PRODUCTION REPORT FOR THE THIRD QUARTER FY2024 ENDED 30 JUNE 2024

Tharisa, the mining, metals, and innovation company dual-listed on the Johannesburg and London stock exchanges, announces its production results for Q3 FY2024[1] and cash balance as at quarter end.

Quarter highlights

‒ Lost Time Injury Frequency Rate ('LTIFR') per 200 000 man hours worked of

‒ 0.03 at Tharisa Minerals

‒ 0.10 at Karo Platinum

‒ PGM production increased to 36.9 koz (Q2 FY2024: 35.3 koz)

‒ PGM basket price steady at US$1 391/oz (6E basis) (Q2 FY2024: US$1 343/oz)

‒ Chrome production increased to 410.2 kt (Q2 FY2024: 402.7 kt)

‒ Continued strong average metallurgical grade chrome concentrate prices, up 8% to US$309/t (Q2 FY2024: US$286/t)

‒ Group cash on hand of US$189.9 million (31 March 2024: US$184.6 million), and debt reduced to US$97.7 million (31 March 2024: US$114.0 million), resulting in an increased net cash position of US$92.2 million (31 March 2024: US$70.6 million)

‒ US$5 million share repurchase well on track with 1 600 058 shares repurchased to end June 2024

‒ Production guidance for FY2024 remains between 145 koz and 155 koz PGMs (6E basis) and 1.7 Mt to 1.8 Mt of chrome concentrates

Key Operating Numbers

Quarter ended 30 Jun 2024Quarter ended 31 Mar 2024Quarter on quarter movement %Quarter ended 30 Jun 2023Nine months ended 30 Jun 2024Nine months ended 30 Jun 2023
Reef minedkt1 261.91 035.021.9908.83 355.43 018.4
Reef milledkt1 396.11 378.51.31 302.24 198.94 099.5
6E PGMs produced (6E)koz36.935.34.537.0107.9114.0
Average PGM contained metal basket priceUS$/oz1 3911 3433.61 6951 3592 049
Chrome concentrates produced (excluding third party)kt410.2402.71.9378.81 275.71 166.7
Average metallurgical grade chrome concentrate contract price - 42% basisUS$/t CIF China3092868.0290295258

Phoevos Pouroulis, CEO of Tharisa, commented:

"This third quarter marks nine months since we last recorded a lost time injury, something that we can all be proud of, as our systems and continuous focus on safe production and zero harm keep our people safe.

Operationally we delivered as planned, with improved mining and plant recoveries resulting in overall PGM and chrome concentrate production increases. The focus on sustainable mining and the structural improvements achieved in this year to date positions us for a strong last quarter, with further improvements in the mining performance, providing the sustainable foundation for the medium to long term plans for the mine.

Positive progress has been made with our plans for transitioning to underground development in the west pit in parallel with the continued optimisation of open-pit mining.

The Karo Platinum project is progressing safely and well, with construction aligned with capital availability and the various funding solutions progressing according to plan.

Our vision for Tharisa remains firmly intact, with sustainable mining complemented by maximising the output from our ore bodies, coupled through our various beneficiation initiatives for both chrome and PGMs together with the continued progress we are making in the renewable energy field with Redox One, and the 40MW solar project."

Health & Safety

‒ LTIFR per 200 000 man hours worked of

‒ 0.03 at Tharisa Minerals with no LTIs recorded to date in the financial year under review

‒ 0.10 at Karo Platinum with no accidents on site in the financial year under review

Market Update

‒ PGM prices for the quarter were at slightly higher levels than in the previous quarter supporting the market view that the 'bottom of the market' has passed. Prices, however, continue to be influenced and rangebound by continued inventory de-stocking, the pace of which is dependent on economic activity, which has not reached previous heights yet. The narrative for PGM's is changing with the realisation that the internal combustion engine will remain around much longer, with hybrid drivetrains the natural progression in the longer term.

‒ Chrome prices have continued to trend upwards on strong fundamental demand for product coupled with port inventories at the lower end, supporting prices. Logistics remain complex but manageable.

Operational Update

‒ Total reef mined up 21.9% as the benefits of increased stripping provides the necessary in-pit flexibility, with tonnage at 1 261.9 kt (Q2 FY2024: 1 035.0 kt)

‒ Another strong milling performance at 1 396.1 kt (Q2 FY2024: 1 378.5kt) with throughput supplemented by strategic ROM purchases

‒ Quarterly PGM production at 36.9 koz (Q2 FY2024: 35.3 koz)

‒ Rougher feed grade of 1.57 g/t (Q2 FY2024: 1.66 g/t)

‒ Recovery of 68.5% (Q2 FY2024: 62.9%)

‒ Quarterly chrome production of 410.2 kt (Q2 FY2024: 402.7 kt)

‒ Grade of 18.0% Cr2O3 (Q2 FY2024: 18.1%)

‒ Recovery at 67.3% (Q2 FY2024: 66.4%)

Cash Balance and Debt Position

‒ Group cash on hand of US$189.9 million (31 March 2024: US$184.6 million), and debt reduced to US$97.7 million (31 March 2024: US$114.0 million), resulting in an increased net cash position of US$92.2 million (31 March 2024: US$70.6 million).

Guidance

Production guidance for FY2024 remains between 145 koz and 155 koz PGMs (6E basis) and 1.7 Mt to 1.8 Mt of chrome concentrates.

Production Numbers

Quarter ended 30 Jun 2024Quarter ended 31 Mar 2024Quarter on quarter movement %Quarter ended 30 Jun 2023Nine months ended 30 Jun 2024Nine months ended 30 Jun 2023
Reef minedkt1 261.91 035.021.9908.83 355.43 018.4
Stripping ratiom 3 : m 312.714.0(9.3)14.212.812.3
Reef milledkt1 396.11 378.51.31 302.24 198.94 099.5
PGM flotation feedkt1 064.91 055.60.9996.53 168.53 151.4
PGM rougher feed gradeg/t1.571.66(5.4)1.671.611.66
PGM recovery%68.562.98.969.065.867.6
6E PGMs producedkoz36.935.34.537.0107.9114.0
Platinumkoz19.419.21.020.959.163.8
Palladiumkoz5.86.4(9.4)6.617.420.1
Rhodiumkoz3.33.23.13.49.810.6
Average PGM contained metal basket priceUS$/oz1 3911 3433.61 6951 3592 049
PlatinumUS$/oz9819107.81 034935994
PalladiumUS$/oz973978(0.5)1 4411 0131 664
RhodiumUS$/oz4 6384 3995.46 9594 41710 467
Cr 2 O 3 ROM grade%18.018.1(0.6)17.818.417.7
Chrome recovery%67.366.41.467.968.166.7
Chrome yield%29.429.20.629.130.428.5
Chrome concentrates produced (excluding third party)kt410.2402.71.9378.81 275.71 166.7
Metallurgical gradekt336.0339.5(1.0)306.01 065.31 018.5
Specialty gradeskt74.263.217.472.8210.4148.2
Third party chrome productionkt49.645.010.256.2140.1143.0
Average metallurgical grade chrome concentrate contract price - 42% basisUS$/t CIF China3092868.0290295258
Average exchange rateZAR:US$18.618.9(1.6)18.718.718.0

Paphos, Cyprus

JSE Sponsor

Investec Bank Limited

Connect with us on LinkedIn to get further news and updates about our business.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note