Quarterly Report period ending March 2025

In brief · summary, not quotable

Completed Cangai Copper Mine divestment and acquired Harts Range Project; identified 46 exploration targets with rare earth potential.

  • Total cash and liquid investments $1.395 million
  • Cash $686k
  • ASX: IMI stock value ~$520k
  • ASX: IPT stock value ~$189k
  • Priority exploration targets identified at Harts Range 46
  • High-priority targets at Harts Range 18
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your NFM notes

New Frontier Minerals Ltd (LSE and ASX: NFM) is pleased to report its quarterly activities report for the period ending 31 March 2025.

During the quarter, the Company prioritised its portfolio optimisation strategy by completing the divestment of the Cangai Copper Mine Project to Infinity Mining Limited (ASX: IMI) and securing the highly promising Harts Range Project in the Northern Territory.

QUARTERLY HIGHLIGHTS

Exploration

  • New Frontier Minerals completed a helicopter-borne radiometric and magnetic survey identifying 46 priority exploration targets, including 18 high-priority zones with potential niobium and heavy rare earth (HRE) mineralisation
  • Rock chip analysis at Cusp and Bobs Prospects revealed outstanding concentrations of Heavy Rare Earth Elements (HREEs), with Dysprosium and Terbium contributing significantly to the mineral basket
  • These HREEs are crucial for advanced technologies like EVs, wind turbines, medical devices and military systems, presenting NFM as a potentially key player in diversifying global supply chains outside China
  • Formalised a Memorandum of Understanding (MOU) with Austral Resources to process copper ore from NFM's Big One Deposit via Austral's Mt Kelly facility
  • The alliance targets joint value creation by accelerating trial mining, regulatory approvals, and advancing exploration within the NWQ Copper Project

Next steps

  • Deploy a detailed exploration campaign at Harts Range in Q2 2025, with targeted mapping and sampling to refine drilling priorities
  • Advance regulatory, technical, and drilling activities under the Austral partnership to fast-track copper production

Corporate

  • Completed the sale of the Broken Hill East Project to Impact Minerals, unlocking $275,000 in shares and $102,000 in security deposits and enabling reinvestment into key ventures, including Harts Range and NWQ Copper Projects
  • NFM reiterates its commitment to finding a development partner for the Mkushi Copper Project in Zambia, which holds substantial exploration and operational promise
  • Total cash and liquid investments of $1.395 million, comprised of $686k cash, ASX: IMI stock currently valued at ~$520k (40 million shares x $0.013 per share as at 31/03/2025) along with 20 million unlisted options (expiry 30/11/2029, strike $0.07) and ASX: IPT stock valued at ~$189k (37,774,040 shares x $0.005 per share as at 31/03/2025)

HARTS RANGE PROJECT

New Frontier Minerals Ltd (ASX: NFM) made substantial progress at the Harts Range Heavy Rare Earths, Uranium, and Niobium Project, located 140 km northeast of Alice Springs in the Northern Territory, over the January to March 2025 quarter. The Company's strategic exploration activities have bolstered its confidence in the project's significant mineralisation potential.

Helicopter-Borne Geophysical Survey

New Frontier recently completed a comprehensive helicopter-borne radiometric and magnetic survey across the Harts Range Project. The survey was a pivotal step in accelerating the exploration of the tenements EL32513 and EL32046. With the primary aim of identifying extensions of known uranium, niobium, and heavy rare earth (HRE) mineralisation, the survey provided critical data to enhance the prioritisation of future drilling and ground truthing activities.

The analysis highlighted numerous distinct radiometric anomalies and confirmed the structural alignment of mineralised pegmatites at key locations, including the Cusp and Bobs Prospects1. Enhanced magnetic imagery revealed that these prospects align along an ENE-trending structure, suggesting potential mineralised extensions in both the northern and southern regions of the project area. The survey data underscored the significant exploration potential of the Harts Range Project, setting the stage for more detailed investigations.

On 4 March 2025, the Company announced the completion of a detailed geophysical interpretation by Southern Geoscience Consultants. This study built upon the initial survey by identifying 46 priority exploration targets across the project area. Specifically, the evaluation pinpointed 18 high-priority, 16 medium-priority, and 12 lower-priority targets for follow-up exploration2. A 1:10,000 scale structural interpretation was also achieved, marking a localised radiometric and magnetic anomaly at both the Cusp and Bobs Prospects. The data has greatly assisted in target drillhole generation.

Rare Earth Distribution Analysis

Rare earth distribution analysis formed a crucial component of ongoing exploration activities at the Harts Range Project. The analysis focused on rock chip samples collected from pegmatite outcrops in the Cusp and Bobs Prospects. Results revealed exceptionally high concentrations of heavy rare earth elements (HREEs), with Dysprosium Oxide (Dy2O3) and Terbium Oxide (Tb4O7) identified as dominant contributors to the total rare earth oxide (TREO) composition.

At the Cusp Prospect, analysis of 13 mineralised rock chip samples revealed that over 92% of the rare earth oxide basket was composed of heavy rare earths. Dysprosium and Terbium combined accounted for 13.63% of the TREO basket, with Dysprosium Oxide (11.76%) and Terbium Oxide (1.87%) demonstrating the significant value of this deposit4.

The Bobs Prospect showed even higher HREE concentrations in its 12 analysed samples, with HREEs making up more than 97% of the rare earth basket. Yttrium Oxide (71.06%) was particularly prominent, alongside Dysprosium Oxide (8.75%) and Terbium Oxide (1.18%). The similarities between the Cusp and Bobs Prospects, both structurally and mineralogically, highlighted the potential for further high-value discoveries along their east-west trending structure4.

Strategic Importance of Heavy Rare Earth Elements - Summary

Heavy rare earth elements like Dysprosium and Terbium are crucial for enhancing Neodymium-Iron- Boron magnets, essential in technologies driving electrification and green energy, including electric vehicles and wind turbines. Dysprosium improves thermal stability, while Terbium enhances durability and resistance to demagnetisation8.

Demand for Dysprosium is rising steadily, with projected growth from USD 1,054.3 million in 2025 to USD 1,750.3 million by 2035, driven by its importance in sectors such as automotive, renewable energy, and electronics7.

Global supply challenges stem from China's dominance, which controls 90% of rare earth processing capacity. Limited separation facilities outside China create dependency, pushing industries to seek diversified supply chains9.

The Harts Range Project positions New Frontier Minerals as a key player in addressing these challenges. With significant deposits of heavy rare earths like Dysprosium and Terbium discovered at the Cusp and Bobs Prospects, the project offers the potential to contribute to high-demand markets and reduce reliance on Chinese sources, especially in the defence and green energy sectors.

Next Steps

Building on the robust data produced in the March 2025 quarter, NFM plans to launch a focused exploration campaign in April 2025. This will involve detailed mapping and sampling to validate and refine the geophysical targets in preparation for drill testing.

Figure 1: Uranium squared (U2) image shows extensive regional wide uranium anomalism and known mineralised prosects3

Strategic Alliance Between NFM and Austral Resources

New Frontier announced it had formalised a Memorandum of Understanding (MOU) with Austral Resources Australia Ltd (ASX: AR1) on 21 January 2025 to establish a strategic alliance targeting the Mt Isa copper belt. This collaboration aimed to integrate the two companies' complementary assets, leveraging AR1's copper processing plant and NFM's exploration and mining expertise to unlock significant value.

The combined footprint within the Mt Isa copper belt positioned the alliance as a competitive force amidst industry majors such as BHP, Anglo American, and Glencore. NFM's immediate objective was to supply copper ore from the Big One Deposit (Mineral Resource Estimate of 2.1 Mt at 1.1% Cu - Refer to Appendix B). Additionally, the alliance proposed expanding activity to other satellite prospects within NFM's NWQ Copper Project.

Under the agreement, AR1 would process NFM's copper ore at its Mt Kelly facility, contingent on ore passing metallurgical test requirements. This partnership provided a dual benefit, offering NFM a clear pathway to production while enabling AR1 to secure a new source of copper ore to bolster throughput at its processing plant5.

Alliance Objectives and Framework

The MOU outlined a collaborative framework where both companies committed to working on a best- endeavours basis to capitalise on their shared resources. Key undertakings under this alliance include the following objectives:

  • Formalising a processing agreement for NFM to supply copper ore from the Big One Deposit and, if suitable, other prospective targets within the NWQ Copper Project
  • Conducting metallurgical test work at AR1's Mt Kelly plant to ensure the ore meets processing standards
  • Ensuring profit-sharing terms are equitable, guaranteeing that neither party incurs losses as part of the arrangement
  • The agreement also set out roles for both companies to achieve these objectives. NFM would focus on progressing regulatory, technical, and operational milestones, including:

o Applying for a mining lease over the Big One Deposit, with the process anticipated to take 18- 24 months

o Seeking approval for trial mining and metallurgical testing of the existing copper oxide stockpiles at the Big One Deposit

o Expanding the known resource through further drilling campaigns

o Commencing exploration of satellite prospects within the NWQ Copper Project

AR1's responsibilities included performing the necessary metallurgical testing to confirm ore suitability and supporting NFM through its mining lease application process.

Next Steps

Immediate steps outlined under the alliance included a meeting between NFM and AR1 teams in Queensland to map out a detailed work program. The program's primary focus would encompass advancing the Big One Deposit, initiating metallurgical testing on historical copper stockpiles, and expediting regulatory requirements to fast-track copper production.

The strategic alliance underscored NFM's steady progress in advancing the NWQ Copper Project and marked a pivotal moment in its exploration efforts to position itself as a key player within the Mt Isa copper belt. Both companies expressed a shared commitment to achieving mutually beneficial outcomes through this relationship.

Successful Asset Optimisation Strategy

Sale of Broken Hill East Project

On 10 March 2025, New Frontier announced it had entered into an agreement to sell its wholly owned subsidiary, BHA No. 1 Pty Ltd (BHA), to Impact Minerals Limited (ASX: IPT). BHA holds the non-core Broken Hill East Project. Under the terms of the agreement, NFM transferred all shares in BHA to IPT in exchange for $275,000 worth of IPT shares, calculated on the 14-day VWAP price of $0.0073 per share as at close of market, 7 March 2025. The IPT shares are subject to voluntary escrow arrangements, with one-sixth of the shares released each month over a six-month period.

The agreement also included IPT assuming responsibility for a 2% net smelter return royalty tied to the tenements held by BHA. Security bonds totalling $102,000 have also been returned to the NFM. The sale was finalised on 10 March 2025.

The divestment of the Broken Hill East Project marked NFM's third successful sale of a non-core asset within an 18-month period. This series of strategic transactions allowed the Company to redeploy funds and management focus towards its priority Harts Range and NWQ Copper Projects.

NFM's Board emphasized the importance of its disciplined approach to asset optimisation, which generated significant value from non-core holdings. The Company remains optimistic about securing a development partner for its last remaining non-core asset, the Mkushi Copper Project in Zambia.

The Mkushi Project encompasses an operating copper mine and numerous prospective targets, identified through IP surveys that revealed high chargeability zones overlapping copper soil anomalies. These areas present potential targets for disseminated copper sulphide mineralisation, making the asset particularly attractive for future partnerships.

The Board reiterated its commitment to advancing its core projects while pursuing the appropriate development opportunities for Mkushi to enhance shareholder value.

CORPORATE ACTIVITY

Investor and Shareholder Engagement

On Thursday, 13 March 2025, the Company hosted a live webinar to provide an update on the Company's recent activities.

The webinar was presented by Non-Executive Director Joel Logan and Senior Technical Consultant Kevin Das. During the session, Mr. Logan and Mr. Das provided updates on the Company's Harts Range Project in the Northern Territory and its NWQ Copper Project.

The presentation was followed by a Q&A session, allowing attendees to address specific queries regarding the Company's projects and plans.

Changes to Directors' Interest

  • Gerrard Hall, Director of New Frontier Minerals, was issued 4,000,000 Performance Rights valued at $46,400 on 20 January 2025, adding to his existing shareholdings. No securities were sold, and no contract changes occurred.
  • Eduardo Robaina, Director of New Frontier Minerals, was issued 4,000,000 Performance Rights valued at $46,400 on 20 January 2025, as approved by shareholders at the General Meeting on 28 November 2024. This is his first acquisition of securities, with no disposals or changes to contracts reported.
  • Joel Logan, Director of New Frontier Minerals, was issued 4,000,000 Performance Rights valued at $46,400 on 20 January 2025, as approved by shareholders at the General Meeting on 28 November 2024. This increases his holdings to 1,000,000 ordinary shares and 4,000,000 Performance Rights, with no disposals or contract changes reported.

FINANCIAL UPDATE

Quarterly Cash and Liquid Investments Position

Cash on hand and liquid investments at end of the quarter totalled $1.395 million (including cash on hand of $686,000, and ASX listed shares, as noted below).

The Company holds 40 million Infinity Mining Limited (ASX: IMI) shares which have a total market value of ~$520,000 (40 million shares x $0.013 per share as at 31/03/2025) along with 20 million unlisted options (expiry 30/11/2029, strike $0.07). The shares were released from escrow on 15 April 2025.

The Company also holds 37,774,040 Impact Minerals Limited (ASX:IPT) shares which have a total market value of ~$189,000 (37,774,040 shares x $0.005 per share as at 31/03/2025). The shares are subject to voluntary escrow arrangements, with one-sixth of the shares being released each month over a six-month period.

During the quarter, rehabilitation security bonds totalling $268,000 were refunded to the Company in relation to the Cangai Copper Mine tenements and Broken Hill East tenements now sold.

Rehabilitation security bonds held at the end of the quarter totalled $54,000.

Securities on Issue at Quarter End

Ordinary shares 1,453,735,355

Performance shares 107,750,000

Information Required Under ASX Listing Rules

ASX LR 5.3.5

During the Quarter $63,000 was paid to related parties of the Company relating to non-executive director fees and exploration consulting fees paid to an entity controlled by a related party.

ASX LR 5.3.1

Consulting feesRates and mines departments fees
Cangai2,000-
BHA1,000-
QLD-1,000
Zambia--
Harts Range101,0004,000
104,0005,000

ASX LR 5.3.3

In accordance with ASX Listing Rule 5.3.3, a schedule of Company's tenements can be found at Appendix A.

References

  • ASX Announcement, NFM completes geophysical survey at Harts Range Project, Northern Territory dated 4 February 2025
  • ASX Announcement, Geophysical interpretation identifies 46 HREE-Nb-U priority targets at Harts Range, NT, dated 31 March 2025
  • ASX Announcement, Harts Range Project lights up, with numerous airborne geophysical uranium anomalies across the tenure, dated 4 March 2025
  • ASX Announcement, Heavy Rare Earths Dominant at Harts Range Project, Northern Territory, dated 9 April 2025
  • ASX Announcement, Strategic alliance with Austral Resources to process NFM copper ore, dated 21 January 2025
  • ASX Announcement, Sale of Broken Hill East Project, dated 10 March 2025
  • https://www.futuremarketinsights.com/reports/dysprosiummarket#:~:text=This%20demand%20is%20projected%20to,earth%
  • https://www.arnoldmagnetics.com/wp-content/uploads/2017/10/Important-Role-of-Dysprosium-in-Modern- PermanentMagnets-150906.pdf
  • https://www.reuters.com/world/china-hits-back-us-tariffs-with-rare-earth-export-controls-2025-04-04/

APPENDIX A - TENEMENT SCHEDULE

Table 1: Jackaderry (Cangai), New England Orogen in NSW

Tenement IDOwnership at start of QuarterOwnership at end of QuarterChange during the Quarter
EL8635*100%100%-
EL8625*100%100%-
EL8601*100%100%-

Transfer of the Jackaderry tenements received NSW Ministerial consent on April 11th, 2025 for EL 8635 and EL8625, and April 14th 2025 for EL8601.

Table 2: Broken Hill East, located within a 20km radius of Broken Hill in NSW

Tenement IDOwnership at start of QuarterOwnership at end of QuarterChange during the Quarter
EL8434100%0%100%
EL8435100%0%100%

Table 3: Mt Oxide, Mt Isa region in northwest Queensland

Tenement IDOwnership at start of QuarterOwnership at end of QuarterChange during the Quarter
EPM 26513100%100%-
EPM 26525100%100%-
EPM 26574100%100%-
EPM 26462100%100%-
EPM 27440100%100%-
Table 4: Zambia
Tenement IDOwnership at start of QuarterOwnership at end of QuarterChange during the Quarter
24659-HQ-LEL (Mkushi)100%100%-
Table 5: Harts Range
Tenement IDOwnership at start of QuarterOwnership at end of QuarterChange during the Quarter
EL3251385%85%-
EL3240685%85%-
EL34022100%100%-
APPENDIX B: RESOURCE TONNAGES - BIG ONE DEPOSIT
Resource TypeOre TypeInferred (Indicated (MMeasured (Copper Gra (%)Silver Grade (gContained Copper (t)Contained Silver (k
Mine DumpsOxidised00.007-1.24.08629
Mine InsituOxidised1.70-1.01.117,0001,870
Mine InsituFresh0.4001.21.44,800560
Sub-Totals2.10.007021,8862,459

Notes:

Cut-off grade 0.45% Cu. Source: CCZ geology team Refer to ASX announcement dated 28 February 2022

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity

New Frontier Minerals Limited

ABNQuarter ended ("current quarter")
52 137 606 47631 March 2025
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
1.Cash flows from operating activities
1.1Receipts from customers
1.2Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs(378)(1,145)
1.3Dividends received (see note 3)
1.4Interest received623
1.5Interest and other costs of finance paid
1.6Income taxes paid
1.7Government grants and tax incentives21204
1.8Other (provide details if material)
1.9Net cash from / (used in) operating activities(351)(918)
2.Cash flows from investing activities
2.1Payments to acquire or for:
(a) entities
(b) tenements(1)(222)
(c) property, plant and equipment(2)(6)
(d) exploration & evaluation(109)(288)
(e) investments
(f) other non-current assets
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
2.2Proceeds from the disposal of:268
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments547
(e) other non-current assets441
2.3Cash flows from loans to other entities
2.4Dividends received (see note 3)
2.5Other (provide details if material)
2.6Net cash from / (used in) investing activities156472
3.Cash flows from financing activities
3.1Proceeds from issues of equity securities (excluding convertible debt securities)
3.2Proceeds from issue of convertible debt securities
3.3Proceeds from exercise of options
3.4Transaction costs related to issues of equity securities or convertible debt securities
3.5Proceeds from borrowings
3.6Repayment of borrowings
3.7Transaction costs related to loans and borrowings
3.8Dividends paid
3.9Other (provide details if material)
3.10Net cash from / (used in) financing activities--
4.Net increase / (decrease) in cash and cash equivalents for the period
4.1Cash and cash equivalents at beginning of period8811,118
4.2Net cash from / (used in) operating activities (item 1.9 above)(351)(918)
4.3Net cash from / (used in) investing activities (item 2.6 above)156472
4.4Net cash from / (used in) financing activities (item 3.10 above)--
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
4.5Effect of movement in exchange rates on cash held-14
4.6Cash and cash equivalents at end of period686686
5.Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accountsCurrent quarter $A'000Previous quarter $A'000
5.1Bank balances536481
5.2Call deposits150400
5.3Bank overdrafts
5.4Other (provide details)
5.5Cash and cash equivalents at end of quarter (should equal item 4.6 above)686 1881

1 Total cash and liquid investments of $1.395 million, comprised of $686k cash, ASX: IMI stock valued at ~$520,000 (40 million shares x $0.013 per share as at 31/03/2025) along with 20 million unlisted options (expiry 30/11/2029, strike $0.07) and ASX: IPT stock valued at ~$189,000 (37,774,040 shares x $0.005 per share as at 31/03/2025)

ABNQuarter ended ("current quarter")
52 137 606 47631 March 2025
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
6.Payments to related parties of the entity and their associatesCurrent quarter $A'000
6.1Aggregate amount of payments to related parties and their associates included in item 163 1
6.2Aggregate amount of payments to related parties and their associates included in item 20

1 Comprises director's fees, consulting fees, and expense reimbursements for the quarter.

ABNQuarter ended ("current quarter")
52 137 606 47631 March 2025
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
7.Financing facilities Note: the term "facility' includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity.Total facility amount at quarter end $A'000Amount drawn at quarter end $A'000
7.1Loan facilities
7.2Credit standby arrangements
7.3Other (please specify)
7.4Total financing facilities
7.5Unused financing facilities available at quarter end
8.Estimated cash available for future operating activities$A'000
8.1Net cash from / (used in) operating activities (item 1.9)(351)
8.2(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))(109)
8.3Total relevant outgoings (item 8.1 + item 8.2)(460)
8.4Cash and cash equivalents at quarter end (item 4.6)686
8.5Unused finance facilities available at quarter end (item 7.5)
8.6Total available funding (item 8.4 + item 8.5)686
8.7Estimated quarters of funding available (item 8.6 divided by item 8.3)1.5
8.8If item 8.7 is less than 2 quarters, please provide answers to the following questions:

Answer: Yes.

Answer: The Company works closely with its corporate advisors monitoring cash levels, expenditure commitments and funding opportunities. The Company and its corporate advisors have a proven track record raising funds as and when required. In addition, the Company holds ASX:IMI stock currently valued at ~$520,000 (40 million shares x $0.013 per share as at 31/03/2025) and ASX:IPT stock currently valued at ~$189,000 (37,774,040 shares x $0.005) which can be liquidated over the next two quarters to assist with the Company's funding requirements.

Answer: Yes. Refer to the information provided at 8.8.2.

Compliance statement

2 This statement gives a true and fair view of the matters disclosed.

Date: 30 April 2025

Authorised by: The Board of Directors

(Name of body or officer authorising release - see note 4)

Notes

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note