Q3 Production Results

20232024
Q1 2023Q2 2023Q3 2023TOTAL Q1, Q2 & Q3Q1 2024Q2 2024Q3 2024% change vs Q2TOTAL Q1, Q2 & Q3% change
Tonnes of concentrate processed194.11,016.6314.01,524.7668.6777.51,227.8+57.9%2,673.9+75.4%
Tonnes of vanadium pentoxide produced*31.3141.447.3220.081.687.652.3-40.3%221.5+0.7%
Tonnes of molybdenum produced**6.514.16.427.07.16.97.1+2.9%21.1-21.9%
Tonnes of nickel produced***9.750.815.776.233.438.863.9+64.7%136.1+78.6%

* partly contained in ammonium metavanadate

** in ferro-molybdenum

*** in nickel concentrate

Commentary

As first announced in July, the Company undertook test processing of stockpiled nickel-rich residues held at the plant site during Q3. The nickel residues contained lower levels of vanadium than historic bought-in catalysts, resulting in 40.3% less vanadium production in Q3 than Q2, but this was offset by having minimal raw material costs. Overall, molybdenum output remained consistent between the quarters. The metallurgical recoveries of vanadium and molybdenum from the nickel residues in the testing period did not sufficiently replicate the results achieved in the laboratory and the Company has decided to revert to the treatment of standard concentrate raw materials, although this decision might change in future when different metal prices prevail.

Production of vanadium pentoxide for the year to date is similar to that of 2023 while molybdenum output has decreased by 21.9%, comparatively, mainly as result of metal content variations within the concentrates treated.

During Q3 2024 the average prices of vanadium pentoxide and molybdenum were US$5.3/lb (Q3 2023: US$7.4/lb) and US$51.2/kg (Q3 2023: 54.1/kg), respectively.

Production Outlook

Following the outcome of the commercial scale testing of the nickel-rich residues the Company has reverted to processing bought-in catalysts on a non-tolling basis.

The Company has sufficient catalysts for processing during Q4 2024 either already at the plant site or on order.

Research and development are ongoing to determine whether the Company can process the upgraded nickel concentrates to produce ferro-nickel.

Commenting on the production results, Nick Bridgen, CEO of Ferro-Alloy Resources said:

"Current trading conditions are difficult, but the operation continues to make a contribution to overheads whilst we complete the main project feasibility study."

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note