Tirzzit Drill Campaign Update
Tirzzit drill campaign update: 187 metres drilled of 2,770m programme with visible copper mineralisation observed.
- Metres drilled to date 187m
- Total anticipated drill programme 2,770m
- Historic BRPM drill intersection 1 3.16% Cu over 2.5m
- Historic BRPM drill intersection 2 0.60% Cu over 11.4m
Select text to share a quote on X · sign in to keep highlights & notes in your TLM notes
Talisman Metals PLC ("Talisman" or the "Company") provides an update on its ongoing drill program at Tirzzit (see press release of 2 September 2026). As of September 11, 187 meters have been drilled, out of the anticipated 2,770m programme, and the campaign has intersected copper mineralisation by way of visible malachite (a copper-bearing mineral) in the RC drilled material (see Picture 2 and Table 1). The Company plans to send the first batch of samples for assay analysis in the next week, with results available within four to six weeks from then.
Pictures 1 & 2: RC drill rig in action and malachite (green) in panned material from drill hole #1
Tim McCutcheon, Talisman's CEO stated: "We just started our drill programme, and we are already intersecting visual copper mineralisation within the Tirzzit sediment-hosted deposit. There is still quite a lot of work ahead, but to start off the campaign this way is very satisfying. The team is working smoothly, the pace of drilling is set to accelerate and we look forward to reporting our first assay results as they become available."
Table 1: RC drill hole location and description, all holes vertical
Map 1: To-date completed drill hole locations
QA/QC Protocols
Talisman Metals PLC followed industry standard procedures for the work carried out on the Tirzzit Copper Project, incorporating a quality assurance/quality control (QA/QC) program. Blank, duplicate, and standard samples were inserted into the sample sequence and will be sent to the laboratory for analysis. No significant QA/QC issues were detected during the review of the data. Talisman Metals PLC is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data referred to herein.
About the Tirzzit Project
The Tirzzit Project is a sediment-hosted stratiform Cu-Ag system, located 225km east of the city of Agadir, Morocco. The acquisition transaction of the Project was announced February 16, 2026 (see press release) from a wholly owned subsidiary of Aya Silver & Gold Inc. (TSX: AYA; OTCQX: AYASF) ("Aya"), the Company's 4.7% shareholder. The Tirzzit Project consists of two mining licenses covering a surface area of 16.5km2. Historic drilling results, as reported by Moroccan Government agency Bureau of Research and Mining Participations (BRPM) between 1972 and 1976 ("BRPM Reports"), include drill intersections of 3.16% Cu over 2.5m and 0.60% Cu over 11.4m. Presently the Company is reviewing the extensive BRPM Reports and past collected geophysical data for exploration planning slated to commence in 3Q2026. Talisman continues to process with Aya the formal transfer of the Tirzzit licences on the back of the sale agreement announced February 16, 2026.
Qualified Person
The information in this news release was compiled, reviewed, verified and approved by Mr. Michael Dufresne, M.Sc., P.Geol., P.Geo., a "Qualified Person" as defined in JORC 2012. Mr. Dufresne has 35 years' experience in exploration for metals and minerals of this mineralisation type, style and geological setting and is an independent qualified person as defined under the JORC code and the AIM Rules for Companies. Mr. Dufresne consents to the inclusion in this announcement of the technical matters based on his information in the form and context in which it appears
Technical Glossary
| Ag | Silver |
| Cu | Copper |
| "EOH" | End of Hole |
| Reverse Circulation ("RC") drilling | A fast, cost-effective method for collecting rock samples. Compressed air is pumped down the annulus (the space between inner and outer drilling tubes), while pulverised rock cuttings are forced back up through the inner tube to the surface. This "reverse" flow is what gives the method its name and ensures dry, uncontaminated samples suitable for analysis. |