Monte Muambe Operational Update
Altona Rare Earths PLC has completed an expanded fluorspar-gallium resource drilling program at its Monte Muambe project in Mozambique, drilling 3,419 meters across 74 holes, exceeding the initial plan by 70% and encountering visible fluorspar mineralization. The company has dispatched 3,163 geochemical and metallurgical samples for laboratory analysis, with results expected in early 2026 to inform an updated Mineral Resource Estimate. Engagement with the USTDA for rare earths Prefeasibility Study funding has resumed and is progressing, with a decision anticipated in early 2026. Additionally, Altona received a notice for the exercise of 5 million warrants at 1 pence per share, resulting in the issuance of new ordinary shares and an enlarged share capital of 296,864,306.
Select text to share a quote on X · sign in to keep highlights & notes in your TERA notes
Altona Rare Earths PLC (LSE: REE), a resource exploration and development company focused on critical raw materials in Africa, is pleased to provide an operational update on the Monte Muambe fluorspar, gallium and rare earths project in Mozambique.
Highlights
- Expanded fluorspar-gallium resource drilling program (total 74 holes, 3,419m) completed
- 3,163 geochemical and metallurgical samples dispatched to laboratory
- Competent person site visit successfully completed
- USTDA engagement for rare earths PFS funding has resumed and is progressing
- £50,000 warrants exercise notice received
Expanded drilling program completed
The Company is pleased to announce that it has completed 691m of diamond drilling (15 holes) and 2,728m of reverse circulation drilling (59 holes), for a total of 3,419m (74 holes). Most holes have encountered visible fluorspar mineralization.
The meterage drilled exceeds by 70% the originally planned 2,000m. The drilling program was expanded due to the encouraging results of the initial holes and to the discovery of new targets, announced on 28 October 2025. This expansion is expected to result in additional fluorspar Mineral Resource Estimate ("MRE") tonnage.
Samples dispatched to South African laboratories, data collection completed
3,160 geochemical samples and 3 representative metallurgical samples of fluorspar-gallium ore have been dispatched to assay and metallurgical testing laboratories in South Africa. Assay results are expected in early 2026 and once received they will be rapidly used to prepare and publish the project's MRE.
Data collection on site was completed, including logging, density measurements, and Real Time Kinetic ("RTK") topography surveying of the different fluorspar areas. The RTK survey will allow the Company to prepare reliable, high-resolution digital terrain models which are necessary for MRE calculations.
As part of the requirements for the planned fluorspar and gallium JORC MRE, competent person Joshua Hattingh carried out the site visit from 18 to 21 November 2025. The site visit enabled Mr Hattingh to verify both historical and new drilling collars, and the implementation of drilling, logging, sampling and surveying standard operating procedures. Mr Hattingh also visited the sample assay laboratory in South Africa.
USTDA engagement for the Monte Muambe rare earths project continues to progress
The Company is pleased to report that engagements with the USTDA with respect to possible funding of the rare earths Prefeasibility Study have resumed after the end of the US Government shutdown and are progressing rapidly, with an expected decision in early 2026.
Business development activities
In line with the diversification strategy announced in 2024, the Company continues to assess the possible low-cost acquisition of mineral assets having potential for low capex, rapid development, and cash flow generation, in order to create a long-term pipeline of projects. It is expected that at least one such project will be acquired in the first half of 2026.
Exercise of Warrants
The Company is pleased to announce that it has received a Notice of Exercise from an existing warrant holder in respect of 5 million warrants over shares at a price of 1 pence per ordinary share.
Admission and Total Voting Rights
Application is being made for the new ordinary shares to be admitted to trading on the Main Market of the London Stock Exchange which is expected to be on or around 19 December 2025. Following this issue of 5,000,000 shares, which will rank pari passu with the Company's existing ordinary shares, the Company's enlarged share capital and total voting rights in the Company will comprise 296,864,306. The Company has no shares held in Treasury. This figure of 296,864,306 ordinary shares may be used by shareholders in the Company as the denominator for the calculations by which they will determine if they are required to notify their interest in, or a change in their interest in, the share capital of the Company under the FCA's Disclosure Guidance and Transparency Rules.
Cédric Simonet, CEO of Altona, commented:
"I am pleased with the completion of a very busy 2025 drilling campaign, with positive results on the ground justifying a 70% increase of the drilled meterage, underpinning the potential for a larger MRE than originally anticipated.
I look forward to the publication of the fluorspar-gallium MRE in early 2026, as soon as the assay results have been returned by the lab, as well as to progress on the USTDA front for the rare earths."
To subscribe for RNS alerts, please visit: https://investors.altonare.com/
Altona Rare Earths Plc
Cédric Simonet, CEO +44 (0) 7778 866 108
Louise Adrian, CFO +44 (0) 7721 492 922
Strand Hanson Limited (Financial Adviser) +44 (0) 20 7409 3494
Christopher Raggett
Imogen Ellis
Zeus Capital (Corporate Broker) +44 (0) 20 3829 5000
Simon Johnson
James Hornigold
About Altona Rare Earths Plc
The multi-commodity Monte Muambe Project in northwest Mozambique is a highly prospective tenement hosting rare earths, fluorspar, and gallium mineralisation. Since acquiring the project in June 2021, Altona has drilled over 7,800 metres, delivering a maiden JORC Mineral Resource Estimate of 13.6Mt at 2.42% TREO, secured a 25-year mining licence (granted December 2024), and published a Competent Person Report and scoping study for the rare earths component of the project (October 2023). The Company is actively engaging with the US Government, through USTDA, as a possible strategic partner to advance the rare earths project through the prefeasibility stage.
In parallel, Altona is progressing plans to fast-track the development of high-grade fluorspar veins identified along the western and southern margins of Monte Muambe, with a targeted production of 50,000 tonnes per annum of acid-grade fluorspar over a minimum 12-year mine life. Acid-grade fluorspar is a key input in a wide range of applications, including hydrofluoric acid, lithium battery electrolyte production, and nuclear fuel refining, placing Altona in a strong position to supply this critical material.
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.