Mbe Project Delivers Further Gold Mineralisation
Mbe gold project drilling returns 30 gold mineralised intersections including 23.10m at 0.71g/t Au.
- MBDD005 best intersection 23.10m at 0.71g/t Au from 76.00m
- MBDD005 higher grade zone 7.20m at 1.02g/t Au
- MBDD006 best intersection 13.80m at 0.61g/t Au from 103.10m
- Phase 1 drilling complete 44% of 2,895.10m drilled
- Total gold mineralised intersections to date 94 intersections
Select text to share a quote on X · sign in to keep highlights & notes in your ORR notes
Oriole Resources PLC (AIM: ORR), the AIM quoted gold exploration company focused on West and Central Africa, is pleased to provide an update on its 90%[1] owned Mbe orogenic gold project ('Mbe' or the 'Project') in Cameroon.
Highlights
- The maiden ('Phase 1') drilling programme at MB01-S is approximately 44% complete for a total of 2,895.10 metres ('m') drilled, with nine holes drilled (MBDD001-09) and a tenth hole (MBDD010) in progress.
- Results from holes MBDD005 and MBDD006, over 609.10m of drilling, have returned a further 30 gold ('Au') mineralised intersections (using a 0.20 gramme per tonne ('g/t') Au lower cut-off grade), including (see Figure 1 and Table 1):
MBDD005:
o 23.10m at 0.71g/t Au from 76.00m, including 7.20m at 1.02g/t Au and 2.00m at 2.48g/t Au
o 5.60m at 1.03g/t Au from 7.50m
o 1.00m at 1.87g/t Au from 38.30m
MBDD006:
o 13.80m at 0.61g/t Au from 103.10m, including 3.40m at 1.17g/t Au and 2.10m at 1.06g/t Au
o 7.30m at 0.51g/t Au from 8.30m, including 1.90m at 1.18g/t Au
o 1.00m at 1.12g/t Au from 60.90m
o 1.00m at 1.64g/t Au from 71.50m
- The system is confirmed to a depth of approximately 150m from surface on this drill fence line. The results continue to demonstrate wide zones of bulk-tonnage gold mineralisation, which should be open pit mineable, related to sulphide-rich quartz veins, veinlets and breccias that have developed predominantly within quartz-feldspar porphyry ('QFP') units.
- Samples from holes MBDD007 and MBDD008 are already on their way to Bureau Veritas in Côte d'Ivoire for fire assay analysis. Results for these drill holes are expected to be reported later this quarter.
- The programme is currently scheduled for completion in Q3-2025, and the Company anticipates publishing a maiden, pit-contained Mineral Resource Estimate ('MRE') in H2-2025.
Chief Executive Officer of Oriole Resources, Martin Rosser, said: "The latest Mbe drilling results continue to return significant widths of gold mineralisation. As we continue to build the 3-D picture of the geology and gold mineralisation, it supports our opinion that there could be a substantial volume of material delineated that is potentially amenable to a large-scale open pit mining method. As we approach the halfway mark in the planned programme's metreage, we very much look forward to reporting the next set of results."
Figure 1. Interpretative cross section for fence line N872682 at MB01-S, with a selected mineralised intervals from holes MBDD003 and MBDD004 (green labels; previously reported, announcement dated 24 March 2025) and MBDD005 and MBDD006 (blue labels; reported today). The fence line is located approximately 30m to the north of trench MBT007, the results for which are shown in red along the surface trace (announcement dated 30 September 2024).
Mbe, with a licence area of 312 square kilometres ('km2'), is an orogenic gold project located within the broader 2,266km2 'Eastern CLP' package of five contiguous gold focused exploration licences in the Adamawa Region of central Cameroon. Since 2022, the Company's systematic exploration programmes have identified a 3 kilometre ('km') long, NE trending prospect, named MB01 (or the 'Prospect'), which sits within a wider 12.5km long zone of gold-in-soil anomalism that trends ENE.
At MB01, increased dilation at the sites of structural intersections (steeply dipping NNE and NNW trending shear structures) is believed to have resulted in enhanced levels of gold deposition at the northern target, MB01-N, and MB01-S, the southern target. Gold mineralisation at these targets comprises high grade, sulphide-rich quartz veins, veinlets and breccias that occur within, or at the contact with, an intensely altered QFP unit and the orthogneiss host rock, which itself is mineralised and creates wide envelopes of pervasive, lower grade gold mineralisation.
After highly encouraging results from infill soil sampling, rock-chip sampling, and trench sampling, a fully funded maiden drilling programme commenced at the MB01-S target for a planned 6,590m in 24 holes. BCM International ('BCM') has acquired an initial 10% interest in Mbe and is earning up to a further 40% interest by spending up to US$4 million on exploration.
To date, a total of 2,895.10m has been drilled, with nine holes completed (MBDD001-09) and a tenth hole (MBDD010) in progress. The Company today reports results for holes MBDD005 and MBDD006 that have delivered more than 30 gold mineralised intersections (Table 1, Figure 2), such as 23.10m at 0.71g/t Au from 76.00m, including 7.20m at 1.02g/t Au and 2.00m at 2.48g/t Au (MBDD005) and 13.80m at 0.61g/t Au from 103.10m, including 3.40m at 1.17g/t Au and 1.20m at 1.06g/t Au (MBDD006).
This is in addition to the 64 gold-bearing intersections returned from the first four holes, MBDD001-04, which returned 29.75m at 0.88g/t Au, including 17.30m at 1.35g/t Au and 26.30m at 0.65g/t Au, including 10.90m at 1.08g/t Au (MBDD002) and 8.00m at 1.00g/t Au, and 4.24m at 8.12g/t Au, including 1.72m at 19.08g/t Au (MBDD003) (Announcement dated 24 March 2025). A review of the QAQC samples has confirmed that the data falls within acceptable limits of error.
Figure 2. Plan for Phase 1 drilling at MB01-S with a selection of best results to date.
Table 1. Calculated intersections from Phase 1 holes MBDD005 to MBDD006, using a 0.20g/t Au lower cut-off grade. Results greater than 1.00g/t Au are in bold.
| Hole ID | From (m) | To (m) | Grade (Au g/t) | Intersection* |
|---|---|---|---|---|
| MBDD005 | 7.50 | 13.10 | 1.03 | 5.60m at 1.03g/t Au |
| and | 36.40 | 43.20 | 0.53 | 6.80m at 0.53g/t Au |
| incl uding | 38.30 | 39.30 | 1.87 | 1.00m at 1.87g/t Au |
| and | 53.40 | 54.40 | 0.26 | 1.00m at 0.26g/t Au |
| and | 59.50 | 61.60 | 0.30 | 2.10m at 0.30g/t Au |
| and | 63.90 | 66.10 | 0.31 | 2.20m at 0.31g/t Au |
| and | 69.10 | 72.10 | 0.38 | 3.00m at 0.38g/t Au |
| and | 76.00 | 99.10 | 0.71 | 23.10m at 0.71g/t Au |
| including | 84.90 | 92.10 | 1.02 | 7.20m at 1.02g/t Au |
| including | 97.10 | 99.10 | 2.48 | 2.00m at 2.48g/t Au |
| and | 110.60 | 115.50 | 0.42 | 4.90m at 0.42g/t Au |
| and | 127.20 | 128.30 | 0.31 | 1.10m at 0.31g/t Au |
| and | 140.30 | 142.20 | 0.34 | 1.90m at 0.34g/t Au |
| and | 144.80 | 149.00 | 0.43 | 4.20m at 0.43g/t Au |
| and | 151.00 | 152.00 | 0.65 | 1.00m at 0.65g/t Au |
| a nd | 171.15 | 172.90 | 0.39 | 1.75m at 0.39g/t Au |
| and | 324.30 | 325.60 | 1.04 | 1.30m at 1.04g/t Au |
| MBDD006 | 4.70 | 5.80 | 0.29 | 1.10m at 0.29g/t Au |
| and | 8.30 | 15.60 | 0.51 | 7.30m at 0.51g/t Au |
| including | 10.90 | 12.80 | 1.18 | 1.90m at 1.18g/t Au |
| and | 19.40 | 21.60 | 0.39 | 2.20m at 0.39g/t Au |
| and | 32.50 | 36.70 | 0.42 | 4.20m at 0.42g/t Au |
| and | 41.00 | 42.00 | 0.22 | 1.00m at 0.22g/t Au |
| and | 60.90 | 64.10 | 0.44 | 3.20m at 0.44g/t Au |
| including | 60.90 | 61.90 | 1.12 | 1.00m at 1.12g/t Au |
| and | 69.50 | 72.50 | 0.68 | 3.00m at 0.68g/t Au |
| including | 71.50 | 72.50 | 1.64 | 1.00m at 1.64g/t Au |
| and | 76.40 | 79.90 | 0.24 | 3.50m at 0.24g/t Au |
| and | 81.90 | 82.90 | 0.28 | 1.00m at 0.28g/t Au |
| and | 103.10 | 116.90 | 0.61 | 13.80m at 0.61g/t Au |
| including | 107.40 | 110.80 | 1.17 | 3.40m at 1.17g/t Au |
| including | 114.80 | 116.90 | 1.06 | 2.10m at 1.06g/t Au |
| and | 131.40 | 132.50 | 0.28 | 1.10m at 0.28g/t Au |
| and | 138.50 | 139.60 | 0.33 | 1.10m at 0.33g/t Au |
| and | 198.70 | 199.80 | 0.80 | 1.10m at 0.80g/t Au |
| and | 225.00 | 226.00 | 0.30 | 1.00m at 0.30g/t Au |
| and | 233.10 | 234.20 | 0.52 | 1.10m at 0.52g/t Au |
| and | 236.00 | 237.00 | 0.36 | 1.00m at 0.36g/t Au |
* Intervals greater than 1.00m, calculated using a 0.20g/t Au lower cut-off grade and no more than 35% internal dilution. True widths are not currently known.
Late mafic dykes on this drill fence line appear to have disrupted the mineralisation at approximately 150m below surface. However, their impact seems to be a localised thus far, with limited evidence of such dykes on the southern fence line, N872482.
Samples from holes MBDD007 and MBD008 have been prepared and are on their way to Bureau Veritas in Côte d'Ivoire for fire analysis. Results for both drill holes are expected to be reported later this quarter.
The programme is currently scheduled for completion in Q3-2025, and the Company anticipates publishing a maiden, pit-contained MRE in H2-2025, which will be estimated in accordance with the Australasian Joint Ore Reserve Committee ('JORC') 2012 code.
| Oriole Resources Plc | Tel: +44 (0)23 8065 1649 |
| Martin Rosser / Bob Smeeton / Claire Bay | |
| BlytheRay (PR Contact) | Tel: +44 (0)20 7138 3204 |
| Tim Blythe / Megan Ray | |
| Grant Thornton UK LLP | Tel: +44 (0)20 7383 5100 |
| Samantha Harrison / Ciara Donnelly / Elliot Peters | |
| SP Angel Corporate Finance LLP Ewan Leggat / Jen Clarke | Tel: +44 (0)20 3470 0470 |
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.