Dubhe-1 Update
Dubhe-1 lateral drilled to 5,200 ft in target reservoir, exceeding pre-drill expectations; Ahpun resources increased to 589 million barrels.
vs expectations: ahead
- Dubhe-1 lateral measured depth 15,800 ft
- SMD-B lateral length c.5,200 ft
- Pre-drill targeted lateral length 3,000-4,000 ft
- Ahpun area updated best estimate resources 589 million barrels of marketable liquids
- Resource increase from previous estimate 228 million barrels (c.63%)
- SMD-C horizon gross thickness 172 ft (increased from 60 ft)
Select text to share a quote on X · sign in to keep highlights & notes in your PANR notes
Pantheon Resources plc (AIM:PANR, OTCQX: PTHRF) ("Pantheon" or the "Company"), the oil and gas company developing the Kodiak and Ahpun oil fields near pipeline and transportation infrastructure on Alaska's North Slope, today announces the successful drilling of the Dubhe-1 appraisal well lateral. The lateral was successfully landed in the topset horizon (SMD-B), the primary target confirmed in the Dubhe-1 pilot hole.
Key Points
- The Dubhe-1 horizontal lateral was successfully drilled and logged to a total measured depth ("MD") of 15,800 ft, of which c.5,200 ft was entirely within the SMD-B target reservoir. This exceeded pre-drill targeted length of 3000-4000 ft
- Analysis of the quality of the logged pay throughout the horizontal lateral in the primary target SMD-B confirmed the reservoir remained consistent with the pilot hole results
- Agreements are in place with all key suppliers for the hydraulic stimulation of the lateral ahead of flow tests to gather detailed production data for development planning and refining the production well type curve
- The updated Company best estimate resources for the Ahpun area, based on Dubhe-1 appraisal well results to date is 589 million barrels of marketable liquids - representing an increase of 228 million barrels (c.63%) from previously certified resource estimates
Dubhe-1 Well: Horizontal Lateral Outcome
The second phase of the Dubhe-1 well programme consisted of plugging back the pilot hole and drilling the lateral sidetrack into the primary SMD-B zone, entering the target horizon approximately 550 ft northeast of the pilot hole. The well achieved a total measured depth of 15,800 ft with c.5,200 ft within the SMD-B reservoir, exceeding pre-drill expectations. The production test lateral was planned for 3,000 - 4,000 ft and optimisation of the trajectory based on the pilot hole results, combined with good drilling performance, achieved this upside outcome.
The additional shallow hydrocarbon bearing zones were encountered again in the sidetrack. All intervals were logged with a full suite of Logging While Drilling ("LWD") tools and Volatiles Analysis Service ("VAS") of both sealed and unsealed cuttings samples.
Company Resource Update
Building upon the previously released Independent Expert Reports from Cawley, Gillespie & Associates ("CG&A") and Lee Keeling & Associates ("LKA"), the Company has updated estimated resources across the Ahpun area which now totals 589 million barrels of marketable liquids with the inclusion of Topset SMD-B infill targets (where the reservoir thickness exceeds 450 ft), SMD-C and the Slope Fan System. A detailed breakdown is provided below.
| Source (Support) | SPE PRMS Classification | Best Estimate Oil | Best Estimate Natural Gas Liquids (NGL) | Total Marketable Liquids (ANS Crude) |
|---|---|---|---|---|
| (million barrels) | (million barrels) | (million barrels) | ||
| Ahpun - Topset (SMB-B) (CG&A - June 24) | 2C | 152 | 130 | 282 |
| Ahpun - Topset (SMD-B) infill opportunities* | 2C | 22 | 18 | 40 |
| Ahpun - Slope Fan System* | 2C | 84 | 42 | 126 |
| Ahpun - SMD-C (1) | 2C | 41 | 21 | 62 |
| Ahpun - Alkaid (LKA - April 24) | 2C | 43 | 36 | 79 |
| Total Discovered Resources | 2C | 342 | 247 | 589 |
*Company estimates
- Following analysis of well logs and other data collected in the Dubhe-1 well, the interpreted gross thickness of the SMD-C horizon has been increased from 60ft to 172ft.
Forward Plans
The Company is analysing data from both the pilot and the lateral to optimise the design and operation of hydraulic stimulation for the lateral and subsequent flowback. This will be based on a modern completion design and practices currently utilised in the Permian Basin. The Company competitively tendered several service providers for each of these operations and now has contracts and Master Service Agreements in place for all key services, including new suppliers to the North Slope of Alaska bringing expertise from more mature unconventional basins, expected to offer much higher efficiency at lower cost. Preparations are presently underway to initiate operations and more detailed guidance and associated timing will be announced when available. Whilst results to date are extremely encouraging, the outcome of flow testing will determine any path to commerciality.
Erich Krumanocker, Chief Development Officer, said:
"We are delighted to announce the Dubhe-1 horizontal lateral as a success, landing the well in the target reservoir and exceeding our expectations for the length. We are looking forward to progressing with the completion and subsequent flow testing of this well."
Reminder of upcoming Webinar - Tuesday 9 September, 2025 at 5.30pm British Summer Time
Max Easley (CEO), David Hobbs (Chairman), Tralisa Maraj (CFO) and Erich Krumanocker (Chief Development Officer) will host a live investor update presentation via Investor Meet Company on 09 Sept 2025, 17:30 BST.
The presentation will provide an update on the Dubhe-1 well, forward plans for completion and flow testing, as well as discussing the implications of a successful test on development planning of the Ahpun field.
The presentation is open to all existing and potential shareholders. Questions can be submitted pre-event via your Investor Meet Company dashboard up until 08 Sept 2025, 09:00 BST, or at any time during the live presentation. Investors can sign up to Investor Meet Company for free and add to meet PANTHEON RESOURCES PLC via:
Management has prepared this announcement in accordance with definitions and guidelines set forth in the 2018 Petroleum Resource Management System (PRMS) approved by the Society of Petroleum Engineers (SPE).
Glossary
For Contingent Resources, the general cumulative terms low/best/high estimates are used to estimate the resulting 1C/2C/3C quantities, respectively. The terms C1, C2, and C3 are defined for incremental quantities of Contingent Resources:
- C1: Denotes low estimate of Contingent Resources. C1 is equal to 1C.
- C2: Denotes Contingent Resources of same technical confidence as Probable, but not commercially matured to Reserves.
- C3: Denotes Contingent Resources of same technical confidence as Possible, but not commercially matured to Reserves.
When the range of uncertainty is represented by a probability distribution, a low, best, and high estimate shall be provided such that:
- There should be at least a 90% probability (P90) that the quantities actually recovered will equal or exceed the low estimate.
- There should be at least a 50% probability (P50) that the quantities actually recovered will equal or exceed the best estimate.
- There should be at least a 10% probability (P10) that the quantities actually recovered will equal or exceed the high estimate.
| mmbo | Million barrels of crude oil |
| O il in Place | is a specialist term in petroleum geology that refers to the total oil content of an oil reservoir |
| S PE | S ociety of Petroleum Engineers |
Cautionary Statement: Certain statements and estimates contained in this announcement carry an associated risk of accuracy as such statements and estimates are based upon information available at the time of making such statements. Actual results could differ materially from expectations set out in such statements. Among other factors, this could be as a result of changes in economic, market, geological and political factors, the success of future drilling and geological success, geological interpretation, regulatory risk, environmental factors, political/government actions, fluctuations in the price of oil and exchange rates, and business and operational risk management.
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.