CatalystWireBeta

Roskear Exploration Drilling Update

In brief · summary, not quotable

Cornish Metals plc has provided an update on its surface diamond drilling program at the South Crofty tin project, with drillhole SDD26_001A reaching its final depth of 1,199.1 metres and intersecting zones of veining with visible cassiterite and sulphide mineralisation. This drillhole has intersected mineralised structures west of current Mineral Resource estimate envelopes, indicating potential for resource growth, and the second drillhole, SDD26_002, will target the same structures approximately 100 metres further west. Assay results from SDD26_001A are expected in June 2026, and the programme aims to test extensions to known mineralisation and evaluate exploration targets.

Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your TIN notes

Cornish Metals plc (AIM: TIN) (“Cornish Metals” or the “Company”), a mineral exploration and development company focused on advancing its wholly owned and permitted South Crofty tin project (“South Crofty”) in Cornwall, United Kingdom, is pleased to provide an update on the ongoing surface diamond drilling programme in the Roskear area of the South Crofty mine.

The programme comprises approximately 2,400 metres of drilling designed to test extensions to known mineralisation and evaluate several priority exploration targets identified through historic drilling and recent geological interpretation.

Drillhole SDD26_001A has reached its final depth of 1,199.1 metres and has intersected zones of quartz-tourmaline veining with visible cassiterite, sulphide mineralisation, and alteration consistent with the target mineralised system.

Highlights

Drillhole SDD26_001A completed to a final depth of 1,199.1 metres

Multiple target mineralised structures intersected, including mineralised structures which host existing Mineral Resources

Mineralised structures intercepted west of current Mineral Resource estimate (“MRE”) envelopes, highlighting potential opportunities for resource growth

Second drillhole, SDD26_002, to commence targeting the same structures approximately 100 metres west of SDD26_001A

Samples currently being prepared for shipment to ALS Laboratories in Loughrea, Ireland, with assay results expected in June 2026

Don Turvey, CEO of Cornish Metals commented:

“The completion of drillhole SDD26_001A marks an important milestone in this targeted exploration drilling programme at South Crofty. The drillhole has successfully intersected multiple projected mineralised structures, including extensions to known resource areas beyond the current Mineral Resource estimate envelopes.

While assay results are still pending, the visual indications of mineralisation encountered are encouraging and support our geological interpretation of continued mineralisation to the west of the existing Mineral Resource areas. This programme is designed not only to assess opportunities for future Mineral Resource growth, but also to sterilise key infrastructure areas incorporated within the current mine design. We look forward to commencing the second hole in the programme and reporting assay results in due course.”

Figure 1: Quartz chlorite tourmaline veining with visible cassiterite (e.g. orange circle) associated with tourmaline, as logged by Cornish Metals geologists.

Figure 2: Quartz tourmaline vein hosted in granite with a band of cassiterite mineralization (e.g. indicated by the orange arrows), as logged by Cornish Metals geologists.

Figure 3: Chlorite-haematite-quartz structure with disseminated cassiterite mineralisation throughout (e.g. indicated by the orange arrow), as logged by Cornish Metals geologists.

Figure 4: Chlorite alteration with visible coarse cassiterite (e.g. orange circle), as logged by Cornish Metals geologists.

Programme Objectives

Test the western extensions of the Roskear B and Roskear South mineralised structures beyond the limits of the current Mineral Resource envelopes

Intersect projected structures within the Roskear Numbered Zone that are not currently included in the South Crofty MRE

Sterilise granite-hosted areas planned for critical infrastructure associated with the Preliminary Economic Assessment mine design, including planned ramp development in the Dolcoath and Roskear areas

Programme Update

The completion of drillhole SDD26_001A marks the halfway point of the two-hole, 2,400 metre drilling programme. SDD26_001A intersected along-strike interpreted projections of the Roskear 1 South, Roskear South, Roskear 6 North and Roskear 7 North structures, in addition to the target structures associated with Roskear B.

Roskear South and Roskear B contain Mineral Resources as reported in the Company’s 2023 MRE.

The Roskear 1 South, Roskear 6 North and Roskear 7 North lodes form part of a group of mineralised structures known as the Roskear Numbered Zone. These structures currently have limited supporting data from historic channel sampling and drillhole intercepts and are not presently included within the South Crofty MRE.

Following completion of SDD26_001A, the drill rig will be realigned to commence drillhole SDD26_002, which is designed to test the same structures approximately 100 metres west of SDD26_001A. Samples from SDD26_001A are currently being prepared for shipment to ALS Laboratories in Loughrea, Ireland, with assay results expected in June 2026.

Qualified Person

This news release has been reviewed and approved by Mr Stephen Holley, (BSc (Hons), ACSM, MSc, MSCM, CEng FIMMM), Technical Services Manager for Cornish Metals Inc, who is the designated QP for the Company.

Engage with us directly at our investor hub. Sign up at: https://investors.cornishmetals.com/link/rLzm0y

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note