CatalystWireBeta

Upgrade of JORC MRE For Tailings Storage Facility

In brief · summary, not quotable

Updated JORC mineral resource for tailings storage facility shows 118,330 ounces of attributable gold, up from 73,895 ounces in 2016 estimate.

  • Attributable contained gold 118,330 ounces (prior 73,895 ounces (2016, like-for-like))
  • Gross contained gold 130,560 ounces
  • Measured mineral resource tonnes 2.34 million tonnes
  • Grade 1.74 g/t gold
  • Goldplat interest in GPL 90.63%
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your GDP notes

Goldplat plc, (AIM:GDP) the AIM listed Mining Services Group, with international gold recovery operations located in South Africa and Ghana, servicing the African and South American Mining Industry, is pleased to announce an updated Mineral Resource estimate, reported in accordance with the JORC Code (2012 Edition), for the tailings storage facility ('TSF') at its 90.63%-owned subsidiary Goldplat Recovery (Pty) Limited ('GPL') in Benoni, South Africa.

The updated estimate, prepared by Sound Mining International SA (Pty) Limited ('Sound Mining') with an effective date of 31 August 2026, is a Measured Mineral Resource of 2.34 million tonnes at 1.74 g/t gold, containing 130,560 ounces of gold, of which 118,330 ounces are attributable to the Company. This compares with the total resource of 81,959 ounces of gold in 1.43 million tonnes at 1.78 g/t (Measured, Indicated and Inferred) announced on 29 January 2016, which it supersedes.

The 2016 total included 0.23 million tonnes containing 8,060 ounces of gold. This 2016 estimate included content in the footwall soils beneath the TSF, which are not included in the 2026 updated estimate. On a like-for-like basis, the 2016 resource for the tailings was 1.20 million tonnes containing 73,895 ounces of gold. The increase reflects principally approximately 1 million tonnes of tailings deposited on the TSF after the drilling that supported the 2016 estimate, up to December 2023. The 2026 drilling covered the full footprint of the TSF, whereas the 2016 estimate relied mainly on drilling around its perimeter; as a result, the whole of the updated resource is classified as Measured.

Mineral Resource estimate (effective date 31 August 2026)

CategoryGross tonnes (Mt)Gross grade (g/t Au)Gross contained gold (koz)Net attributable tonnes (Mt)Net attributable grade (g/t Au)Net attributable contained gold (koz)Operator
Measured2.341.74130.562.121.74118.33GPL
Indicated––––––
Inferred––––––
Total2.341.74130.562.121.74118.33GPL

Notes:

  • Reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition (the JORC Code). Effective date 31 August 2026.
  • Reported in situ on a dry basis, with no cut-off grade, geological losses or metallurgical recovery applied.
  • A uniform bulk density of 1.34 t/m³ has been applied, derived from the 2015 drilling programme. Further density testwork is recommended.
  • The concept study used to assess reasonable prospects for eventual economic extraction indicates a break-even metallurgical recovery of approximately 14%, and preliminary testwork indicates a potential recovery of 20% to 25%. Metallurgical testwork with SGS South Africa (Pty) Limited ('SGS') is in progress to confirm achievable recoveries.
  • No geotechnical assessment has yet been completed, and the deposition site for reprocessed residues has not been confirmed.
  • Gross is 100% of the TSF. Net attributable reflects the Company's 90.63% interest in GPL, the operator.
  • Mineral Resources that are not Ore Reserves do not have demonstrated economic viability.
  • Totals may not sum due to rounding.

The updated resource estimate is for gold only. Silver and uranium oxide, which were included in the 2016 estimate, have not been re-estimated, and the 2016 estimates for those minerals should no longer be relied upon. The footwall soils beneath the TSF, which formed part of the 2016 estimate, were not modelled and are not included in the updated estimate.

The full resource report is available on the Company's website at www.goldplat.com/downloads/2026.

GPL deposited tailings onto the TSF from January 2003 with the intention to eventually reprocess the material. Since the 2016 estimate, GPL continued to deposit material on the facility until December 2023, when it moved the deposition to a new TSF. The 2026 estimate is based on a new auger drilling programme of 25 vertical holes totalling 522 metres (average depth 21 metres), sampled at 1.5 metre intervals over the full depth of the facility. No new bulk density measurements were taken; the bulk density of 1.34 t/m³ from the 2015 drilling programme has been applied.

Next steps

A concept study for the reclamation and processing of the TSF is being conducted by LogiProc (Pty) Ltd, an EPCM contractor in South Africa. Once the concept study is approved by management, a feasibility and economic assessment will follow. The ability to process the TSF and realise its potential value therefore remains subject to significant technical, regulatory, funding and execution uncertainties.

The Company continues to evaluate processing routes for the TSF, both through facilities on its own premises and through third-party infrastructure, including the potential to use the servitudes, plant and deposition capacity of DRDGOLD.

Werner Klingenberg, CEO of Goldplat commented: “The upgraded JORC Resource is an important step in unlocking the value of the TSF, although it will take time to ensure operational readiness. Alongside the resource upgrade, we are working with independent third parties to establish the recoverability of the gold contained in the TSF, whilst the economic route to recovery is developed. The next step is to provide clarity on recoverability, and then to settle the processing route and timelines.”

Glossary

TermDefinition
Authe chemical symbol for gold
auger drillinga drilling method using a rotating spiral auger to recover samples from unconsolidated material such as tailings
bulk densitythe dry mass of material per unit volume, including pore spaces, used to convert volume to tonnes; expressed in t/m³
Competent Persona minerals industry professional who is a member or fellow of a recognised professional organisation, with at least five years of experience relevant to the style of mineralisation, type of deposit and activity concerned, as defined in the JORC Code
concept studyan early-stage, high-level technical and economic study of potential reclamation and processing options, undertaken at a lower level of accuracy than a pre-feasibility or feasibility study
cut-off gradethe lowest grade at which mineralised material is considered economic to recover; no cut-off grade has been applied to the TSF Mineral Resource
dry basistonnages reported excluding the weight of contained moisture
EPCMengineering, procurement and construction management
feasibility studya comprehensive technical and economic study of a selected development option, including detailed assessment of the applicable Modifying Factors, sufficient to support a decision to proceed with development
g/tgrams per tonne
geological lossesan allowance deducted from a Mineral Resource estimate for material that may not be recoverable for geological reasons; none has been applied to the TSF Mineral Resource
Gross100% of the Mineral Resource, irrespective of the Company's interest
in situin place, before any reclamation or processing
Indicated Mineral Resourcethat part of a Mineral Resource for which quantity, grade, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of economic viability
Inferred Mineral Resourcethat part of a Mineral Resource for which quantity and grade are estimated on the basis of limited geological evidence and sampling; it has a lower level of confidence than an Indicated Mineral Resource and must not be converted to an Ore Reserve
JORC Codethe Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition
kozthousand troy ounces
Measured Mineral Resourcethat part of a Mineral Resource for which quantity, grade, densities, shape and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of economic viability
metallurgical recoverythe proportion of the contained metal recovered by processing, expressed as a percentage
Mineral Resourcea concentration or occurrence of material of economic interest in such form, grade, quality and quantity that there are reasonable prospects for eventual economic extraction
Modifying Factorsconsiderations used to convert Mineral Resources to Ore Reserves, including mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors
Mtmillion tonnes
Net attributablethe portion of the Mineral Resource attributable to the Company's economic interest
operatorthe entity responsible for managing the asset; for the TSF, GPL
Ore Reservethe economically mineable part of a Measured or Indicated Mineral Resource, demonstrated by at least a pre-feasibility study that applies the Modifying Factors
oztroy ounce, equal to 31.10348 grams
Pr.Sci.Nat.Professional Natural Scientist, a professional registration category of SACNASP
qualified persona person meeting the requirements of the AIM Note for Mining and Oil & Gas Companies to review and approve technical information released by an AIM company
reasonable prospects for eventual economic extractionthe JORC Code requirement that, for material to be reported as a Mineral Resource, the Competent Person has considered the likely technical and economic conditions for its eventual extraction
reclamationthe removal of deposited tailings from a facility, for example by hydraulic methods, for reprocessing
SACNASPSouth African Council for Natural Scientific Professions
SANASSouth African National Accreditation System
servitudea registered right over land owned by another party, for example for the routing of a pipeline
t/m³tonnes per cubic metre
tailingsthe fine-grained material remaining after ore or other feed material has been processed
testworklaboratory tests carried out to determine the metallurgical characteristics of a material
TSFtailings storage facility; the GPL TSF is referred to in the Sound Mining report as the Rooidam stockdam
uranium oxidetriuranium octoxide (U ₃ O ₈ )

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note