Further to its announcement of 16 October 2024, the Company is pleased to advise that drilling on its Mushima North Copper Project in Zambia has intersected widespread copper and zinc mineralisation with multiple holes ending in mineralisation.

Highlights:

  • Twenty-five holes drilled to a maximum depth of 112m on three traverses at Target A1 and one traverse at Target C1.
  • Field portable X-Ray Fluorescence ("pXRF") analysis of drill samples now completed.
  • Wide downhole intervals of largely coincident copper and zinc mineralisation found on and around Traverse 1 at Target A1 in in drill holes spanning an open ended 350m (east-west) x 170m (north-south) area, e.g.:

o Hole 24TMN024: 33m grading 0.21% copper from 22m

§ inc. 6m downhole grading 0.58% copper from 47m

§ inc. 1m downhole grading 1.04% copper from 49m

o Hole 24TMN003: 8m grading 0.10% copper from 33m

§ And 28m grading 0.30% zinc from 41m to end of hole

o Hole 24TMN004: 55m grading 0.18% copper from 14m to end of hole

§ and 26m grading 0.27% zinc from 45m to end of hole

o Hole 24TMN005: 43m grading 0.14% copper from 31m to end of hole

§ and 58m grading 0.27% zinc from 16m to end of hole

o Hole 24MN008P: 11m grading 0.14% copper from 65m

§ and 62m grading 0.41% zinc from 19m

  • Narrower intervals of similar copper mineralisation intersected drill holes on Traverses 2 and 3 at Target A1, and on the traverse at Target C1.
  • Ground magnetic survey now in progress at Target A1 to assist structural and stratigraphic interpretation.
  • Selected samples to be submitted for laboratory check analysis and for precious metal analysis.

Detailed information and a table of significant drill results follows, together with a drill hole location plan and other images.

Patrick Cheetham, Executive Chairman of Tertiary Minerals plc said:

"Our first drill programme at Mushima North has delivered exciting results and demonstrates that the large copper-in-soil anomaly at Target A1 is rooted in thick intervals of copper and zinc mineralisation over a wide area. The aircore drill rig used for this programme allowed us to complete a meaningful number of widely spaced drill-holes, but the depth limitations of this reconnaissance drilling method meant that many holes ended in mineralisation.

"Use of pXRF analysis in near real-time allowed us to modify the drill programme as it progressed with the result that the last hole in the programme hit the highest grades - grades similar to those being mined elsewhere in northwest Zambia. So far we have only scratched the surface at Mushima North and work is now in progress to help us plan follow-up work for the 2025 field season."

Detailed Information

The Mushima North Copper Project (Licence 27068-HQ-LEL) is held through Group company Copernicus Minerals Limited ("Copernicus") which is 90% owned by Tertiary Minerals (Zambia) Limited. Copernicus is in the process of taking a transfer of the licence through its agreement with licence holder and Copernicus 10% shareholder, Mwashia Resources Limited ("Mwashia") (see announcement dated 26 February 2024).

The project lies 20km to the east of the Kalengwa copper mine which is now being reopened and is expected to produce 15,000 tonnes of copper annually. Kalengwa was one of the highest-grade copper deposits ever to be mined in Zambia. In the 1970s high-grade ore, in excess of 26% copper, was trucked for direct smelting at other mines in the Copperbelt.

Kalengwa was discovered by drill testing a coincident copper-in-soil anomaly and gravity anomaly and has characteristics of the Iron-Oxide-Copper-Gold ("IOCG") class of deposits.

In 2023, following a detailed targeting project, Tertiary carried out soil sampling over the A1, A2 and C1 targets, defining significant copper in soil anomalies in all three areas (see announcements dated 5 October and 16 October 2023).

A1 Target Drill Testing

The A1 target, a copper-in-soil anomaly, covers an area of up to approximately 3km north-south by 1.5km east-west.

In the recently completed drill programme, 17 shallow holes were drilled on three traverses using a combination of aircore and reverse circulation methods as an initial test of the A1 soil anomaly.

Drill Traverse 1 was completed west-east over the northern part of the anomaly and initially comprised 5 holes drilled at 100m intervals an angle of -60 degrees to the east. Samples were collected at 1m intervals and analysed using a pXRF. Additional holes were sited to infill the hole spacing at 50m intervals on the eastern half of the traverse and the traverse was extended to the east. Wide zones of copper and zinc were intersected over the majority of holes on Traverse 1.

A full tabulation of drill results is given in Table 1 below and details of the reporting grade cut-offs is given in the accompanying notes.

The final hole in the whole programme (24TMN024) was drilled vertically 170m south of Traverse 1 and intersected the highest grades of the whole programme - up to 1% copper - grades similar to those being mined at major mining operations elsewhere in northwest Zambia. Unfortunately, there was insufficient time to drill further holes in the current programme.

Preliminary logging of drill samples indicates that the geological sequence intersected at A1 on Traverse 1 is a series of altered ferruginous sandstones, siltstones and conglomerates with mineralisation hosted primarily in ferruginous and graphitic conglomerates. Many of the clasts are highly weathered or leached out (vuggy) suggesting the possibility that leaching of copper may have occurred. This is a permissive lithological setting for economic copper deposits in northwest Zambia and is similar to that hosting copper mineralisation at the Kalengwa mine.

The association of zinc and copper mineralisation at Mushima North requires further evaluation. Arsenic is also highly anomalous in some holes (up to 0.4%) and samples need to be analysed for precious metals.

The mineralisation intersected on Traverse 1 is best developed on the western side of the soil anomaly and continues beyond the soil anomaly to the east where it is open ended.

Drill Traverse 2 comprised five 100m spaced holes (24TMN006 to 24TMN010) in the western part of the A1 soil anomaly, approximately 500m south of Traverse 1. A similar sedimentary sequence was intersected as in Traverse 1 and whilst copper values on this traverse were lower, all holes were consistently anomalous in copper in the low -mid 100s of parts per million copper throughout. It is believed that these holes were placed too far to the west and this traverse should be extended to the east in future.

Drill Traverse 3 is located approximately 750m further south from Traverse 2. and comprised four 100m spaced aircore holes (24TMN011 to 24TMN014). The pXRF results on Traverse 3 are similar to those on Traverse 2 and this traverse also needs to be extended to the east in future programmes.

C1 Target Area

The principal target at C1 is for IOCG style mineralisation associated with coincident magnetic and gravity anomalies defined by BHP in an earlier phase of exploration. This target is deep and testing was beyond the depth capability of the drill rig used at Mushima North during the recent programme.

However, seven shallow aircore holes (24TMN016 to 24TMN022) were drilled vertically at 100m intervals on a north-south traverse to test a copper-in-soil geochemical anomaly for shallow mineralisation.

A number of narrow intersections of copper mineralisation were made as shown in Table 2 below. Mineralisation occurs in a mixed sequence of dolomitic siltstones and granite with iron and copper sulphide minerals, pyrite and chalcopyrite being logged.

The primary IOCG target at C1 remains untested.

Table 1: Target A1, Mushima North Significant Aircore/Reverse Circulation Drilling Results

Hole NumberInterval (m)% Copper% ZincFrom (m)To (m)Note
Traverse 1From West to East
24TMN0032m0.10% copper28m30m
8m0.10% copper33m41m
28m0.30% zinc41m69mHole ended in mineralisation
24TMN006P21m0.16% copper22m43m
2m0.10% copper53m55m
46m0.27% zinc22m68m
24TMN00455m0.18% copper14m71mHole ended in mineralisation
2m0.28% zinc21m23m
26m0.27% zinc45m71mHole ended in mineralisation
24TMN008P2m0.13% copper24m26m
11m0.14% copper65m76m
62m0.41% zinc19m82m
24TMN00543m0.14% copper31m74mHole ended in mineralisation
58m0.27% zinc16m74mHole ended in mineralisation
24TMN01548m0.16% copper22m70mHole ended in mineralisation
24TMN0233m0.11% copper39m42m
55m0.18% copper54m112mHole ended in mineralisation
9m0.31% copper79m88m
26m0.20% zinc84m112mHole ended in mineralisation
24TMN024Located170m due south of 24TMN015
33m0.21% copper22m57m
6m0.58% copper47m53m
1m1.04% copper49m50m
Traverse 2From West to East
24TMN0069m0.13% copper33m42m
5m0.11% copper80m85m
Traverse 3From West to East
24TMN0119m0.20% zinc8m17m
24TMN0124m0.10% copper31m35m

Table 2: Target C1, Mushima North Significant Aircore/Reverse Circulation Drilling Results

Hole NumberInterval (m)% Copper% ZincFrom(m)To (m)Note
Traverse drilled South to North
24TMN0163m0.11% copper29m32m
24TMN0173m0.12% copper28m31mHole ended in mineralisation
24TMN0192m0.10% copper28m30m

Notes:

Reporting cut-offs:

For copper - a mineralised interval of minimum 2m thickness with a 0.1% start/finish threshold and having an average grade of >0.1% copper.

For zinc - a mineralised interval of minimum 2m thickness with a 0.2% start/finish threshold and having an average grade of >0.2% zinc.

Where voids occur within continuous sampled lengths, the average grade reported is the average grade of the samples actually collected and the reported sample interval excludes the extent of the voids which are likely due to washing out of clay or other soft materials, possibly in fault zones. The following voids were noted:

Hole 24TMN004 drilled through a 2m void from 43-45m.

Hole 24TMN008P drilled through a 1m void from 17-18m and 30-31m downhole.

Hole 24TMN023 drilled through voids from 70-71, 88-89m and 95-96m downhole.

Hole 24TMN024 drilled through voids from 46-47m and 54-55m downhole.

REPORTED THICKNESSES ARE DOWNHOLE THICKNESSES AND TRUE THICKNESS ARE UNKNOWN.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note