to the Condensed Consolidated Financial Statements

for the half-year ended 31 December 2023

The fair value of the equity-settled unlisted options granted in prior periods was estimated as at the date of grant using the Black and Scholes model taking into account the terms and conditions upon which they were granted, as follows:

Series

67
Expected volatility (%)99100
Risk-free interest rate (%)0.871.21
Expected life of option (years)2.73
Exercise price (cents/pence)88
Grant date share price (cents/pence)3.42.6

The expected life of the options is based on historical data and is not necessarily indicative of exercise patterns that may occur. The expected volatility reflects the assumption that the historical volatility is indicative of future trends, which may also not necessarily be the actual outcome. No other features of options granted were incorporated into the measurement of fair value.

Performance Shares

At 31 December 2023 there were 46,875,000 Class A performance shares and 46,875,000 Class B performance shares on issue in relation to the Zambian tenements held by Zed Copper Pty Ltd.

46,875,000 Class A performance shares

Conditions precedent - converting to an equal number of CCZ shares on delineation of a JORC resource of 200,000 tonnes of contained copper at a minimum grade of 0.5% within 5 years of execution of the Share Sale Agreement.

46,875,000 Class B performance shares

Conditions precedent - converting to an equal number CCZ shares on completion of a preliminary feasibility study demonstrating an internal rate of return greater than 25% within 5 years of execution of the Share Sale Agreement

NOTE 6: CONTINGENT LIABILITIES

There has been no change in contingent liabilities since the last annual reporting date.

Notes to the Condensed Consolidated Financial Statements

for the half-year ended 31 December 2023

NOTE 7: SUBSEQUENT EVENTS

The following significant events occurred after 31 December 2023:

  • On 11 January 2024, the Company announced it had executed a Tenement Purchase Agreement with Rimfire Pacific Mining Limited (ASX: RIM), to sell an unencumbered 100% of the Company's Exploration Licenses 8572 and 8599 which lie adjacent to Rimfire's Bald Hill Cobalt prospect, 30 kilometres west of Broken Hill, NSW.
  • Consideration for the sale comprises $150,000 worth of RIM shares at an issue price of $0.0186 per share, plus an additional $150,000 worth of RIM shares at an issue price of $0.0279 per share, conditional on the RIM 5-day volume weighted average share price being greater than $0.0279 at any time after completion.
  • On 14 March 2024, Mr David Drakeley and Mr Jack Sedgwick resigned as Non-Executive Directors and Mr Joel Logan and Mr Eduardo Robaina were appointed as Non-Executive Directors of the Company.

NOTE 8: FINANCIAL INSTRUMENTS

The Group has a number of financial instruments which are not measured at fair value on a recurring basis. The carrying amount of these financial instruments approximates their fair values.

DIRECTORS' DECLARATION

In accordance with a resolution of the directors of Castillo Copper Limited (the 'Company'), the directors of the Company declare that:

  • The financial statements and notes are in accordance with the Corporations Act 2001, including:
  • complying with Accounting Standard AASB 134: Interim Financial Reporting; the Corporations Regulations 2001 and other mandatory professional reporting requirements; and
  • giving a true and fair view of the Group's financial position as at 31 December 2023 and of its performance for the half-year ended on that date.
  • In the directors' opinion there are reasonable grounds to believe that the Company will be able to pay its debts as and when they become due and payable.

Gerrard (Ged) Hall

Non-Executive Chairman

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note