CatalystWireBeta

Engineering integration package for Hynamics

In brief · summary, not quotable

ITM Power selected for engineering integration package on EDF Hynamics' Tees Green Hydrogen project.

  • NEPTUNE II units 4
  • NEPTUNE II unit capacity 2MW
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your ITM notes

ITM Power is pleased to announce that EDF Renewables UK and Hynamics, a 100% subsidiary of EDF Group, have selected us to execute a plant integration engineering package for Phase 1 of its North East-based Tees Green Hydrogen project.

The project, which is part of the UK's Hydrogen Allocation Round 1 (HAR1), has previously secured funding from the UK government's Net Zero Hydrogen Fund (NZHF)

In July 2024, ITM announced a capacity reservation for four NEPTUNE II units, our full-scope 2MW containerised electrolyser plant, with an unnamed large utility company. Today's announcement is related to the capacity reservation, and the engineering package will cover the integration of four NEPTUNE II units with the balance of plant.

The project will boost local industry and transport by supplying green hydrogen to support decarbonisation efforts and significantly reduce industrial pollution, securing its long-term sustainability.

Dennis Schulz, CEO, said: "It is a privilege to have been selected by EDF Renewables UK and Hynamics, and we look forward to collaborating with them."

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note