CatalystWireBeta

Half-year Results

In brief · summary, not quotable

Optimised Pre-Feasibility Study confirms Kasiya as major rutile-graphite project with US$2.3bn NPV and 27% IRR.

  • NPV 8 (real, pre-tax) US$2,322m (prior US$2,419m)
  • IRR (pre-tax) 27% (prior 32%)
  • Capex to First Production (Stage 1) US$665m (prior US$597m)
  • Average Annual Rutile Produced 222 ktpa (prior 222 ktpa)
  • Average Annual Graphite Produced 233 ktpa (prior 244 ktpa)
  • Cash at bank A$34 million
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your SVML notes

CORPORATE DIRECTORY

Directors Mr Benjamin Stoikovich Chairman Mr Frank Eagar Managing Director and CEO Mr Ian Middlemas Non-Executive Director Dr Julian Stephens Non-Executive Director Mr Mark Pearce Non-Executive Director Mr Nigel Jones Non-Executive Director CFO and Company Secretary Mr Dylan Browne London Office Unit 3C, 38 Jermyn Street, London SW1Y 6DN, United Kingdom Telephone: +44 207 478 3900 Cape Town Office Ground Floor, Block C, The Terraces, Steenberg Office Park Cape Town, South Africa Telephone: +27 21 065 1890 Operations Office Area 4 Lilongwe Malawi Registered and Principal Office Level 9, 28 The Esplanade Perth WA 6000 Telephone: +61 8 9322 6322 Stock Exchange Listings Australia Australian Securities Exchange ASX Code : SVM - Ordinary Shares United Kingdom London Stock Exchange (AIM) AIM Code: SVML - Depository Interests Quotations United States OTCQX Best Market OTCQX code: SVMLFNominated Advisor & Broker SP Angel Corporate Finance LLP Prince Frederick House 35-39 Maddox Street London W1S 2PP, United Kingdom Brokers Stifel Nicolaus Europe Limited 150 Cheapside London EC2V 6ET United Kingdom T: +44 20 7710 7600 Berenberg, Gossler & Co, KG, London Branch 60 Threadneedle Street London EC2R 8HP United Kingdom T: +44 20 3753 3132 Share Register Australia Computershare Investor Services Pty Ltd Level 17 221 St Georges Terrace Perth WA 6000 Telephone: 1300 850 505 International: +61 8 9323 2000 Facsimile: +61 8 9323 2033 United Kingdom Computershare Investor Services PLC The Pavilions, Bridgewater Road, Bristol BS99 6ZZ Telephone: +44 370 702 0000 Solicitors Thomson Geer Simmons & Simmons Auditor Ernst & Young - Perth Bankers Australia - National Australia Bank Limited Malawi - Standard Bank

CONTENTS

Directors' Report

Consolidated Statement of Profit or Loss and Other Comprehensive Income

Consolidated Statement of Financial Position

Consolidated Statement of Changes in Equity

Consolidated Statement of Cash Flows

Notes to the Financial Statements

Directors' Declaration

Auditor's Independence Declaration

Independent Auditor's Review Report

DIRECTORS' REPORT

The Directors of Sovereign Metals Limited present their report on Sovereign Metals Limited (Sovereign or the Company or Parent) and the entities it controlled at the end of, or during, the half year ended 31 December 2024 (Consolidated Entity or Group).

REVIEW AND RESULTS OF OPERATIONS

KASIYA RUTILE-GRAPHITE PROJECT

Sovereign is focused on the development of its Kasiya rutile-graphite project (Kasiya or the Project) in Malawi. The recently completed Optimised Pre-Feasibility Study (OPFS) confirmed Kasiya as a potentially major critical minerals project delivering industry-leading economic returns and sustainability metrics.

The Company's objective is to develop a large-scale, long life rutile-graphite operation, focusing on developing an environmentally and socially responsible, sustainable operation.

Figure 1: Kasiya Regional Project Location

HIGHLIGHTS DURING AND SUBSEQUENT TO PERIOD END

Optimised PFS Results Reaffirm Kasiya's Globally Strategic Significance

  • In January 2025, the OPFS was completed with oversight from Sovereign-Rio Tinto Technical Committee
  • Results of the OPFS reaffirm Kasiya's potential to become the largest and lowest-cost producer of natural rutile and natural flake graphite while generating exceptional economics
  • Various optimisations have led to superior project delivery, operational flexibility, environmental and social outcomes compared to the 2023 Prefeasibility Study (PFS)

Pilot Phase Advanced to Rehabilitation Stage following Mining Trials and Backfilling

  • In December 2024, material mined and stockpiled during the Pilot Mining and Land Rehabilitation (Pilot Phase) was placed back in the test pit, filling it to its original ground level
  • On-site soil remediation and land rehabilitation activities are underway, testing Sovereign's proposed rehabilitation approach and demonstrating how mined land can support sustainable farming post-closure

Rio Tinto Invests Additional A$19m Increasing Shareholding to 19.9%

  • In July 2024, Rio Tinto invested a further A$18.5 million via the exercise of options to increase its shareholding in Sovereign. To date Rio Tinto has invested A$60 million for 19.9% of Sovereign

Positive Test Results for Use of Kasiya Graphite

  • Very high quality Coated Spherical Purified Graphite (CSPG) anode material produced from Kasiya graphite concentrate with performance characteristics comparable to highest quality natural graphite battery material produced by dominant Chinese anode manufacturers
  • In November 2024, Sovereign announced that preliminary tests confirmed that graphite concentrate produced from Kasiya exhibits prerequisite characteristics for selling graphite to the refractory materials sector
  • In February 2025, further test work confirmed Kasiya's graphite also has the key characteristics required for use in expandable (fire retardant) and expanded (gaskets, seals, and brake lining) applications

Infill Drilling Program Complete

  • In October 2024, Sovereign announced the completion of an infill drilling program designed to upgrade Kasiya's Mineral Resource Estimate (MRE) and to facilitate conversion of Ore Reserves from Probable to Proven category, with the upgrade due in the coming months

Next Steps

  • Sovereign will continue to advance the Definitive Feasibility Study (DFS), provide updates on the rehabilitation component of the Pilot Phase, publish an upgrade to the MRE, continue with further graphite testwork to support potential offtake discussions and further its community and social development programs in Malawi

Figure 2: Pilot Phase test pit during mining trials (left) and subsequently backfilled and rehabilitated (right)

Optimised PFS Results Reaffirm Kasiya's Globally Strategic Significance

Subsequent to the half year, the Company announced the results of an OPFS for Kasiya which was undertaken following a strategic investment by Rio Tinto Mining and Exploration Limited (Rio Tinto) in 2023. Under the Investment Agreement, a joint Technical Committee was established to oversee the development of Kasiya; the OPFS was conducted with oversight from the Sovereign-Rio Tinto Technical Committee.

The OPFS proposes a large-scale, long-life operation to deliver substantial volumes of natural rutile and graphite while generating significant returns. Table 1 below summarises the key findings from the OPFS and includes a comparison to the PFS results released 16 months ago, in September 2023. It is important to note that the results for the 2023 PFS in Table 1 have not been updated or adjusted for inflation since their release.

TABLE 1: KEY OPFS METRICS

UnitsOPFS Results Jan 252023 PFS Sep 23
Production
Initial Mine LifeYears2525
Plant Throughput (Stage 1: Years 1-4)Mtpa1212
Plant Throughput (Stage 2: Years 5-25)Mtpa2424
Average Annual Rutile Produced (95%+TiO 2)ktpa222222
Annual Average Graphite Produced (96% TGC)*ktpa233244
Operating and Capital Expenditure
Capex to First Production (Stage 1)US$M665597
Total LOM Development CapexUS$M1,1271,250
Total LOM Sustaining CapexUS$M397470
Operating Costs (FOB Nacala)US$/t product423404
Financial Performance
Total Revenue*US$M16,36716,121
Annual Revenue (Average LOM)US$M640645
Annual EBITDA (Average LOM)US$M409415
NPV 8 (real, pre-tax)US$M2,3222,419
IRR (pre-tax)%27%32%
Revenue to Cost Ratiox2.82.8

*Annual average graphite produced includes 292kt of graphite processed and sold in two years post cessation of active ore mining. Average graphite produced during the 25-year initial mine life only is 240ktpa; total revenue during the same period is US$15,990 million. All rutile is produced and sold during the 25-year initial mine life. Note: All cashflows and costs are presented in US$ real January 2025 terms unless otherwise stated. Operating costs exclude mineral royalties and community development support costs.

Summary of Optimisations

The OPFS optimises seven key areas compared to the 2023 PFS, as summarised below.

Mining Method

The PFS proposed a 25-year initial LOM based on a hydraulic mining process where slurry material would be screened and pumped overland to the processing plants.

Operating Model

The 2023 PFS envisaged mining would take place on a contractor basis.

During the OPFS, Sovereign undertook a trade-off analysis between the following operating options:

  • Fully owner-operated mine with draglines and trucks purchased by the owner
  • Owner-operated mine with draglines and trucks leased by the owner
  • Mining contractor operation using excavators and trucks

Plant Configuration

Plant Location

Tailings Management

Water Management

The PFS proposed that the primary water supply for the Kasiya mining complex would be created by building a water storage dam and collecting run-off water from the greater catchment area. Following the introduction of dry mining and mud farming, the size of the water storage dam proposed in the PFS has been significantly reduced, with less process water required and more process water recovered.

The OPFS mining trials and material deposition tests indicated a water demand of 10.2 Mm³ per annum, almost a 40% decrease in water requirement from the PFS (16.7 Mm³). The effect on the water storage dam wall could be a reduction in volume from 0.79 Mm³ to 0.57 Mm³ and a reduction in dam wall height from 20 metres to 17 metres.

Power

The 2023 PFS envisaged a hybrid hydro-generated grid power plus solar power system solution.

Pilot Phase Advanced to Rehabilitation Stage Following Mining Trials and Backfilling

In December 2024, the Company announced that the test pit mined during the Pilot Phase at the Kasiya Project had been successfully backfilled. This allowed Sovereign to commence on-site soil remediation and land rehabilitation activities, testing our proposed rehabilitation approach and demonstrating that the mined land can support sustainable farming post-closure.

During the Pilot Phase mining trials, 170,000m3 was mined using a conventional excavator fleet. The fleet was used to place mined material back into the pit, filling the pit to the original ground level in less than two months and ahead of schedule.

In March 2025, the Company announced the success of the rehabilitation program with landowners given immediate access to land to start maize crop farming without missing a planting season.

Positive Test Results for Use of Kasiya Graphite in Refractory and Expandable Markets

The Company has announced that downstream testwork targeting the traditional graphite market, conducted at leading independent consultancies ProGraphite GmbH (ProGraphite) and Dorfner Anzaplan (DorfnerA) in Germany, have delivered very positive test results, which will be used for customer engagement and potential offtake discussions.

Preliminary tests confirmed that graphite concentrate produced from Kasiya in Malawi exhibits prerequisite characteristics required for graphite sales into the refractory materials sector and for use in expandable (fire retardant) and expanded (gaskets, seals, and brake lining) applications.

Traditional demand for natural graphite is primarily tied to the steel industry where it is used as a component in bricks that line both blast and electric arc furnaces ("refractories") and as a liner for ladles and crucibles. It is used in brake linings, gaskets and clutch materials in the automotive industry. Graphite has many other industrial uses in lubricants, carbon brushes for electric motors, fire retardants, and insulation and reinforcement products.

Graphite's key properties for use in refractory applications are its resistance to oxidation, chemical inertness and good thermal conductivity.

A key use for expandable graphite is as a flame retardant. Growth for expandable graphite flame retardants, is driven by concerns over halogen-based flame retardants, which include brominated and chlorinated flame retardants. Many of these chemicals are now recognised as global contaminants and are associated with adverse health effects in animals and humans, including endocrine and thyroid disruption, immunotoxicity, reproductive toxicity, and cancer (National Institute of Health).

Expanded graphite is used in gaskets, seals, brake linings, bi-polar plates for fuel cells, and thermal management in electronic devices, where the inherent properties of graphite are combined with the flexibility of expanded graphite.

Figure 3: Natural graphite market per application (Benchmark Minerals Intelligence, 2025)

Infill Drilling Program Complete

In October 2024, the Company announced the completion of an infill drilling program at Kasiya to support an upgrade of the MRE.

Aircore drilling, supported by hand auger, push tube and diamond core drilling, was completed in the southern part of Kasiya. The drilling was focused on the designated pits proposed to provide ore feed in the first eight years of the Project's production schedule. Ore Reserves in these areas are expected to convert from the Probable to Proven category with an upgrade of the current MRE from Indicated to the Measured category under the JORC (2012) Code.

Offsite laboratories in South Africa and Australia will assay all samples for rutile and graphite. The drilling program's results and subsequent Resource upgrade are expected in early 2025.

Corporate Update

Sovereign remains in a strong financial position with cash at bank of approximately A$34 million and no debt.

Next Steps

The Company plans to update the market on the following progress in the coming months:

  • Planned MRE upgrade
  • Further graphite test work results as the Company continues to advance the qualification of its graphite product for the lithium-ion battery and traditional graphite sectors
  • Progress in discussions with future potential end-users of rutile and graphite
  • Updates on community and social development programs
  • Further rehabilitation aspects of the Pilot Phase
  • Progress of the DFS, which is targeted for completion in Q4, 2025

DIRECTORS

The names of Directors in office at any time during the financial period or since the end of the financial period are:

Mr Benjamin Stoikovich Chairman

Mr Frank Eagar Managing Director and CEO

Mr Ian Middlemas Non-Executive Director

Dr Julian Stephens Non-Executive Director

Mr Mark Pearce Non-Executive Director

Mr Nigel Jones Non-Executive Director

All Directors were in office from 1 July 2024 until the date of this report, unless otherwise noted.

OPERATING RESULTS

The net operating loss after tax for the half year ended 31 December 2024 was $19,546,116 (2023: $6,976,503) which is attributable to:

  • Interest income of $1,025,751 (2023: $938,402) earned on cash term deposits held by the Group;
  • exploration and evaluation expenditure of $16,495,513 (2023: $5,027,397) in relation to the Kasiya Project. This is attributable to the Group's accounting policy of expensing exploration and evaluation expenditure incurred by the Group subsequent to acquisition of the rights to explore and up to the completion of feasibility studies; and
  • non-cash share based payment expenses of $1,904,852 (2023: $1,089,974) relating to performance rights. The fair value of incentive options and rights is measured at grant date and recognised over the period during which the performance rights holders become unconditionally entitled to the incentive securities.

FINANCIAL POSITION

At 31 December 2024, the Company had cash and cash equivalents of $33,531,689 (30 June 2024: $31,564,130) and no debt (30 June 2024: nil). The Company had net assets of $35,927,994 (30 June 2024: $34,358,774), an increase of $1,569,220 or approximately 4% compared with the prior period. This is largely attributable to the increase in cash reserves following the investment made by Rio Tinto in the period offset by exploration and evaluation spend on the project to complete the Pilot Phase and OPFS.

SIGNIFICANT POST BALANCE DATE EVENTS

On 22 January 2025, the Company announced the results of an OPFS for Kasiya which reaffirm Kasiya's potential to become the largest and lowest-cost producer of natural rutile and natural flake graphite while generating exceptional economics.

Other than the above, there are no matters or circumstances which have arisen since 31 December 2024 that have significantly affected or may significantly affect:

  • the operations, in periods subsequent to 31 December 2024, of the Group;
  • the results of those operations, in periods subsequent to 31 December 2024, of the Group; or
  • the state of affairs, in periods subsequent to 31 December 2024, of the Group.

AUDITOR'S INDEPENDENCE DECLARATION

Section 307C of the Corporations Act 2001 requires our auditors, Ernst & Young, to provide the directors of Sovereign Metals Limited with an Independence Declaration in relation to the review of the half year financial report. This Independence Declaration is on page 17 and forms part of this Directors' Report.

For and on behalf of the Directors

Frank Eagar

Managing Director and CEO

CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME

FOR THE HALF YEAR ENDED 31 DECEMBER 2024

NotesHalf Year Ended 31 December 2024 $Half Year Ended 31 December 2023 $
Interest income1,025,751938,402
Exploration and evaluation expenses(16,495,513)(5,027,397)
Corporate and administrative expenses(779,930)(572,119)
Business development expenses(1,004,695)(996,548)
Share based payment expense9 (a)(1,904,852)(1,089,974)
Other expenses3(386,877)(173,386)
Demerger expenses-(55,481)
Loss before income tax(19,546,116)(6,976,503)
Income tax expense--
Loss for the period(19,546,116)(6,976,503)

Other comprehensive income, net of income tax:

Items that may be reclassified subsequently to profit or loss

NotesHalf Year Ended 31 December 2024 $Half Year Ended 31 December 2023 $
Exchange differences on foreign entities80,6243,530
Other comprehensive income for the period, net of income tax80,6243,530
Total comprehensive loss for the period(19,465,492)(6,972,973)
Loss attributable to members of Sovereign Metals Limited(19,465,492)(6,972,973)
Total comprehensive loss attributable to members of Sovereign Metals Limited(19,465,492)(6,972,973)
Basic and diluted loss per share from continuing operations (cents per share)(3.3)(1.1)
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2024
Notes31 December 2024 $30 June 2024 $
ASSETS
Current Assets
Cash and cash equivalents33,531,68931,564,130
Other receivables4506,258315,597
Other financial assets175,000560,000
Total Current Assets34,212,94732,439,727
Non-current Assets
Property, plant and equipment52,009,7001,149,771
Exploration and evaluation assets65,086,1295,086,129
Total Non-current Assets7,095,8296,235,900
TOTAL ASSETS41,308,77638,675,627
LIABILITIES
Current Liabilities
Trade and other payables5,184,6424,138,353
Provisions86,84956,782
Other financial liabilities7(a)41,37835,288
Total Current Liabilities5,312,8694,230,423
Non-Current Liabilities
Other financial liabilities7(b)67,91386,430
Total Non-Current Liabilities67,91386,430
TOTAL LIABILITIES5,380,7824,316,853
NET ASSETS35,927,99434,358,774
EQUITY
Issued capital8136,965,491117,835,631
Reserves9(1,374,794)(3,360,270)
Accumulated losses(99,662,703)(80,116,587)
TOTAL EQUITY35,927,99434,358,774
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF YEAR ENDED 31 DECEMBER 2024
Issued Capital $Share Based Payment Reserve $Demerger Reserve $Foreign Currency Translation Reserve $Accumulated Losses $Total Equity $
Balance at 1 July 2024117,835,6313,605,751(7,336,678)370,657(80,116,587)34,358,774
Net loss for the period----(19,546,116)(19,546,116)
Other comprehensive income---80,624-80,624
Total comprehensive income/(loss) for the period---80,624(19,546,116)(19,465,492)
Transactions with owners, recorded directly in equity
Issue of placement shares19,174,395----19,174,395
Cancelation of unvested performance rights-(22,754)---(22,754)
Share based payment expense-1,927,606---1,927,606
Share issue costs(44,535)----(44,535)
Balance at 31 December 2024136,965,4915,510,603(7,336,678)451,281(99,662,703)35,927,994
Balance at 1 July 202374,508,4884,155,950(7,336,678)(139,498)(61,515,693)9,672,569
Net loss for the period----(6,976,503)(6,976,503)
Other comprehensive income---3,530-3,530
Total comprehensive income/(loss) for the period---3,530(6,976,503)(6,972,973)
Transactions with owners, recorded directly in equity
Issue of placement shares40,598,258----40,598,258
Transfer from SBP reserve upon conversion of performance rights2,853,400(2,853,400)----
Share based payment expense-1,089,974---1,089,974
Share issue costs(124,515)----(124,515)
Balance at 31 December 2023117,835,6312,392,524(7,336,678)(135,968)(68,492,196)44,263,313
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF YEAR ENDED 31 DECEMBER 2024
Half Year Ended 31 December 2024 $Half Year Ended 31 December 2023 $
Cash flows from operating activities
Payments to suppliers and employees - exploration and evaluation(15,479,030)(5,433,663)
Payments to suppliers and employees - other(1,764,767)(1,616,960)
Interest received1,031,209744,942
Net cash used in operating activities(16,212,588)(6,305,681)
Cash flows from investing activities
Payments for purchase of plant and equipment(916,061)(205,902)
Repayment of loan receivable from NGX Limited-34,434
Net cash used in investing activities(916,061)(171,468)
Cash flows from financing activities
Proceeds from issue of shares19,174,39540,598,258
Payments for share issue costs(44,535)(248,778)
Payments for finance lease(31,777)-
Net cash from financing activities19,098,08340,349,480
Net increase in cash and cash equivalents1,969,43433,872,331
Net foreign exchange differences(1,875)-
Cash and cash equivalents at the beginning of the period31,564,1305,564,376
Cash and cash equivalents at the end of the period33,531,68939,436,707

NOTES TO THE FINANCIAL STATEMENTS

FOR THE HALF YEAR ENDED 31 DECEMBER 2024

MATERIAL ACCOUNTING POLICY INFORMATION

Sovereign Metals Limited (the "Company") is a for profit company limited by shares and incorporated in Australia, whose shares are publicly traded on the Australian Securities Exchange, the AIM Market of the London Stock Exchange and a Quotation on OTCQX in the U.S. The consolidated interim financial statements of the Company as at and for the period from 1 July 2024 to 31 December 2024 comprise the Company and its subsidiaries (together referred to as the "Group"). The nature of the operations and principal activities of the Group are as described in the Directors' Report.

This interim financial report does not include all the notes of the type normally included in an annual financial report. Accordingly, this report is to be read in conjunction with the audited annual report of Sovereign for the year ended 30 June 2024 (where comparative amounts have been extracted from) and any public announcements made by the Group during the interim reporting period in accordance with the continuous disclosure requirements of the Corporations Act 2001.

Basis of Preparation of Half Year Financial Report

The consolidated financial statements have been prepared on the basis of historical cost, except for the revaluation of certain financial instruments. Cost is based on the fair values of the consideration given in exchange for assets. All amounts are presented in Australian dollars, unless otherwise stated. There have been no changes in the critical accounting judgements or key sources of estimation since 30 June 2024.

Statement of Compliance

The consolidated interim financial report complies with Australian Accounting Standards, including AASB 134 which ensures compliance with International Financial Reporting Standard ("IFRS") IAS 34 "Interim Financial Reporting" as issued by the International Accounting Standards Board. The accounting policies adopted in the preparation of the half-year financial report are consistent with those applied in the preparation of the Group's annual financial report for the year ended 30 June 2024, except for new standards, amendments to standards and interpretations effective 1 July 2024. In the current half year, the Group has adopted all of the new and revised Standards and Interpretations issued by the AASB that are relevant to its operations and effective for the current annual reporting period. The adoption resulted in no material impact.

Issued standards and interpretations not early adopted

Australian Accounting Standards and Interpretations that have recently been issued or amended but are not yet effective have not been adopted by the Group for the reporting period ended 31 December 2024. Those which may be relevant to the Group are set out in the table below. The impact of these standards are still being assessed.

Standard/InterpretationApplication Date of StandardApplication Date for Group
AASB 2014-10 Amendments to Australian Accounting Standards - Sale or Contribution of Assets between an Investor and its Associate or Joint Venture1 January 20251 July 2025
AASB 18 Presentation and Disclosure in Financial Statements1 January 20271 July 2027

SEGMENT INFORMATION

AASB 8 requires operating segments to be identified on the basis of internal reports about components of the Consolidated Entity that are regularly reviewed by the chief operating decision maker in order to allocate resources to the segment and to assess its performance. The Consolidated Entity has one operating segment, being exploration in Malawi.

OTHER EXPENSES

31 December 2024 $31 December 2023 $
Foreign exchange (loss)/gain(1,877)1,614
Fair value movements in other financial assets(385,000)(175,000)
(386,877)(173,386)
4. CURRENT ASSETS - OTHER RECEIVABLES
31 December 2024 $30 June 2024 $
Accrued interest140,454145,913
GST receivable95,66481,051
Prepayments203,55952,655
Other66,58135,978
506,258315,597
5. NON-CURRENT ASSETS - PROPERTY, PLANT AND EQUIPMENT
Office Furniture and Equipment $Computer Equipment $Plant & Equipment $Right of use $Assets under construction $Total $
Carrying amount at 1 July 2024152,16368,566496,953116,447315,6421,149,771
Additions31,75830,516768,298-73,062903,634
Depreciation charge(15,546)(17,761)(64,801)(21,663)-(119,771)
Foreign exchange differences10,2173,55733,6044,25724,43176,066
Carrying amount at 31 December 2024178,59284,8781,234,05499,041413,1352,009,700
At cost227,879153,2921,803,664134,091388,7042,707,630
Accumulated depreciation, amortisation and impairment(49,287)(68,414)(569,610)(35,050)24,431(697,930)
6. EXPLORATION AND EVALUATION ASSETS
31 December 2024 $
(a) Movement in Exploration and Evaluation Assets
Kasiya Rutile-Graphite Project:
Carrying amount as at 1 July 20245,086,129
Carrying amount at 31 December 2024 (i)5,086,129

Note:

  • The ultimate recoupment of costs carried forward for exploration and evaluation is dependent on the successful development and commercial exploitation or sale of the respective areas of interest.
  • OTHER FINANCIAL LIABILITIES
31 December 2024 $30 June 2024 $
(a) Current liabilities
Lease Liability (i)41,37835,288
(b) Non-Current liabilities
Lease Liability (i)67,91386,430

Note:

  • The Company has a lease agreement for the rental of a property. Refer to Note 5 for the carrying amount of the right of use asset relating to the lease. The following are amounts recognised in the Statement of Profit and Loss: (i) amortisation expense of right of use asset $21,663 (30 June 2024: $17,454); (ii) interest expense on lease liabilities of $14,311 (30 June 2024: $12,961); and (iii) rent expense of $5,660 (30 June 2024: $7,922).
  • CONTRIBUTED EQUITY
31 December 2024 $30 June 2024 $
(a) Issued and Paid Up Capital
599,879,879 (30 June 2024: 563,003,401) fully paid ordinary shares (Note 8 (b))136,965,491117,835,631
(b) Movements in Ordinary Share Capital were as follows:
DateDetailsNumber of Shares$
1 Jul 24Opening balance563,003,401117,835,631
4 Jul 24Issue of ordinary shares on exercise of Rio Tinto Options34,549,59818,484,035
13 Sep 24Issue of ordinary shares to Rio Tinto1,290,392690,360
13 Sep 24Issue of advisory fee shares1,036,488-
31 Dec 24Share issue costs-(44,535)
31 Dec 24Closing balance599,879,879136,965,491
9. RESERVES
31 December 2024 $30 June 2024 $
Share-based Payments Reserve (Note 9 (a))5,510,6033,605,751
Foreign Currency Translation Reserve - exchange differences451,281370,657
Demerger Reserve(7,336,678)(7,336,678)
(1,374,794)(3,360,270)
  • Movements in Options and Performance Rights were as follows:
DateDetailsNumber of Unlisted Performance Rights$ (i)
1 Jul 2024Opening balance17,860,0003,605,751
VariousIssue of performance rights4,725,000-
31 Dec 2024Cancelation of unvested performance rights(425,000)(22,754)
31 Dec 2024Share based payment expense-1,927,606
31 Dec 2024Closing balance22,160,0005,510,603

Note

  • The value of performance rights granted during the period is estimated as at the grant date based on the underlying share price with the expense recognised over the vesting period in accordance with Australian Accounting Standards.
  • COMMITMENTS AND CONTINGENCIES
  • Commitments
31 December 2024 $30 June 2024 $
Exploration Commitments - Kasiya Rutile-Graphite Project:
Within one year201,477107,155
After one year but not more than five years82,04346,705
283,520153,860

As a condition of retaining the current rights to tenure to exploration tenements, the Group is required to pay an annual rental charge and meet minimum expenditure requirements for each tenement. These obligations are not provided for in the financial statements and are at the sole discretion of the Group. The majority of the remaining exploration commitments relate to licences with a term greater than one year. For the purposes of disclosure, the Group has apportioned the remaining commitments on an equal monthly basis over the remaining term of the exploration licences.

Contingencies

At the last annual reporting date, the Consolidated Entity did not have any material contingent liabilities. There has been no material change in contingent assets and liabilities of the Consolidated Entity during the half year.

DIVIDENDS PAID OR PROVIDED FOR

No dividend has been paid or provided for during the half year (2023: nil).

FAIR VALUE OF FINANCIAL INSTRUMENTS

The net fair value of financial assets and financial liabilities approximates their carrying value.

SUBSEQUENT EVENTS AFTER BALANCE DATE

On 22 January 2025, the Company announced the results of an OPFS for Kasiya which reaffirm Kasiya potential to become the largest and lowest-cost producer of natural rutile and natural flake graphite while generating exceptional economics.

Other than the above, there are no matters or circumstances which have arisen since 31 December 2024 that have significantly affected or may significantly affect:

  • the operations, in periods subsequent to 31 December 2024, of the Group;
  • the results of those operations, in periods subsequent to 31 December 2024, of the Group; or
  • the state of affairs, in periods subsequent to 31 December 2024, of the Group.

DIRECTORS' DECLARATION

In accordance with a resolution of the Directors of Sovereign Metals Limited, I state that:

In the opinion of the Directors:

  • the financial statements and notes thereto are in accordance with the Corporations Act 2001, including:
  • giving a true and fair view of the consolidated entity's financial position as at 31 December 2024 and of its performance for the half year ended on that date.

This declaration is signed in accordance with a resolution of the Board of Directors made pursuant to section 303(5) of the Corporations Act 2001.

On behalf of the Board

Frank Eagar

Managing Director and CEO

Ore Reserve for the Kasiya Deposit

ClassificationTonnes (Mt)Rutile Grade (%)Contained Rutile (Mt)Graphite Grade (TGC) (%)Contained Graphite (Mt)RutEq. Grade* (%)
Proved------
Probable5381.03%5.51.66%8.92.00%
Total5381.03%5.51.66%8.92.00%

* RutEq. Formula: Rutile Grade x Recovery (100%) x Rutile Price (US$1,484/t) + Graphite Grade x Recovery (67.5%) x Graphite Price (US$1,290/t) / Rutile Price (US$1,484/t). All assumptions are from the Kasiya PFS ** Any minor summation inconsistencies are due to rounding

Kasiya Total Indicated + Inferred Mineral Resource Estimate at 0.7% rutile cut-off grade (inclusive of Ore Reserves)

ClassificationResource (Mt)Rutile Grade (%)Contained Rutile (Mt)Graphite Grade (TGC) (%)Contained Graphite (Mt)
Indicated1,2001.0%12.21.5%18.0
Inferred6090.9%5.71.1%6.5
Total1,8091.0%17.91.4%24.4

AUDITOR'S INDEPENDENCE DECLARATION

INDEPENDENT AUDITOR'S REVIEW REPORT

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note