CatalystWireBeta

Update on production at Triton FPSO

In brief · summary, not quotable

Serica Energy PLC announced that production has resumed at the Triton FPSO following a temporary suspension due to a flare system issue announced on October 8, 2025. Production has been ramped up by the operator and has now reached a rate of over 25,000 boepd net to Serica. The company had expected to resume production at a limited level shortly after the initial announcement.

Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your SQZ notes

Following the announcement on 8 October that an issue with the flare system on the Triton FPSO resulted in a temporary suspension of production, production resumed in line with expectations at a limited level shortly after that date. Since then, the operator has ramped up production, which has now reached a rate of over 25,000 boepd net to Serica.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note