Diamond Drilling Ahead of Pilot-Scale Testwork
Empire Metals Limited has commenced a diamond drilling campaign at the Thomas prospect in Western Australia, comprising approximately 1,000 meters across 10 holes, with assay results anticipated in January 2026. This initiative, fully funded by a recent £7 million capital raise and existing cash reserves of £4 million, aims to gather crucial data for development studies and Mineral Resource Estimate expansion. The company plans to advance metallurgical testwork, initiate pilot-scale testwork, and plan further resource expansion drilling over the next three to six months, building on the Pitfield Project's existing Mineral Resource Estimate of 2.2 billion tonnes at 5.1% TiO₂.
Select text to share a quote on X · sign in to keep highlights & notes in your EEE notes
Empire Metals Limited (LON: EEE, OTCQX: EPMLF), the AIM-quoted and OTCQX-traded resource exploration and development company, is pleased to announce the commencement of a diamond drilling ('DD') campaign at the Thomas prospect within the Pitfield Project in Western Australia. The campaign has been designed to test the high-grade TiO2-rich core of the Thomas Prospect identified from previous drilling and incorporated within the recently announced Mineral Resource Estimate ('MRE').
Highlights
- Diamond drilling campaign to commence at the Thomas Prospect, designed to provide geological, geochemical, metallurgical and geotechnical data for ongoing development studies and MRE expansion.
- Programme comprises approximately 1,000m of drilling across 10 holes, with assay results expected in January 2026.
- Proceeds from the recent £7 million capital raising, together with existing cash reserves of £4 million, fully fund all planned work programmes.
- Workstreams over the next three to six months will focus on advancing metallurgical testwork, initiating pilot-scale testwork, and planning future phases of resource expansion drilling.
- The Pitfield Project hosts one of the largest and highest-grade titanium resources globally, with a Mineral Resource Estimate of 2.2 billion tonnes at 5.1% TiO₂ representing only 20% of the known mineralised footprint.
Shaun Bunn, Managing Director, said: "We are pleased to commence this important diamond drilling campaign at Pitfield, focused on testing the high-grade TiO2-rich central zone of the Thomas Prospect and delivering both metallurgical and geotechnical drillcore samples which are essential for our ongoing project development studies.
"Following the recently announced £7 million capital raising, the Company is well funded and has set its sights on swiftly completing this next round of drilling, accelerating the metallurgical testwork programmes and moving into continuous pilot-scale testwork in early 2026 in order to deliver high-purity TiO2 product samples to potential end users and to support our ongoing engineering and economic studies."
Development Pathway
The coming months will see Empire transition from this targeted drilling campaign into a major scale-up phase. By early 2026, the Company plans to have completed the metallurgical and initiate pilot-scale testwork programmes and to commence the next phase of large-scale drilling to significantly expand the current resource base. Preparations are also underway to advance early engineering, environmental and permitting studies to support a development pathway at Pitfield. Together, these initiatives mark an intensive three-to-six-month period of activity aimed at positioning Empire for pilot-scale production and delivery of titanium dioxide product samples to end users.
Diamond Drilling Programme November-December 2025
The giant titanium discovery at Pitfield is of unprecedented scale and hosts one of the largest and highest-grade titanium resources reported globally, with a MRE totalling 2.2 billion tonnes grading 5.1% TiO₂ for 113 million tonnes of contained TiO₂ (announced 14 October 2025).
The MRE, which covers only the Thomas and Cosgrove deposits (refer Figure 1), includes a weathered zone resource of 1.26 billion tonnes at 5.2% TiO₂ and a significant Indicated Resource of 697 million tonnes at 5.3% TiO₂, predominantly from the Thomas deposit. Titanium mineralisation at Pitfield occurs from surface and displays exceptional grade continuity along strike and down dip. The MRE extends across just 20% of the known mineralised footprint, providing substantial potential for further resource expansion.
Following the announcement on the 30 October 2025 that the Company had raised £7 million by way of a subscription and that the proceeds of the subscription, together with existing cash reserves of £4 million, were to be primarily used to maintain momentum across key workstreams including resource expansion and advanced metallurgical and pilot-scale testwork, the Company has rapidly moved to implement the next phase of the development plan with the commencement of this diamond drilling campaign.
The drill campaign will consist of 10 holes for 1,000m and has been designed to test the high-grade TiO2-rich core of the Thomas Prospect identified from previous drilling and seen within the recently announced MRE.
Figure 1: MRE outlines for Thomas and Cosgrove Deposits with background images of airborne gravity survey results with the location of the AC, RC and DD drillholes
The November-December 2025 drilling campaign is a multi-faceted programme designed to generate:
- Detailed geological and structural information through the high grade in situ weathered zone and into the fresh bedrock that will feed into the geological and resource models and provide greater understanding of the mineral deposit;
- Geochemical analytical results that will add to the geological database and feed into future upgrades of the MRE;
- PQ drill core for metallurgical samples that will be an intrinsic part of the ongoing metallurgical testwork programme; and
- Geotechnical data that will help with current and future mining and engineering studies.
Wallis Drilling Pty Ltd have been awarded the contract to undertake the drilling, which will run from 17 November until 22 December. Geochemical analytical results from this DD programme are expected to be returned in late January.
Figure 2. Location of DD hole collars with respect to previous drilling
Figure 3. Location of DD hole collars with respect to high grade core
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.