CatalystWireBeta

Award of licence at the BNG Contract Area

In brief · summary, not quotable

Caspian Sunrise plc has been awarded an extension to its Yelemes Deep licence at the BNG Contract Area, allowing development work to resume at Deep Well 803 where oil was previously detected. This follows the award of a 25-year production licence for the Airshagyl structure in May 2025, which confirmed reserves of 26 mmbls. The company previously sold two shallow structures in July 2025 for $88 million and has invested over $100 million in the BNG Contract Area since 2008.

Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your CASP notes

The Board of Caspian Sunrise is pleased to update shareholders with news of the award of an extension to the previous Yelemes Deep licence at the BNG Contract Area.

Background

The BNG Contract Area is located 40 km southeast of the world class Tengiz oilfield and comprises both shallow and deep structures.

Shallow structures

In July 2025 two of the shallow structures were sold for a headline cash consideration of $88 million.

The BNG Contract Area contains other potential shallow structures, which the Group may seek to develop in the future.

Deep structures

The two deep structures developed to date are the Airshagyl and Yelemes Deep structures at which since 2008 the Group has invested in excess of $100 million.

The joint estimation licence for the Airshagyl and Yelemes Deep structures expired in August 2024 following which applications for two separate 25 year production licences were submitted.

Airshagyl structure licence

In May 2025 a 25 year production licence was issued for the Airshagyl structure for an initial three year period.

When issuing the Airshagyl production licence the Kazakh State Geology Committee confirmed reserves of 26 mmbls under the former Soviet C1 classification system. These reserves may be increased during the initial three year period based on further drilling.

Following the licence upgrade at the Airshagyl structure work is once again permitted and we are currently seeking to bring Deep Well A6 into commercial production.

Yelemes Deep structure licence

The Kazakh authorities have now extended the previous estimation licence covering the Yelemes Deep structure for a further two years during which development work may resume and a further submission may be made for an independent 25 year production licence.

Accordingly, the Group intends now to resume work at Deep Well 803 where oil was previously detected over a 60 meter interval at depths between 3,360 and 3,420 meters.

Comment

Clive Carver, Chairman said

"The award of the extension to the Yelemes Deep licence represents a major step forward and allows work to resume at the promising Deep Well 803.

This announcement has been posted to:

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note