Sovereign Metals Limited (Company or Sovereign) (ASX:SVM & AIM:SVML) is pleased to provide its quarterly report for the period ended 31 December 2023.

HIGHLIGHTS

Project Optimisation

  • During the quarter, Sovereign advanced optimisation test work and technical studies for the Kasiya rutile-graphite project (Kasiya or the Project) with the Company's strategic investor, Rio Tinto
  • Significant field activities and a number of test work programs have commenced in order to provide data for the Project optimisation phase
  • The Company aims to become the world's largest, lowest cost and lowest-emissions producer of two critical minerals - titanium (rutile) and graphite

Key Management Appointments to Drive Project Optimisation and Development at Kasiya

  • Appointment of experienced Africa-based mining executive, Mr Frank Eagar, as the new Managing Director and CEO
  • Previous Managing Director Dr Julian Stephens has transitioned to Non-Executive Director
  • Key technical appointments of experienced African engineering, social and environmental teams to work on advancing the Kasiya project

Lithium-Ion battery graphite program upscaled

  • Over 60 tonnes of ore was extracted targeting production of an initial 600kg of natural graphite for lithium-ion battery anode test work and product qualification
  • The upscaled graphite qualification program will support ongoing Project studies
  • Sovereign and Rio Tinto have agreed to collaborate to qualify graphite from Kasiya, with a particular focus on supplying the spherical purified graphite (SPG) segment of the lithium-ion battery anode market
  • This graphite qualification program coincides with China's announced curbs on exports of natural graphite, a critical mineral for the US, EU, Japan and Australia

Highly-experienced social specialist appointed

  • Africa-based social specialist consultancy, SocialEssence were appointed to lead social and community development programs for Sovereign in Malawi
  • SocialEssence joins Sovereign's Owners Team and will design, implement, and manage several social and community initiatives which will feed into Project studies and permitting
  • SocialEssence has a strong and successful track record of implementing social responsibility programs across southern Africa, including at First Quantum Minerals' Zambian project

Classification 2.2: This announcement includes Inside Information

The Pre-Feasibility Study (PFS) confirmed Kasiya as a potential major critical minerals project with an extremely low CO2-footprint delivering substantial volumes of natural rutile and graphite to global markets while generating significant economic returns.

At the completion of the PFS, the Company commenced an optimisation study phase prior to advancing to the Definitive Feasibility Study (DFS). During the quarter, significant field activities and test work commenced.

The optimisation phase will be conducted in collaboration with the Company's strategic partner, Rio Tinto, following their investment into the Company in July 2023.

KEY MANAGEMENT APPOINTMENTS TO DRIVE PROJECT OPTIMISATION

Effective from 20 October 2023, the Company appointed Mr Frank Eagar as Managing Director and Chief Executive Officer (CEO). Dr Julian Stephens, transitioned to a Non-Executive Director of Sovereign, remaining as a consultant assisting and supporting the incoming technical and management team.

Prior to Central Copper, Mr Eagar was the CEO (and prior to that the CFO) of Baobab Steel Limited (Baobab) another AMED controlled company, where he managed the completion of a DFS and a joint venture with the World Bank's IFC to procure strategic investors and raise project finance for Baobab's US$1 Billion, fully permitted, integrated 500ktpa Steel and Vanadium Project in Mozambique.

Mr Eagar joined Sovereign in December 2022 as General Manager in Malawi, where he has already expanded the team with a focus on Malawian nationals, developed strong relationships with Government and developed a clear understanding of the Kasiya Project and its development landscape.

Sovereign has also made several key technical appointments as the Company transitions into project optimisation and development of the Kasiya Project and is poised to become a significant supplier of natural rutile and graphite. These key appointments bring a strong track record of successful large-scale project development and operations management, as well as extensive experience in southern Africa.

These management changes come at an important time for the Company as it transitions from the PFS into the next study phases including optimisation, community and stakeholder engagements and project permitting.

LITHIUM-ION BATTERY GRAPHITE PROGRAM UPSCALED

During the quarter, Sovereign completed the extraction of a 60 tonne bulk sample of ore from Kasiya to produce an initial 600kg of natural flake graphite. This sampling program is part of the Company's graphite qualification, product development and downstream battery anode test work phase. A major component to graphite sales agreements is customer qualification with graphite produced from this program to be shared with prospective end-users in addition to being used for upscaled downstream test work.

The mechanised drill program used a bespoke 300mm diameter spiral auger to extract the material from across Kasiya's planned future pits with sampling to a maximum 20m depth.

Figures 1 & 2: Bulk sample mechanised spiral drilling and sampling at Kasiya in November 2023

The bulk sample is undergoing pre-processing at the Company's laboratory in Lilongwe, Malawi. The sample is being processed utilising the newly installed Kwatani 30-inch single and double-deck vibrating separators for sizing and de-sliming (Figure 3). The sand fraction is then processed over the new Holman Wilfley 2000 wet shaking table to produce a graphite pre-concentrate and a separate heavy mineral concentrate (HMC) containing the rutile (Figure 4). The graphite pre-concentrate is expected to grade 4-5% Ct.

Figure 3. Installation of the new Kwatani 30-inch single-deck and double-deck vibrating separators for sizing and de-sliming bulk samples at the Company's Malawi laboratory and metallurgical facility

Figure 4: Holman-Wilfley 2000 Series shaking table operating at Sovereign's Lilongwe laboratory in Malawi.

Final processing will then be completed at international commercial laboratories. The graphite pre-concentrate will undergo traditional flotation and polishing processes to target >96% Ct product suitable as a lithium-ion battery anode feedstock.

Downstream Test work

The initial ~600kg of flake graphite product produced will be used for downstream test-work and product qualification targeting the battery anode sector. Previously reported initial characterisation test work on Kasiya's graphite has indicated excellent suitability for use in lithium-ion batteries with very high purity and very high crystallinity being the key features (refer to ASX Announcement dated 8 June 2023).

Downstream test-work and qualification on the flake graphite product will involve the following stages to be completed at recognised international battery sector laboratories;

  • Purification to >99.95% Ct
  • Micronisation
  • Spheronisation
  • Carbon coating
  • Anode production
  • Electrochemical characterisation

Raw flake graphite products plus final CSPG (coated spheronised graphite product) will be provided to potential offtakers for assessment and pre-qualification. Through Sovereign's long-term experience in graphite, the Company has built a strong understanding of the graphite market and developed well-established relationships with offtakers and customers.

Figures 5 & 6: SEM micrograph of Kasiya graphite flotation concentrate from previous test work

Industry Developments

The upscaled graphite program comes as China implements curbs on exports of natural graphite under "national security" concerns. Effective 1 December 2023, China requires export permits for some graphite products including natural graphite and natural graphite products critical to EV production. China is the world's top graphite producer and exporter and also refines more than 90% of the world's graphite into the material that is used in virtually all EV battery anodes.

China's commerce ministry said the move on graphite was "conducive to ensuring the security and stability of the global supply chain and industrial chain, and conducive to better safeguarding national security and interests".

Since the restrictions, total exports of flake graphite dropped by 94% on a monthly basis in December, while exports of spherical graphite slumped by 92% (China customs data). Exports to major destinations also slowed notably in December. Flake graphite volumes to Japan fell from 6,138 tonnes in November to zero in December, while exports to the United States fell from 511 tonnes in November to zero in December (Fastmarkets). It was reported by Japan News, that, Japan, which depends on China for 90% of its graphite imports, likely needs to urgently diversify its procurement sources.

Kasiya is one of the world's largest natural flake graphite deposits and has the potential to become a key source of long term strategic supply to the US, UK, EU, Japan and South Korea.

HIGHLY-EXPERIENCED SOCIAL SPECIALIST APPOINTED

Subsequent to the quarter, Sovereign appointed SocialEssence (Pty) Ltd (SocialEssence), an Africa-based specialist social performance consultancy, who will assist in the continued development of the Company's stakeholder relations, social performance objectives and its Community and Social Responsibility (CSR) framework.

Sovereign has engaged SocialEssence to design and execute social performance activities during the DFS phase. Founder, Mr Garth Lappeman, has over 16 years of on the ground social performance planning and implementation experience in accordance with IFC Performance Standards and World Bank Environmental, Health and Safety Guidelines. SocialEssence has been active in a number of countries working on projects in Angola, Botswana, Democratic Republic of Congo, Kenya, Kyrgyzstan, Liberia, Malawi, Mozambique, Namibia, Panama, Uganda, Sierra Leone, South Africa, Northern Sudan, Tanzania, Uzbekistan, and Zambia.

Most notably, in Zambia, SocialEssence's Director was involved from early exploration through to steady state production of First Quantum Minerals Ltd's (First Quantum Minerals) Trident operations, which includes the Sentinel Copper Mine which is of similar scale to Sovereign's Kasiya project. Mr Lappeman was responsible for implementing and managing social and community initiatives for First Quantum Minerals as it established its large-scale commercial operations

SocialEssence will:

  • prepare Kasiya's Social Impact Assessment and Management Plan for the DFS and permitting;
  • design, implement and manage social performance activities including stakeholder engagement, development of key relationships;
  • prove the feasibility of critical social performance measures (including early local content, and piloting of livelihood restoration programs, and piloting of rehabilitation activities to restore land for agricultural use); and
  • align with the Company's ESG Framework.

NEXT STEPS

Sovereign is currently conducting an optimisation study prior to advancing to the DFS. The Company aims to become the world's largest, lowest cost and lowest-emissions producer of two critical minerals - titanium (rutile) and graphite. The Company plans to update the market on the progress of the following in coming months:

  • Further appointments to owner's team to build on the Company's execution capabilities;
  • Results of graphite product development, downstream and qualification test work;
  • Regional hand-auger drilling on mineralisation extensions;
  • Progress on the optimisation work streams alongside Rio Tinto via the project Technical Committee; and
  • Community and social engagements across Malawi and the Kasiya area.

Ore Reserve for the Kasiya Deposit

ClassificationTonnes (Mt)Rutile Grade (%)Contained Rutile (Mt)Graphite Grade (TGC) (%)Contained Graphite (Mt)RutEq. Grade* (%)
Proved------
Probable5381.03%5.51.66%8.92.00%
Total5381.03%5.51.66%8.92.00%

* RutEq. Formula: Rutile Grade x Recovery (100%) x Rutile Price (US$1,484/t) + Graphite Grade x Recovery (67.5%) x Graphite Price (US$1,290/t) / Rutile Price (US$1,484/t). All assumptions are from the Kasiya PFS ** Any minor summation inconsistencies are due to rounding

APPENDIX 1: RELATED PARTY PAYMENTS

During the quarter ended 31 December 2023, the Company made payments of $461,000 to related parties and their associates. These payments relate to existing remuneration arrangements (executive salaries, director fees, superannuation and bonuses ($273,000)), business development services ($35,000) and provision of serviced office facilities, company secretarial services and administration services ($153,000).

APPENDIX 2: SUMMARY OF MINING TENEMENTS

As at 31 December 2023, the Company had an interest in the following tenements:

LicenceHolding EntityInterestTypeLicence Renewal DateExpiry Term Date 1Licence Area (km 2 )Status
EL0609MML100%Exploration25/09/202425/09/2028440.5Granted
EL0582SSL100%Exploration15/09/2023 215/09/2027285.0Granted
EL0492SSL100%Exploration29/01/202529/01/2025935.4Granted
EL0528SSL100%Exploration27/11/202327/11/202516.2Granted
EL0545SSL100%Exploration12/05/202412/05/202653.2Granted
EL0561SSL100%Exploration15/09/2023 215/09/2027124.0Granted
EL0657SSL100%Exploration3/10/20253/10/20292.3Granted

Notes:

SSL: Sovereign Services Limited, MML &McCourt Mining Limited

1 An exploration licence (EL) covering a preliminary period in accordance with the Malawi Mines and Minerals Act (No 8. Of 2019) (Mines Act) is granted for a period not exceeding three (3) years. Thereafter two successive periods of renewal may be granted, but each must not exceed two (2) years. This means that an EL has a potential life span of seven (7) years. ELs that have come to the end of their term can be converted by the EL holder into a retention licence (RL) for a term of up to 5 years subject to meeting certain criteria.

2 The Company submitted an extension application for EL0582 and EL0561 prior to the renewal date in accordance with the Mines Act .

APPENDIX 3: MINING EXPLORATION EXPENDITURES

ActivityA$'000
Drilling(291)
Assaying and Metallurgical Test-work(162)
Studies, Reserve/Resource Estimation, Programs(986)
Malawi Operations - Site Office, Personnel, Field Supplies, Equipment, Vehicles and Travel(984)
Total as reported in Appendix 5B(2,423)

Appendix 5B

Mining exploration entity or oil and gas exploration entity

quarterly cash flow report

Name of entity

Sovereign Metals Limited

ABNQuarter ended ("current quarter")
71 120 833 42731 December 2023
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (6 months) $A'000
1.Cash flows from operating activities--
1.1Receipts from customers
1.2Payments for(2,423)(4,296)
(a) exploration & evaluation
(b) development--
(c) production--
(d) staff costs(780)(1,107)
(e) administration and corporate costs(414)(928)
1.3Dividends received (see note 3)--
1.4Interest received673745
1.5Interest and other costs of finance paid--
1.6Income taxes paid--
1.7Government grants and tax incentives--
1.8.1Other - Demerger Costs(41)(67)
1.8Other - Business Development(325)(595)
1.9Net cash from / (used in) operating activities(3,310)(6,248)
2.Cash flows from investing activities--
2.1Payments to acquire or for:
(a) entities
(b) tenements--
(c) property, plant and equipment(243)(243)
(d) exploration & evaluation--
(e) investments--
(f) other non-current assets--
2.2Proceeds from the disposal of:--
(a) entities
(b) tenements--
(c) property, plant and equipment--
(d) investments--
(e) other non-current assets--
2.3Cash flows from loans to other entities-34
2.4Dividends received (see note 3)--
2.5Other (provide details if material)--
2.6Net cash from / (used in) investing activities(243)(209)
3.Cash flows from financing activities-40,598
3.1Proceeds from issues of equity securities (excluding convertible debt securities)
3.2Proceeds from issue of convertible debt securities--
3.3Proceeds from exercise of options--
3.4Transaction costs related to issues of equity securities or convertible debt securities(13)(252)
3.5Proceeds from borrowings--
3.6Repayment of borrowings--
3.7Transaction costs related to loans and borrowings--
3.8Dividends paid--
3.9Other (provide details if material)--
3.10Net cash from / (used in) financing activities(13)40,346
4.Net increase / (decrease) in cash and cash equivalents for the period
4.1Cash and cash equivalents at beginning of period43,0215,564
4.2Net cash from / (used in) operating activities (item 1.9 above)(3,310)(6,248)
4.3Net cash from / (used in) investing activities (item 2.6 above)(243)(209)
4.4Net cash from / (used in) financing activities (item 3.10 above)(13)40,346
4.5Effect of movement in exchange rates on cash held(18)(16)
4.6Cash and cash equivalents at end of period39,43739,437
5.Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accountsCurrent quarter $A'000Previous quarter $A'000
5.1Bank balances129189
5.2Call deposits39,30842,832
5.3Bank overdrafts--
5.4Other (provide details)--
5.5Cash and cash equivalents at end of quarter (should equal item 4.6 above)39,43743,021
6.Payments to related parties of the entity and their associatesCurrent quarter $A'000
6.1Aggregate amount of payments to related parties and their associates included in item 1461
6.2Aggregate amount of payments to related parties and their associates included in item 2-
7.Financing facilities Note: the term "facility' includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity.Total facility amount at quarter end $A'000Amount drawn at quarter end $A'000
7.1Loan facilities--
7.2Credit standby arrangements--
7.3Other (please specify)--
7.4Total financing facilities--
7.5Unused financing facilities available at quarter end-
8.Estimated cash available for future operating activities$A'000
8.1Net cash from / (used in) operating activities (item 1.9)(3,310)
8.2(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))-
8.3Total relevant outgoings (item 8.1 + item 8.2)(3,310)
8.4Cash and cash equivalents at quarter end (item 4.6)39,437
8.5Unused finance facilities available at quarter end (item 7.5)-
8.6Total available funding (item 8.4 + item 8.5)39,437
8.7Estimated quarters of funding available (item 8.6 divided by item 8.3)12
8.8If item 8.7 is less than 2 quarters, please provide answers to the following questions:

Answer: Not applicable

Answer: Not applicable

Answer: Not applicable

Compliance statement

2 This statement gives a true and fair view of the matters disclosed.

Date: 31 January 2024

Authorised by: Company Secretary

(Name of body or officer authorising release - see note 4)

Notes

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note