Second Quarter Report to 31 December 2024

In brief · summary, not quotable

Q2 FY2025 production increased 6% to 20,238 4E ounces; EBITDA doubled to $6.7 million; Thaba JV on track for HY2 start.

vs expectations: in line with expectations

  • SDO Production (4E) 20,238 ounces (prior 19,160 ounces)
  • SDO Net Revenue $25.7 million (prior $21.9 million)
  • Group EBITDA $6.7 million (prior $3.3 million)
  • Cash Balance $77.5 million (prior $94.7 million)
  • Final Dividend FY2024 1 pence per share
  • Annual Production Target 73,000 to 76,000 ounces
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your SLP notes

Sylvania (AIM: SLP), the platinum group metals ("PGM") producer and developer with assets in South Africa, announces its results for the three months ended 31 December 2024 (the "Quarter" or the "Period" or "Q2 FY2025). Unless otherwise stated, the consolidated financial information contained in this report is presented in United States Dollars ("USD" or "$").

Highlights

Sylvania Dump Operations ("SDO") produced 20,238 4E (26,373 6E) PGM ounces in Q2 FY2025, a 6% increase 4E and a 7% increase 6E for the Quarter (Q1 FY2025: 19,160 4E (24,549 6E) PGM ounces);

SDO recorded $25.7 million net revenue for the Quarter, a 17% increase quarter-on-quarter (Q1 FY2025: $21.9 million);

Group EBITDA of $6.7 million, a 104% increase for the Quarter (Q1 FY2025: $3.3 million);

Cash balance as at 31 December 2024 of $77.5 million (30 September 2024: $94.7 million) in line with expectations;

Thaba Joint Venture ("Thaba JV") project is on schedule to commence first production in HY2 FY2025 with all phases of construction of the chrome and PGM beneficiation plants progressing well;

Environmental, Social and Governance ("ESG") Report 2024 released;

During the Period, the Company commenced a Share Buyback from the market and 605,000 shares were bought back during the Quarter, amounting to approximately $0.3 million in aggregate; and

The final dividend of 1 pence per share held for FY2024 was paid on 6 December 2024, amounting to $3.3 million.

Outlook

Construction of the centralised PGM filtration plant at Lesedi is progressing well and is on schedule to be completed during Q2 FY2026;

New, host-mine, run of mine ("ROM") plant commissioned at Lesedi, with first higher grade current arisings received during Q2 FY2025 and operation expected to achieve steady state operation towards the end of Q3 FY2025;

The operational readiness phase of the Thaba JV will continue during Q3 FY2025;

Specialist studies required by the regulators for the Volspruit Project are being finalised to allow for the submission of the Water Use Licence Application ("WULA") during Q3 FY2025;

The Group maintains strong cash reserves enabling it to balance the requirements of capital expenditure projects (new tailings storage facilities ("TSFs"), expansion and process optimisation capital, new filtration plant, and Thaba), and to support growth initiatives with the potential to return value to shareholders;

Share Buyback of up to $1.6 million continues; and

Annual production target of 73,000 to 76,000 ounces maintained for the year.

Commenting on the results, Sylvania's CEO, Jaco Prinsloo, said:

"I am pleased to report that the second quarter of FY2025 was a very positive one with results in line with our expectations, achieving 20,238 4E PGM ounces from the SDO, being a 6% increase from that recorded in Q1 FY2025. Additionally, the average 4E gross basket price increased by 2% both in USD terms and in ZAR terms, which alongside the increase in production ounces, resulted in improved revenue performance compared to Q1 FY2025.

"On the cost front, Group cash unit cost reduced 3% both in ZAR and USD terms, assisted by higher PGM ounce production while direct operating costs increased 4% compared with the previous quarter in ZAR terms. Management continues to focus on disciplined operational and cost control initiatives.

"The Thaba JV project remains on track to commence first production in HY2 FY2025. We are looking forward to the Thaba JV augmenting and de-risking our portfolio by introducing a chrome revenue stream.

"Sylvania's interim financial results will be released on Tuesday 18 February 2025 and I, and the Group CFO, Lewanne Carminati, will be hosting investor webinars and shareholder meetings over the course of the week of the release. Once again, we look forward to engaging with our valued stakeholders during this period."

1 PGM plant recovery is calculated on the production ounces that include the work-in-progress ounces when applicable.

2 The gross basket price in the table is the December 2024 gross 4E basket used for revenue recognition of ounces delivered in Q2 FY2025, before penalties/smelting costs and applying the contractual payability.

3 Revenue (6E) for Q2 FY2025, before adjustments is $23.4 million (6E prill split is Pt 50%, Pd 18%, Rh 9%, Au 0%, Ru 18%, Ir 5%). Revenue excludes profit/loss on foreign exchange.

4 The capital expenditure includes 50% attributable capital for the Thaba JV.

5 The cash balance excludes restricted cash held as guarantees $1.1 million (Q1 FY2025 $1.3 million).

7 The all-in cost increase is due to the increased spend on the Thaba JV and capital projects (strategic and growth capital). The Thaba JV spend for Q2 FY2025 is $5.6 million (attributable).

OPERATIONAL OVERVIEW

Safety, health and environment ("SHE")

Health, safety and environment remains a focus area on all operations. Doornbosch remains 12-years lost-time injury ("LTI")-free, and Doornbosch and Lannex have been total injury-free for over three years and one year, respectively, during the Period. One LTI occurred at Mooinooi where a contractor boilermaker sustained an injury to his hand during a maintenance task.

The Company's 'Silly Season' campaign, conducted from November 2024 to January 2025, underscored the importance of maintaining a hazard-free and injury-free environment. Through various creative initiatives, employees embraced a culture of mindfulness and vigilance regarding safety protocols, resulting in the remarkable achievement of zero injuries throughout the festive season.

Sylvania also executed a successful anti-gender-based violence ("GBV") campaign, promoting a workplace culture of respect and equality. Informative sessions and open dialogues enabled employees to gain a deeper understanding of the impact of GBV and to become ambassadors for change. This commitment to inclusivity contributes to a more harmonious and supportive professional community.

The Company remains steadfast in its dedication to maintaining a safe, healthy, and environmentally conscious workplace.

Operational performance

The SDO produced 20,238 4E PGM ounces during the Quarter. This equates to an increase of 6% compared to Q1 FY2025. This improvement was primarily due to an increase in feed head grade of third-party material treated at the Company's Eastern operations, which contributed to the overall grade increase of 8% for the Quarter, while PGM feed tons were marginally lower, impacted by a four-day planned maintenance shutdown at Tweefontein during October 2024. The reconstituted PGM recovery efficiency for SDO is 2% lower compared to Q1 FY2025, primarily due to a higher portion of PGM ounces produced from Lesedi and Lannex, which are treating ores with lower recovery potential.

The focus of the operations remains on identifying the best feed sources to maximise the recovery potential through effective feed source blending and also pro-active management of ROM grades from the host mine. The higher grades from outside sources on the Eastern operations have continued to contribute positively to performance and the achievement of targets.

SDO operating cash costs per 4E PGM ounce decreased 1% in South African Rand ("ZAR") terms to ZAR14,302/ounce and 1% in dollar terms, to $798/ounce (Q1 FY2025: ZAR14,506/ounce and $808/ounce respectively), assisted by improved PGM ounce production.

Operational opportunities and outlook

The column flotation cell at Millsell was successfully commissioned in Q2 FY2025 and is currently in an optimisation phase to improve Millsell's PGM concentrate quality and payability of the concentrate produced.

The construction of the centralised PGM filtration plant at Lesedi is progressing well, with earthworks and civils already well underway, and the project is on track to be completed during Q2 FY2026.

The host mine's Lesedi ROM plant was commissioned in October 2024 and aims to ramp-up towards a steady state by the end of Q3 FY2025, resulting in an attractive new higher grade current arising feed source to the Lesedi operation. While the Company's Section 189A ("S189A") of the Labour Relations Act, 66 of 1995 ("LRA") consultation process, that was initiated in July 2024, is still in place, we continue to monitor and evaluate the quality of new current arisings feed source, which we believe could improve the profitability of the Lesedi operation based on initial plant performance trends since commissioning.

To ensure meaningful consultation in line with section 189A (2)(d), the Company agreed to extend the Section 189A consultation process period in progress at Lesedi until at least the end of February 2025, and further updates will be provided as and when results are forthcoming.

Additionally, work is underway at Lannex to optimise the milling and fines classification circuit as well as to improve both chrome beneficiation and PGM recovery efficiencies at the operation.

FINANCIAL OVERVIEW

Financial performance

Revenue (4E) for the Quarter increased by 7% to $19.9 million (Q1 FY2025: $18.5 million) as a result of the increased production during the Period and a slight increase in the 4E gross basket price for the Quarter of 2% to $1,387/ounce against $1,356/ounce in Q1 FY2025.

Net revenue, which includes revenue from by-products, base metals and the quarter-on-quarter sales adjustment, increased by 17% to $25.7 million (Q1 FY2025: $21.9 million). Net revenue includes attributable revenue received for ounces produced from material purchased from third parties.

Group cash costs per 4E PGM ounce decreased by 3% in ZAR terms from ZAR17,519/ounce to ZAR16,971/ounce and 3% in dollar terms from $976/ounce to $946/ounce, mainly as a result of the 6% increase in ounce production quarter-on-quarter.

General and administrative costs decreased to $0.57 million from $0.63 million in Q1 FY2025. These costs are incurred in USD, Pounds Sterling ("GBP") and ZAR.

Group EBITDA for the Quarter was $6.7 million (Q1 FY2025: $ 3.3 million), a 104% increase quarter-on-quarter, which is mainly due to the 6% higher production and 2% increase in basket price in dollar terms. Net profit was $6.3 million (Q1 FY2025: $3.0 million), a 110% increase from Q1 FY2025.

The Group cash balance decreased by 18% quarter-on-quarter to $77.5 million (Q1 FY2025 $94.7 million), which was primarily due to the capital expenditure on the Thaba JV development of $12.1 million, the payment of the final dividend of $3.3 million in December 2024 and $1.4 million spent on stay-in-business and strategic capital as compared to Q1 FY2025.

Provisional tax paid to the South African Revenue Services amounted to $0.4 million (ZAR6.6 million). Interest was earned on surplus cash invested in both USD and ZAR amounting to $1.1 million (ZAR19.8 million).

Cash outflow on capital amounted to $16.4 million (Q1 FY2025 $12.6 million) comprising $12.1 million on the development of the Thaba JV, $4.1 million on stay in business and improvement capital and $0.2 million on exploration projects. It is important to note that the Thaba JV capital cash outflow is the full 100% of the project spend, however, 50% will be recovered from the JV partner.

At a corporate level, 605,000 shares were bought back during the Quarter in line with the share buyback programme that was announced on 20 December 2024, amounting to approximately $0.3 million in aggregate. A cash dividend of 1 pence per share held was paid on 6 December 2024, amounting to $3.3 million.

Cash generated from operations before working capital movements was $6.9 million, with net changes in working capital of $4.2 million mainly due to the movement in trade receivables of $3.0 million.

The impact of the exchange rate fluctuations amounted to a $0.9 million loss due to the 9% depreciation of the ZAR to the USD at the end of Q2 FY2025.

THABA JV

The unincorporated joint venture Agreement between the Company's wholly owned South African subsidiary, Sylvania Metals (Pty) Ltd ("Sylvania Metals") and Limberg Mining Company (Pty) Ltd ("LMC"), a subsidiary of ChromTech Mining Company (Pty) Ltd ("ChromTech"), the Thaba JV, is advancing well and as expected. The project execution phase of approximately 18-24 months, which commenced in August 2023, is progressing as planned and the project is on schedule for first production to commence in HY2 FY2025.

Design for the project is complete. Procurement for the operational readiness phase will continue during Q3 FY2025. Recruitment and on-boarding of operational employees commenced during H1 FY2025, with the bulk of employees on site from January 2025 to prepare for the start of cold commissioning.

Fabrication and delivery of long lead mechanical items are complete, with the delivery of the final platework items for the crushing circuit scheduled for Q3 FY2025. Equipment and infrastructure for the supply of temporary power during commissioning are on site and currently being installed.

The construction of the high voltage yard is progressing slower than planned due to high rainfall over the past two months. However, the power projects are forecasted to be completed by Q4 FY2025 and the delay will not impact commissioning.

Despite delays associated with abnormally high rainfall during the months of December 2024 and January 2025, the critical path of the project is well understood, risks have been adequately mitigated, and there is currently no anticipated delay in the project's completion.

MINERAL ASSET DEVELOPMENT

The Group continues to improve its technical understanding of the three approved PGM-base metal mining rights it holds on the Northern Limb of the Bushveld Igneous Complex ("BIC") in South Africa. A geophysical survey was undertaken over the Aurora Project area during Q2 FY2025. All additional information will be utilised in determining how best to develop these assets.

Volspruit Project

Following on from the positive Scoping Study reported in the previous quarter, work continues on assessing new technologies that may assist in upgrading the feed grade for Volspruit. A report on the processing test work completed to date is expected during Q3 FY2025. The outcomes of these assessments will assist in determining how best to derive further value from the project.

Specialist studies required by the regulators are being finalised to allow for the submission of the WULA during Q3 FY2025. The final Environmental Impact Assessment ("EIA") Report and associated Environmental Management Programme for the amendment of the EIA was submitted at the end of Q1 FY2025. A decision from the competent authority is expected during Q3 FY2025.

Far Northern Limb Projects

An exploration programme for Aurora has been compiled based on the reinterpretation of historic drilling. A geophysical survey covering the Aurora Project area was successfully completed during Q2 FY2025. The results of the survey are currently being assessed and incorporated into the existing database in order to determine next steps.

Processing test work on samples from the most recent drilling campaign at Aurora, aimed at gaining an understanding of the metallurgical characteristics of the mineralised zone, will be completed in HY2 FY2025.

If required and justified, future borehole drilling programmes will be designed based on the outcomes of the geophysical and metallurgical test work.

The Company continues to explore potential disposal options for the Hacra asset as a result of Sylvania focussing its exploration activities on the shallower mineralisation at its Volspruit and Aurora projects.

ESG Report 2024

On 25 November 2024, the Company released its ESG Report 2024, 'Sustaining Progress: Sylvania's Commitment to Responsible Growth', for the year ended 30 June 2024. The full report is available for download from the Company's website www.sylvaniaplatinum.com.

Share Buyback

During the Period, the Company commenced a Share Buyback from the market and, as at 27 January 2025, has bought back a total of 1,705,000 Ordinary Shares at an average price of 41.08 pence per share, equating to $0.87 million in aggregate. The purpose of the Share Buyback is to reduce the share capital of the Company and has been funded from the Company's current cash balance.

For the purposes of the Financial Conduct Authority's Disclosure and Transparency Rules, the Company's issued share capital is 273,366,725 Ordinary Shares. Following the above purchases, a total of 13,257,395 Ordinary Shares, including 1,705,000 pending cancellation, are held in Treasury. Therefore, the total number of Ordinary Shares with voting rights in Sylvania was 260,109,330 Ordinary Shares.

Interim financial results announcement

The Company will announce its interim results for the six months ended 31 December 2024 on Tuesday, 18 February 2025.

Analyst presentation

The Company will be hosting a webinar for analysts on the day of release of its interim results. To register your interest, please email sylvania@BlytheRay.com.

Online investor presentation

The Company is committed to ensuring that there are appropriate communication channels for all elements of its shareholder base so that its strategy, business model and performance are clearly understood.

Sylvania's CEO, Jaco Prinsloo, and CFO, Lewanne Carminati, will host a live investor presentation, via the Investor Meet Company platform, on Wednesday, 19 February 2025 at 15:00 GMT.

Investors can sign up to Investor Meet Company for free and include Sylvania Platinum Limited via https://www.investormeetcompany.com/sylvania-platinum-limited/register-investor.

Investors who have already registered and elected to meet the Company, will be automatically invited.

ANNEXURE

GLOSSARY OF TERMS FY2025

The following definitions apply throughout the Period:

3E PGMs3E ounces include the precious metal elements Platinum, Palladium and Gold
4E PGMs4E PGM ounces include the precious metal elements Platinum, Palladium, Rhodium and Gold
6E PGMs6E ounces include the 4E elements plus additional Iridium and Ruthenium
AGMAnnual General Meeting
AIMAlternative Investment Market of the London Stock Exchange
All-in costAll-in sustaining cost plus non-sustaining and expansion capital expenditure
All-in sustaining costProduction costs plus all costs relating to sustaining current production and sustaining capital expenditure.
AttributableResources or portion of investment belonging to the Company
BCMBank cubic metres
CLOsCommunity Liaison Officers
CompanyThe purely equity holding entity registered in Bermuda, Sylvania Platinum Limited, with its entire share capital admitted on AIM.
DMREDepartment of Mineral Resources and Energy
EBITDAEarnings before interest, tax, depreciation and amortisation
EAEnvironmental Authorisation
EAPEmployee Assistance Program
EDEPEmployee Dividend Entitlement Programme
EEFsEmployment Engagement Forums
EIAEnvironmental Impact Assessment
EIREffective interest rate
EMPREnvironmental Management Programme Report
ESGEnvironment, Social and Governance
GBPPounds Sterling
GHGGreenhouse gases
GISTMGlobal Industry Standard on Tailings Management
GRIGlobal Reporting Initiative
GroupThe Company and its controlled entities.
IASBInternational Accounting Standards Board
ICEInternal combustion engine
ICMMInternational Council on Mining and Metals
IFRICInternational Financial Reporting Interpretation Committee
IFRSInternational Financial Reporting Standards
LesediPhoenix Platinum Mining Proprietary Limited, renamed Sylvania Lesedi
LSELondon Stock Exchange
LTILost-time injury
LTIFRLost-time injury frequency rate
MF2Milling and flotation technology
MPRDAMineral and Petroleum Resources Development Act
MRAMining Right Application
MREMineral Resource Estimate
MtMillion Tons
NUMSANational Union of Metals Workers of South Africa
NWANational Water Act 36 of 1998
PGMPlatinum group metals comprising mainly platinum, palladium, rhodium, and gold
PDMRPerson displaying management responsibility
PEAPreliminary Economic Assessment
PFSPreliminary Feasibility Study
Pipeline ounces6E ounces delivered but not invoiced
Pipeline revenueRevenue recognised for ounces delivered, but not yet invoiced based on contractual timelines
Pipeline sales adjustmentAdjustments to pipeline revenues based on the basket price for the period between delivery and invoicing
Project EchoSecondary PGM Milling and Flotation (MF2) program announced in FY2017 to design and install additional new fine grinding mills and flotation circuits at Millsell, Doornbosch, Tweefontein, Mooinooi and Lesedi
Revenue (by products)Revenue earned on Ruthenium, Iridium, Nickel and Copper
ROMRun of mine
SDOSylvania dump operations
SHESafety, health and environmental
Silly SeasonThe 'Silly Season' campaign is historically where a high number of accidents at mines are reported during the last Quarter of the calendar year. This period is often challenging from a health and safety perspective and is commonly known as 'Silly Season/ Critical Season'
SLPSocial and Labour Plan
SylvaniaSylvania Platinum Limited, a company incorporated in Bermuda
Sylvania MetalsSylvania Metals (Pty) Limited
TCFDTask Force on Climate-Related Financial Disclosures
tCO2eTons of carbon dioxide equivalent
Thaba JVThaba Joint Venture
TRIFRTotal recordable injury frequency rate
TSFTailings storage facility
UNSDGsUnited Nations Sustainability Development Goals
USDUnited States Dollar
WULAWater Use Licence Application
UKUnited Kingdom of Great Britain and Northern Ireland
VATValue Added Tax
ZARSouth African Rand
Zero HarmThe South African mining industry is committed to the shared aspiration of achieving the goal of Zero Harm, which aims to ensure that mineworkers return home from work healthy and unharmed every day

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note