Outstanding shallow gold results at Curley's
Shallow gold assays returned 7m intersections averaging 2.32g/t and 1.05g/t at Curley's; follow-up drilling programme starts immediately.
- Best single assay 4.32g/t gold
- 7m intersection CAC010 2.32g/t average
- 7m intersection CAC011 1.05g/t average
- Phase II drilling completed 30 holes, 1,406m
- Follow-up programme approximately 55 holes
Select text to share a quote on X · sign in to keep highlights & notes in your FORG notes
Two holes return 7m gold intersections at average of 2.32g/t and 1.05g/t with individual assays up to 4.32g/t; c. 55-hole follow-up programme starts this weekend
Forgent plc, the Australian-focused critical and precious minerals explorer, is delighted to announce very encouraging gold assays at shallow depth from multiple neighbouring drill holes at central Curley’s prospect within its Peak Hill project in Western Australia, where 30 holes totalling 1,406m were completed. As a result, Forgent will initiate immediate development drilling at Central Curleys.
Highlights
Gold assays from 5 metres downhole across multiple neighbouring holes strengthen considerably the central Curley’s exploration opportunity. Led by primary one-metre gold assays of up to 4.32g/t in CAC010 and 4.10g/t in CAC003, with 3.71g/t, 1.88g/t and 1.49g/t in other neighbouring holes.
Strong grades are complemented by multi-metre gold bearing intervals including two seven metre gold bearing intervals from two drill holes:
- 7m averaging 2.32g/t gold from 26m in CAC010, including 1m at 4.32g/t from 28m, and
- 7m averaging 1.05g/t from 49m at CAC011 including 1m at 3.63g/t from 50m.
Also 1m at 1.49g/t from 7m in CAC009 and 4m averaging 0.63g/t from 26m in CAC002, together with additional gold occurrences recorded in CAC001 and CAC003–CAC008. All 12 closely spaced drill holes at central Curley’s returned gold bearing intervals.
The distribution of the central gold-bearing intersections provides further support for the working interpretation of an approximately east–west mineralised trend with the structure dipping northwards.
The rig returns to site in the coming days to drill approximately 51 development holes at central Curley’s on 20x20m, 40x40m and 80x80m grids and an additional four deeper holes in Northern Curleys, after which drilling at Cathedral will likely continue.
James Parsons, Chief Executive Officer, commented:
“These are outstanding exploration results for central Curley’s and a significant step forward for Forgent’s exploration-led strategy. The combination of gold intercepts at shallow depths occurring in multiple adjacent drill holes substantially strengthens our confidence in the opportunity.
We are responding immediately by expanding, again, Phase II. The next drilling will test the connections between these intersections and investigate how far the mineralisation extends, both along the interpreted trend and at depth.
Our ambition is to turn this exploration momentum into an accelerated route towards a maiden JORC Mineral Resource. The revised programme is designed to establish whether the geological and grade continuity support that next step.”
Curley’s Phase II programme
The Curley’s Phase II drilling covered by this announcement comprises:
| Programme component | Holes | Metres drilled |
|---|---|---|
| Wider-spaced drilling: PKAC043–PKAC060 | 18 | 710m |
| Close-spaced central drilling: CAC001–CAC012 | 12 | 696m |
| Total Curley’s Phase II | 30 | 1,406m |
The close-spaced drilling investigated the central target around the Phase I gold occurrences, while the wider-spaced holes tested the surrounding area. The samples were analysed by Jinning Pty Ltd in Perth.
Central Curley’s results
The central drilling returned gold-bearing intervals in multiple holes. Significant results are summarised below.
| Hole | Total depth | Significant gold results — downhole lengths |
|---|---|---|
| CAC001 | 50m | 3m averaging 0.22g/t from 40m, including 1m at 0.25g/t from 42m. |
| CAC002 | 40m | 4m averaging 0.63g/t from 26m, including 1m at 1.88g/t from 26m. |
| CAC003 | 65m | 1m at up to 4.10g/t from 22m. |
| CAC004 | 65m | 1m at 3.71g/t from 50m; Separate 1m intervals at 0.63g/t from 40m and 0.53g/t from 42m. |
| CAC005 | 65m | 1m at 0.22g/t from 59m, followed by 1m at 0.21g/t from 60m. |
| CAC006 | 50m | 1m at 0.29g/t from 12m. |
| CAC007 | 50m | 1m at 0.37g/t from 7m and a separate 1m at 0.33g/t from 24m. |
| CAC008 | 65m | 1m at 0.55g/t from 29m. |
| CAC009 | 65m | 5m averaging 0.65g/t from 5m, including 1m at 1.49g/t from 7m. |
| CAC010 | 66m | 7m averaging 2.32g/t from 26m, including 1m at 4.32g/t from 28m. Additional 2m at 1.15g/t from 44m and 1m at 1.40g/t from 49m. |
| CAC011 | 65m | 7m averaging 1.05g/t from 49m, including 1m at 3.63g/t from 50m. |
| CAC012 | 50m | 2m averaging 0.88g/t from 26m |
CAC010’s seven-metre intersection comprises individual primary gold grades of 0.86g/t, 0.96g/t, 4.32g/t, 3.84g/t, 1.04g/t, 3.47g/t and 1.83g/t.
Phase I reference results
PKA040 returned 2m at 3.68g/t gold from 50m, including 1m at 5.83g/t from 51m. Separate intervals in PKA040 included 3m at 0.99g/t from 39m and 3m at 0.37g/t from 30m.
CAC004 provides a useful comparison with PKA040, containing gold-bearing samples around 40m and a stronger one-metre interval at 50m.
Wider-spaced and northern drilling
The wider-spaced drilling, including the northern area, did not provide significant gold intersections, and has led to a change in interpretation of mineralisation. The latest working geological interpretation suggests that mineralised structures strike east-west, and dip northwards and therefore are interpreted to deepen beneath the northern area drill holes that were recently drilled. Historical drilling recorded gold-bearing intervals below 100m downhole in the northern part of Curley’s and the Company therefore now believes drill holes were terminated above the projected mineralised horizon. The Company is planning four deeper holes to test that projected mineralised horizon down dip.
Further revision to Phase II and next steps
Phase II continues, with the rig back on site this weekend. The immediate priority is roughly 55 new holes with 51 at central Curley’s (including approximately 30 holes on a 20x20 metre grid, 15 holes on a 40x40 metre grid and 6 holes on an 80x80 metre grid) and 4 at Northern Curley’s. Once the new holes are drilled the rig will likely return to continue the programme at Cathedral.
For further information on Forgent plc, visit the Company’s website www.forgentplc.com or contact:
LinkedIn: linkedin.com/company/forgentplc/
X: X.com/forgentplc
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.