Jamaica Update: Commencement of Piston Coring
United Oil & Gas PLC has completed Stage 2 of its Surface Geochemical Exploration programme on the Walton-Morant Licence offshore Jamaica, which included successful seabed heat-flow measurements, and has now commenced Stage 3 piston coring operations. This critical phase involves up to 42 planned cores, primarily in the Walton Basin near the Colibri, Streamertail, and Oriole prospects, with additional key locations in the Morant Basin, aiming to physically confirm an active petroleum system and further de-risk the licence. The piston coring operations are expected to take approximately one week, with results to be analysed in Houston, Texas, representing a significant step towards advancing the project's technical evaluation and commercial discussions.
Select text to share a quote on X · sign in to keep highlights & notes in your UOG notes
United Oil & Gas Plc (AIM: UOG), the oil and gas company with a high-impact exploration asset in Jamaica and a development asset in the UK, is pleased to announce the completion of Stage 2 of its Surface Geochemical Exploration ("SGE") programme and the commencement of Stage 3 piston coring operations on the Walton-Morant Licence offshore Jamaica.
Highlights
- Stage 2 seabed heat-flow measurements successfully completed
- Stage 3 piston coring now underway - the critical phase of the programme
- Up to 42 cores planned, primarily within the Walton Basin near the key Colibri, Streamertail and Oriole prospects, with select key locations in the Morant basin also identified
- Programme designed to physically confirm an active petroleum system and further de-risk the licence
Operational Update
Stage 2 heat-flow measurements have now been completed and will provide valuable technical information for future geological modelling. Data from the previously completed Stage 1 high-resolution multibeam echosounder ("MBES") acquisition have also been integrated with the existing seismic dataset. This has resulted in the identification of numerous seabed features of interest and the selection of 42 optimal piston core locations for Stage 3 of the survey.
Figure 1 (above): Conceptual illustration of MBES seabed mapping integrated with seismic interpretation to identify seabed features of interest and optimise piston core locations (not to scale).*
Stage 3 piston coring is now underway, with up to 42 cores planned across priority areas, predominantly within the Walton Basin and in proximity to the Company's Colibri, Streamertail and Oriole prospects, where existing 3D seismic and supporting datasets indicate potential hydrocarbon migration. Additionally, key locations in the Morant basin will also be cored.
This stage of the survey will recover seabed sediment samples for geochemical analysis to test for thermogenic hydrocarbons, which if present, will provide direct physical evidence of an active petroleum system offshore Jamaica.
The piston coring operations are expected to take approximately one week, subject to weather conditions, with samples then shipped to Houston, Texas for laboratory analysis.
The SGE programme represents a key operational step toward further de-risking the Walton-Morant Licence and advancing the project's technical evaluation and commercial discussions.
Brian Larkin, CEO of United Oil & Gas, commented:
"The completion of heat-flow measurements and commencement of piston coring marks a major step forward in our Jamaica exploration programme. The integration of the acquired data has allowed us to optimise coring locations in the Walton Basin, including near our key Colibri, Streamertail and Oriole prospects, as well as at key locations in the Morant Basin.
Piston coring is the defining phase of this programme, providing the opportunity to physically confirm the presence of thermogenic hydrocarbons offshore Jamaica. We look forward to completing operations and updating the market in due course."
Additional Information
A recent discussion with CEO Brian Larkin outlining progress of the SGE programme and next steps is available to view here:
"On the Rocks" podcast episode 2, where United discuss the completed Stage 1 MBES and next steps of the SGE Jamaica survey 2026 is available to view here:
"On the Rocks" podcast episode 1, where United discuss the Evidence for an active Petroleum System offshore Jamaica, is available to view here:
*Image credit: NOAA Photo Library (via Flickr) - "Artist's conception of multibeam sonar on NOAA Ship NANCY FOSTER" (Image ID: fis01334; Credit: NOS/NCCOS/CCMA), licensed CC BY 2.0. Image cropped/adapted.
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.