Mushima North - Update on planned drill programme
Tertiary Minerals commences diamond drilling programme at Mushima North Project to test mineralisation depth and primary sulphide potential.
- Planned diamond drill programme up to 1,000m
- Number of planned holes up to 4
- Hole length approximately 250m each
- Exploration Target - Discovery Zone 15-30 million tonnes at 40-60 g/t silver equivalent
- Vertical depth to be tested approximately 200m
- Previous RC drilling completed over 3,600m
Select text to share a quote on X · sign in to keep highlights & notes in your TYM notes
Tertiary Minerals plc (AIM: TYM) is pleased to provide an update on the planned activities at Target A1, Mushima North Project (“Mushima North” or the “Project”), Zambia, including the deeper drill programme announced on the 7 October 2026.
Target A1 is a polymetallic, silver-copper-zinc prospect, where the Company has previously reported a near-surface Exploration Target of 15-30 million tonnes at 40-60 g/t silver equivalent (up to 58 million ounces silver equivalent) at the Discovery Zone.
Mushima North is located in the prospective Iron-Oxide-Copper-Gold region of Zambia and is located 28km to the east of the historic Kalengwa copper-silver mine which is currently under redevelopment.
Highlights:
Mobilisation to site has commenced with drilling to start by early next week.
Up to 1,000m diamond drill programme planned with up to four holes of approximately 250m length each.
The aim of the drilling is to test for the continuation of mineralisation beneath the Discovery Zone, targeting higher-grade mineralisation and the potential for an underlying primary sulphide deposit.
The last remaining assay results from the Phase 4 drill programme and initial metallurgical testwork results are expected imminently.
Plan remains to produce a Mineral Resource Estimate before the end of the year.
Richard Belcher, Managing Director of Tertiary Minerals plc, commented:
“We are very excited to be back drilling again this field season at the Discovery Zone where we have made great progress and have already completed over 3,600m of Reverse Circulation drilling to support our Mineral Resource Estimation work. This programme marks our first diamond drill programme on the Project and will test for the continuation of mineralisation below the Discovery Zone and, in particular, for the potential of underlying primary sulphides.
“With the last of the laboratory results for the recent Phase 4 drilling due imminently, along with the initial metallurgical testwork results, we are then positioned for a very strong finish to this year’s Zambian field season. I look forward to providing further updates on these results and the drill programme in the coming weeks.”
Drilling Programme
A programme of approximately 1,000m diamond drilling is planned as an initial “proof of concept” programme to test for the continuation of mineralisation at depth beyond the current mineralisation being defined by the recent Phase 4 programme. Currently, up to 4 holes, each between 200m and 250m in length and inclined at approximately -60 to -70°, are planned. This will test for mineralisation up to a vertical depth of approximately 200m, considerably deeper than the current Exploration Target (~95m vertically) and the recent Phase 4 drill programme (maximum hole depth 125m vertically).
The new drill programme at Target A1 is designed to:
Test the depth extent of mineralisation below the Discovery Zone and the potential for primary sulphide mineralisation.
Increase the geological (lithological and structural) understanding of the deposit to support orebody knowledge and future drilling and technical studies.
Provide drill core samples for additional metallurgical and technical testwork.
The drill programme is expected to commence early next week and is estimated to take approximately 4 weeks to complete. Samples will be initially analysed on site using a portable X-Ray Fluorescence (“pXRF”) analyser for copper and zinc. Selected mineralised intervals will also be submitted for external assaying at a certified laboratory for a wider suite of elements than in previous analysis, including silver, copper, zinc, cobalt, bismuth, antimony, gallium, germanium and rare earth elements. These will be submitted in regular batches throughout the drill programme, with the first results expected approximately 6-8 weeks after the initial batch is submitted.
Figure 1. The northern part of the Target A1 copper-in-soil anomaly, including the plan view of the 3D mineralisation model of the Discovery Zone used to help derive the Exploration Target (500m long, 300m wide and 75m thick), and the location of the shallow, copper mineralisation recently intersected in the Western Zone. Completed holes from the recent Phase 4 programme (green) and earlier drill phases (yellow).
Target A1 Silver Oxide Discovery
The Company has previously reported a JORC-compliant Exploration Target for the Discovery Zone of between 15 and 30 million tonnes with an average grade of between 40 and 60 g/t silver equivalent for up to 58 million ounces silver equivalent. As currently defined, this is a near-surface, tabular body located within the oxide zone and is some 500m long, 300m wide and up to 75m thick (based on a lower cut-off of 25 g/t silver equivalent). The mineralisation remains open to the northwest, southwest and at depth, so the full extent and true geometry of the mineralisation remain to be determined. Further information on the Exploration Target can be found in the Company’s announcement on 30 March 2026.
Recent Phase 4 drilling defined a higher-grade zone with a surface footprint of up to 400m by 150m, and mineralisation down to a vertical depth of 125m, the current maximum depth of drilling, and the mineralisation remains open at depth. The potential for the near-surface oxide mineralisation to transition to underlying sulphide mineralisation has yet to be tested. Elevated bismuth (up to 0.53%), antimony (up to 0.22%), cobalt (0.39%) and gallium (up to 40 g/t) are also associated with the mineralisation, but, as yet, have not been fully investigated.
A new shallow, copper mineralised zone located approximately 900m west-southwest from the Discovery Zone was also identified during the Phase 4 drilling. This zone, called the Western Zone, has also only been intersected in scout drilling and remains open.
Mushima North Project
Figure 2. Geological map of the Mushima North Project showing the locations of the priority targets within the licence area and their distance from Target A1 relative to 5km radius rings.
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.