Unaudited Results for Period Ended 30 June 2025

In brief · summary, not quotable

H1 2025 loss increased to £1.1m; capital raise of £2.2m completed; GAMP PFS shows €924m NPV for Phase 1.

  • Consolidated loss before tax £1,087,801 (prior £976,478)
  • Cash at 30 June 2025 £773,201 (prior £881,349)
  • GAMP Phase 1 NPV8 €924 million
  • GAMP Phase 1 IRR 37%
  • Capital raised SEK 28.1 million (approximately £2.2 million)
  • Exploration assets £17,098,417 (prior £16,023,022)
Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your BEM notes

Beowulf Mining (AIM: BEM; Spotlight: BEO), the mineral exploration and development company, announces its unaudited financial results for the six months ended 30 June 2025 (the "Period").

Activities in the Period

Corporate

  • During the Period, the Company completed a capital raise, raising a total of SEK 28.1 million (approximately £2.2 million) by way of a conditional placing and subscription of new ordinary shares of 5 pence each in the capital of the Company ("New Ordinary Shares"), a rights issue of Swedish Depository Receipts in Sweden, and a retail offer in the UK via the Winterflood Retail Access Platform. The use of proceeds from the capital raise will fund the Company's operations through to the first quarter of 2026.
  • In order to complete the capital raise, a General Meeting was held to provide the Board of Directors with the requisite authorisation and flexibility to increase the Company's share capital, where all resolutions tabled were passed.

Sweden

  • Work, undertaken by wholly owned subsidiary Jokkmokk Iron Mines AB ("Jokkmokk Iron") continued in preparation for both the Pre-Feasibility Study ("PFS"), Environmental Impact Assessment ("EIA") and Environmental Permit application for the Kallak Iron Ore Project ("Kallak").
  • Following completion of the metallurgical test-work during 2024, which demonstrated that Kallak is capable of producing an extremely high-grade, low-impurity concentrate, the engineering and design work for the processing plant along with ancillary site infrastructure was finalised. In addition, waste management, including the design of the tailings storage facility and waste rock dumps, was significantly advanced.
  • The transportation of concentrate from the mine site to the railhead was identified through the public consultation process as a source of significant concern for local stakeholders. Preliminary studies completed by the Company demonstrated that a buried slurry pipeline offered the preferred option; it is safe, reliable, mitigates noise and dust, creates no physical barrier to the movement of local communities and fauna, and also has the lowest operating cost of the range of options reviewed.

Finland

  • On 10 March, Beowulf, through its wholly owned Finnish subsidiary Grafintec Oy ("Grafintec"), announced the results of the PFS for the Graphite Anode Materials Plant ("GAMP").
  • The PFS focused on an initial Phase 1 development producing 25,000 tonnes per year of Coated Spherical Purified Graphite ("CSPG") with the potential to expand further to 75,000 tonnes per year.
  • The study demonstrated extremely positive economics for Phase 1 with a post-tax Net Present Value using a discount rate of 8% ("NPV8") of €924 million and post-tax Internal Rate of Return ("IRR") of 37% over 25 years with an initial capital expenditure of €225 million and pay-back period of 3 years from initial production.
  • Phase 2 offers further economic upside with a post-tax NPV8 of €2.2 billion and post-tax IRR of 38% over 25 years.
  • Further potential upside is identified from the vertical integration of Grafintec's graphite projects and access to government and EU support through grant funding schemes and tax incentives aimed at large industrial investments supporting the transition to a net-zero economy.

Kosovo

  • The Company, through its wholly owned subsidiary Vardar Minerals Limited ("Vardar"), continued low-cost exploration activity on its Shala licences during the Period.
  • Licence applications covering the Mitrovica, Viti East, Viti North and Zvecan licence areas, all of which expired during 2024 in accordance with their terms, and the Shala licence which expired on 25 February 2025, have been submitted to the Independent Commission for Mines and Minerals ("ICMM") in Kosovo, and confirmation of receipt has been received. The Board of ICMM, which is responsible for the award of mineral permits, was disbanded by the Government in October 2023 and, although it has been reinstated, it is working through the backlog of applications and Vardar's permit applications therefore remain pending. The Shala West permit was deemed to have limited prospectivity and was relinquished by the Company during the Period and ahead of its expiry.

Post Period

  • The Company, through Grafintec, secured a site reservation in the City of Kotka for the planned development of the GAMP. The 13-hectare site within the Keltakallio industrial area for battery value chain companies, benefits from exceptional infrastructure, a strategic location, and excellent logistics, with direct access to Finland's largest container port, the Port of Hamina-Kotka - making it an emerging hub for Europe's battery value chain.
  • The Shala East licence in Kosovo expired on 17 August and an application for a licence renewal with a 50% reduction in the area, was submitted to ICMM

Financial

  • The underlying administration expenses of £605,537 in Q2 2025 were higher than Q2 2024 at £520,157. This has increased primarily due to professional fees of £212,613 (Q2 2024: £123,744), directors and staff costs of £100,366 (Q2 2024: £130,234), legal fees of £18,563 (Q2 2024: £7,220), a foreign currency loss of £44,426 (Q2 2024: loss of £17,636) and a decrease in share-based payment expenses of £44,601 (Q2 2024: £116,280).
  • The consolidated loss before tax for H1 2025 increased to £1,087,801 (H1 2024: £976,478). This increase is primarily due to share-based payment expenses of £137,409 (H1 2024: £126,432), professional fees of £377,708 (H1 2024: £293,779), a foreign currency loss of £12,667 (H1 2024: £33,253), realised currency loss of £34,643 (H1 2024: £4,938 gain), combined with finance costs in relation to the bridging loan of £53,945 (H1 2024: £59,147).
  • Consolidated basic and diluted loss per share for the quarter ended 30 June 2025 was 1.25 pence (Q2 2024: loss of 1.37 pence restated for the 50 to 1 share consolidation in Q2 FY24).
  • The Company raised SEK 28.1 million (approximately £2.2 million) before expenses as part of the Capital Raise, of which, the net proceeds have been used to repay the bridging loan principal and interest of SEK 12.4 million (approximately £0.95 million).
  • £773,201 in cash was held at 30 June 2025 (31 December 2024: £881,349).
  • Exploration assets increased 6.7% to £17,098,417 at 30 June 2025 compared to £16,023,022 at 31 December 2024.
  • The cumulative translation losses held in equity decreased by £875,915 in the period ended 30 June 2025 to £1,520,019 (31 December 2024: loss of £2,395,934). Much of the Company's exploration costs are in Swedish Krona which has strengthened against the GB Pound Sterling since 31 December 2024.
  • At 30 June 2025, there were 43,937,185 Swedish Depository Receipts representing 73.65% of the issued share capital of the Company. The remaining issued share capital of the Company is held in the UK.

Ed Bowie, Chief Executive Officer of Beowulf, commented:

"The highlight of the Period was the completion of the GAMP PFS which demonstrated a robust technical project with exceptional economics, positioning Grafintec to be a low-cost, high-margin producer with great value potential. Following the end of the Period, we secured an excellent location for the development of the plant and have begun investigations for the pilot testing and EIA. The identification and reservation of a site for GAMP within a new emerging battery hub marks a key milestone in its development and will serve to help further establish Grafintec's presence in the European and global battery value chains.

"Completing the capital raise during the Period allows us to continue to progress our assets, including Kallak. We have made great strides in, and continue to focus on, cultivating positive local stakeholder engagement. The development of a slurry pipeline is an innovative, reliable, low-impact transport solution that we believe significantly mitigates a number of the main concerns of local stakeholders about the project. Importantly, our initial analysis also suggests that given its very low operating costs, it is also value accretive to the project.

"As a company, we will continue to investigate multiple sources of additional capital to advance our core assets. These include, but are not limited to, institutional and strategic investors, and governmental support from Business Finland and EU entities which offer a range of grants, equity, loans and tax credits. We look forward to providing further updates to the market over the coming months."

BEOWULF MINING PLC

CONDENSED CONSOLIDATED INCOME STATEMENT

FOR THE SIX MONTHS TO 30 JUNE 2025

Notes(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Continuing operations
Administrative expenses(605,537)(520,157)(1,046,451)(917,980)(1,658,763)
Impairment of exploration assets----(72,563)
Operating loss(605,537)(520,157)(1,046,451)(917,980)(1,731,326)
Finance costs3(49,104)(27,271)(53,945)(60,175)(61,334)
Finance income6987759771,6773,404
Grant income----3,561
Fair value loss on listed investment(375)-(1,500)-(3,313)
Loss on disposal of right of use--(3,675)--
Other income416,793-16,793--
Loss before and after taxation(637,525)(546,653)(1,087,801)(976,478)(1,789,008)
Loss attributable to:
Owners of the parent(637,525)(546,628)(1,087,801)(959,438)(1,771,325)
Non-controlling interests-(25)-(17,040)(17,683)
(637,525)(546,653)(1,087,801)(976,478)(1,789,008)

Loss per share attributable to the owners of the parent:

Notes(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Basic and diluted (pence)4(1.25)(1.47)(2.42)(3.18)(5.13)
BEOWULF MINING PLC
CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE LOSS
FOR THE SIX MONTHS TO 30 JUNE 2025
(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Loss for the period/year(637,525)(546,653)(1,087,801)(976,478)(1,789,008)

Other comprehensive loss

Items that may be reclassified subsequently to profit or loss:

Notes(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Exchange losses arising on translation of foreign operations101,69949,808875,915(466,226)(958,163)
Total comprehensive loss(535,826)(496,845)(211,886)(1,442,704)(2,747,171)
Total comprehensive loss attributable to:
Owners of the parent(535,826)(496,850)(211,886)(1,405,670)(2,709,387)
Non-controlling interests-5-(37,034)(37,784)
(535,826)(496,845)(211,886)(1,442,704)(2,747,171)
BEOWULF MINING PLC
CONDENSED COMPANY STATEMENT OF COMPREHENSIVE LOSS
FOR THE SIX MONTHS TO 30 JUNE 2025
Notes(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Continuing operations
Administrative expenses(516,800)(485,521)(915,446)(851,632)(1,897,365)
Operating loss(516,800)(485,521)(915,446)(851,632)(1,897,365)
Finance costs3(48,233)(26,747)(52,086)(59,147)(59,147)
Finance income6847967171,6313,207
Fair value loss on listed investment(375)-(1,500)-(3,313)
Loss before and after taxation and total comprehensive loss(564,724)(511,472)(968,315)(909,148)(1,956,618)

Loss per share attributable to the owners of the parent:

Notes(Unaudited) 3 months ended 30 June 2025 £(Unaudited) 3 months ended 30 June 2024 £(Unaudited) 6 months ended 30 June 2025 £(Unaudited) 6 months ended 30 June 2024 £(Audited) 12 months ended 31 December 2024 £
Basic and diluted (pence)5(1.11)(1.37)(2.15)(3.01)(5.66)
BEOWULF MINING PLC
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2025
(Unaudited) As at 30 June 2025 £(Unaudited) As at 30 June 2024 £(Audited) As at 31 December 2024 £
ASSETSNotes
Non-current assets
Intangible assets917,776,18315,211,73116,023,022
Property, plant and equipment45,71872,45656,685
Investments held at fair value through profit or loss1,7506,5633,250
Loans and other financial assets7,8145,1625,138
Right of use asset53,46870,42148,333
17,884,93315,366,33316,136,428
Current assets
Trade and other receivables123,876278,472192,512
Cash and cash equivalents773,2012,686,189881,349
897,0772,964,6611,073,861
TOTAL ASSETS18,782,01018,330,99417,210,289
EQUITY
Shareholders' equity
Share capital713,397,58012,356,92712,356,927
Share premium30,627,45429,888,28929,878,404
Capital contribution reserve46,45146,45146,451
Share-based payment reserve81,261,540923,9361,124,131
Merger reserve425,497870,275425,497
Translation reserve(1,520,019)(1,904,104)(2,395,934)
Accumulated losses(25,851,855)(24,231,417)(24,764,054)
Total equity18,386,64817,950,35716,671,422
Non-controlling interests-(164,778)-
TOTAL EQUITY18,386,64817,785,57916,671,422
LIABILITIES
Current liabilities
Trade and other payables354,989499,479508,124
Borrowings6---
Lease liability23,77224,60920,727
378,761524,088456,237
Non-current liabilities
Lease liability16,60121,32710,016
16,60121,32710,016
TOTAL LIABILITIES395,362545,415538,867
TOTAL EQUITY AND LIABILITIES18,782,01018,330,99417,210,289
BEOWULF MINING PLC
CONDENSED COMPANY STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2025
Notes(Unaudited) As at 30 June 2025 £(Unaudited) As at 30 June 2024 £(Audited) As at 31 December 2024 £
ASSETS
Non-current assets
Investments held at fair value through profit or loss1,7506,5633,250
Investment in subsidiaries4,137,3334,802,9464,093,692
Loans and other financial assets15,889,37713,664,38314,995,747
Office equipment633843723
20,029,09318,474,73519,093,412
Current assets
Trade and other receivables61,16262,41620,150
Cash and cash equivalents693,5172,571,639714,339
754,6792,634,055734,489
TOTAL ASSETS20,783,77221,108,79019,827,901
EQUITY
Shareholders' equity
Share capital713,397,58012,356,92712,356,927
Share premium30,627,45429,888,28929,878,404
Capital contribution reserve46,45146,45146,451
Share-based payment reserve1,261,540923,9361,124,131
Merger reserve425,497870,275425,497
Accumulated losses(25,095,353)(23,079,568)(24,127,038)
TOTAL EQUITY20,663,16921,006,31019,704,372
LIABILITIES
Current liabilities
Trade and other payables120,603102,480123,529
Borrowings6---
TOTAL LIABILITIES120,603102,480123,529
TOTAL EQUITY AND LIABILITIES20,783,77221,108,79019,827,901
BEOWULF MINING PLC
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS TO 30 JUNE 2025
Share capitalShare premiumCapital contribution reserveShare-based payment reserveMerger reserveTranslation reserveAccumulated lossesTotalNon- controlling interestTotal equity
££££££££££
At 1 January 202411,571,87527,141,44446,451903,766137,700(1,457,872)(23,235,514)15,107,850514,43015,622,280
Loss for the period------(959,438)(959,438)(17,040)-
Foreign exchange translation-----(446,232)-(446,232)(19,994)-
Total comprehensive loss-----(446,232)(959,438)(1,405,670)(37,034)-
Transactions with owners
Issue of share capital732,7253,657,859-----4,390,584-4,390,584
Issue costs-(911,014)-----(911,014)-(911,014)
Issue of share capital for acquisition of NCI52,327---732,575--784,902-784,902
Equity-settled share-based payment transactions---126,433---126,433-126,433
Step acquisition of Subsidiary------(142,728)(142,728)(642,174)(784,902)
Transfer on lapse of options---(106,263)--106,263---
At 30 June 2024 (Unaudited)12,356,92729,888,28946,451923,936870,275(1,904,104)(24,231,417)17,950,357(164,778)17,785,579
Loss for the period------(811,887)(811,887)(643)(812,530)
Foreign exchange translation-----(491,830)-(491,830)(107)(491,937)
Total comprehensive loss-----(491,830)(811,887)(1,303,717)(750)(1,304,467)
Transactions with owners
Issue costs-(9,885)-----(9,885)-(9,885)
Issue of share capital for acquisition of NCI----(444,778)--(444,778)-(444,778)
Equity-settled share-based payment transactions---200,195---200,195-200,195
Step acquisition of Subsidiary279,250279,250165,528444,778
At 31 December 2024 (Audited)12,356,92729,878,40446,4511,124,131425,497(2,395,934)(24,764,054)16,671,422-16,671,422
Loss for the period------(1,087,801)(1,087,801)-(1,087,801)
Foreign exchange translation-----875,915-875,915-875,915
Total comprehensive loss-----875,915(1,087,801)(211,886)-(211,886)
Transactions with owners
Issue of share capital1,040,6531,123,738-----2,164,390-2,164,390
Cost of issue-(374,688)-----(374,687)-(374,687)
Equity-settled share-based payment transactions---137,409---137,409-137,409
At 30 June 2025 (Unaudited)13,397,58030,627,45446,4511,261,540425,497(1,520,019)(25,851,855)18,386,648-18,386,648
BEOWULF MINING PLC
COMPANY STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS TO 30 JUNE 2025
Share capitalShare premiumCapital contribution reserveShare-based payment reserveMerger reserveAccumulated lossesTotal
£££££££
At 1 January 202411,571,87527,141,44446,451903,766137,700(22,276,683)17,524,553
Loss for the period-----(909,148)(909,148)
Total comprehensive loss-----(909,148)(909,148)
Transactions with owners
Issue of share capital732,7253,657,859----4,390,584
Issue costs-(911,014)----(911,014)
Issue of share capital for acquisition of NCI52,327---732,575-784,902
Equity-settled share-based payment transactions---126,433--126,433
Transfer from lapse of options---(106,263)-106,263-
At 30 June 2024 (Unaudited)12,356,92729,888,28946,451923,936870,275(23,079,568)21,006,310
Loss for the period-----(1,047,470)(1,047,470)
Total comprehensive loss-----(1,047,470)(1,047,470)
Transactions with owners
Cost of issue-(9,885)----(9,885)
Issue of share capital for acquisition of NCI----(444,778)-(444,778)
Equity-settled share-based payment trans actions---200,195--200,195
At 31 December 2024 (Audited)12,356,92729,878,40446,4511,124,131425,497(24,127,038)19,704,372
Loss for the period-----(968,315)(968,315)
Total comprehensive loss-----(968,315)(968,315)
Transactions with owners1,040,6531,123,738----2,164,390
Issue of share capital(374,688)----(374,688)
Equity-settled share-based payment transactions---137,409--137,409
At 30 June 2025 (Unaudited)13,397,58030,627,45446,4511,261,540425,497(25,095,353)20,663,168
BEOWULF MINING PLC
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS TO 30 JUNE 2025
(Unaudited)(Unaudited)(Audited)
6 months to6 months toYear ended
30 June 202530 June 202431 December 2024
£££
Cash flows from operating activities
Loss before income tax(1,087,801)(976,478)(1,789,008)
Depreciation of property, plant and equipment12,81913,39026,127
Amortisation of right-of-use asset22,81317,33437,205
Equity-settled share-based transactions137,409126,433326,628
Impairment of exploration costs--72,563
Loss on disposal of property, plant and equipment--778
Gain on disposal of right of use assets3,752--
Finance income(977)(1,677)(3,404)
Finance cost53,94560,17561,334
Fair value loss on listed investment1,500-3,313
Unrealised foreign exchange68156,187102,813
(855,859)(704,636)(1,161,651)
Decrease/(increase) trade and other receivables72,493(126,291)(39,177)
(Decrease)/increase in trade and other payables(170,467)(26,270)8,545
Net cash used in operating activities(953,833)(857,197)(1,192,283)
Cash flows from investing activities
Purchase of intangible fixed assets(889,719)(853,180)(2,265,113)
Purchase of property, plant and equipment-(5,257)-
Initial payments for right of use assets(3,727)-(6,108)
Interest received9211,678152,941
Grant receipt10,138143,6393,404
Net cash used in investing activities(882,387)(713,120)(2,114,876)
Cash flows from financing activities
Proceeds from issue of shares1,999,1424,390,5844,246,105
Payment of share issue costs(209,437)(911,014)(776,421)
Proceeds from borrowings-723,881723,881
Repayment of loan principal-(699,172)(699,172)
Interest paid on borrowings(52,256)(59,147)(59,147)
Lease principal paid(12,963)(12,025)(24,495)
Lease interest paid(1,688)(1,028)(2,187)
Net cash from financing activities1,722,7983,432,0793,408,114
(Decrease)/increase in cash and cash equivalents(113,422)1,861,762100,955
Cash and cash equivalents at beginning of period/year881,349905,555905,555
Effect of foreign exchange rate changes5,274(81,128)(125,161)
Cash and cash equivalents at end of period/year773,2012,686,189881,349
BEOWULF MINING PLC
CONDENSED COMPANY STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS TO 30 JUNE 2025
(Unaudited)(Unaudited)(Audited)
6 months to6 months toYear ended
30 June 202530 June 202431 December 2024
£££
Cash flows from operating activities
Loss before income tax(968,315)(909,148)(1,956,618)
Expected credit losses173,983181,922467,651
Equity-settled share-based transactions93,76769,864202,611
Depreciation of property, plant and equipment90120241
Impairment of investments in subsidiaries--331,764
Finance income(717)(1,631)(3,207)
Finance cost52,08659,14759,147
Fair value loss on listed investment1,500-3,313
Unrealised foreign exchange68156,187102,813
(646,925)(543,539)(792,285)
(Increase)/decrease in trade and other receivables(41,013)(13,261)29,007
Decrease in trade and other payables(2,926)(25,735)(4,689)
Net cash used in operating activities(690,864)(582,535)(767,967)
Cash flows from investing activities
Loans to subsidiaries(1,054,335)(1,006,440)(2,633,108)
Interest received7171,6313,207
Net cash used in investing activities(1,053,618)(1,004,809)(2,629,901)
Cash flows from financing activities
Proceeds from issue of shares1,999,1424,390,5844,246,105
Payment of share issue costs(209,437)(911,014)(776,421)
Proceeds from borrowings-723,881723,881
Repayment of loan principal-(699,172)(699,172)
Interest paid on borrowings(52,086)(59,147)(59,147)
Net cash from financing activities1,737,6193,445,1323,435,246
(Decrease)/increase in cash and cash equivalents(6,863)1,857,788(37,378)
Cash and cash equivalents at beginning of period/year714,339794,909794,909
Effect of foreign exchange rate changes(13,959)(81,058)(117,948)
Cash and cash equivalents at end of period/year693,5172,571,639714,339

NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED INTERIM FOR THE SIX MONTHS TO 30 JUNE 2025

  • Nature of Operations
  • Basis of preparation

The condensed consolidated financial information has been prepared on the basis of the recognition and measurement requirements of UK-adopted International Accounting Standards ("IFRS"). The accounting policies, methods of computation and presentation used in the preparation of the interim financial information are the same as those used in the Group's audited financial statements for the year ended 31 December 2024 except as noted below.

The financial information in this statement does not constitute full statutory accounts within the meaning of Section 434 of the UK Companies Act 2006. The financial information for the period ended 30 June 2025 is unaudited and has not been reviewed by the auditors.

The financial information for the twelve months ended 31 December 2024 is an extract from the audited financial statements of the Group and Company. The auditor's report on the statutory financial statements for the year ended 31 December 2024 was unqualified and included a material uncertainty relating to going concern.

On 21 March 2025, in conjunction with the Company's right issue, the Company entered into a short-term bridging loan of SEK 10 million (approx. £0.74 million) with the underwriters of the rights issue to ensure that the Company has sufficient financial resources to continue advancing its projects ahead of the right issue being finalised (see note 8). The bridging loan accrued interest of 1.5% per 30-day period and was repayable on 30 June 2025. The bridging loan principal and interest totalling £0.95 million was repaid early in May 2025 using part of the proceeds from the capital raise on the right issue.

On 8 May 2025, the Company announced the completion of the capital raise with a total of £2.2 million (SEK 28.1 million) gross raised to fund the development of the Company's assets through their next key valuation milestones. The net funds raised after the loan repayment and share issue transaction costs are £1.8 million (see note 9).

At the date of this report, based on management prepared cashflow forecasts, further funding will be required within the next 12 months to allow the Group and Company to continue to progress its key projects, realise its assets and discharge its liabilities in the normal course of business. There are currently no agreements in place and there is no certainty that the funds will be raised within the appropriate timeframe. These conditions indicate the existence of a material uncertainty which may cast significant doubt over the Group's and the Company's ability to continue as going concern. The Directors will continue to explore funding opportunities at both asset and corporate levels. The Directors have a reasonable expectation that funding will be forthcoming based on their past experience and therefore believe that the going concern basis of preparation is deemed appropriate and as such the financial statements have been prepared on a going concern basis. The financial statements do not include any adjustments that would result if the Group and the Company were unable to continue as going concern.

Finance costs

(Unaudited)(Unaudited)(Unaudited)(Unaudited)(Audited)
3 months3 months6 months6 months12 months
endedendedendedendedended
30 June 202530 June 202430 June 202530 June 202431 December 2024
£££££
Group
Bridging loan amortised interest48,23326,74752,08659,14759,147
Lease liability interest8715241,6881,0282,187
Other interest paid--171--
49,10427,27153,94560,17561,334
(Unaudited)(Unaudited)(Unaudited)(Unaudited)(Audited)
3 months3 months6 months6 months12 months
endedendedendedendedended
30 June 202530 June 202430 June 202530 June 202431 December 2024
£££££
Parent
Bridging loan amortised interest48,23326,74752,08659,14759,147
48,23326,74752,08659,14759,147
4. Other Income
(Unaudited)(Unaudited)(Unaudited)(Unaudited)(Audited)
3 months3 months6 months6 months12 months
endedendedendedendedended
30 June 202530 June 202430 June 202530 June 202431 December 2024
£££££
Other income16,793-16,793--
16,793-16,793--

Represents a €20,000 sale of exploration data relating to Åtvidaberg, a project previously held by the Company but that was fully impaired in the year ending 31 December 2023.

Loss per share

(Unaudited)(Unaudited)(Unaudited)(Unaudited)(Audited)
3 months3 months6 months6 months12 months
endedendedendedendedended
Group30 June 202530 June 202430 June 202530 June 202431 December 2024
Loss for the period/year attributable to shareholders of the Company (£'s)(637,525)(546,628)(1,087,801)(959,438)(1,956,618)
Weighted average number of ordinary shares51,101,37837,303,00044,973,08430,184,26134,550,117
Loss per share (p)(1.25)(1.47)(2.42)(3.18)(5.66)
Parent
Loss for the period/year attributable to shareholders of the Company (£'s)(564,724)(511,472)(968,315)(909,148)(1,956,618)
Weighted average number of ordinary shares51,101,37837,303,00044,973,08430,184,26134,550,117
Loss per share (p)(1.11)(1.37)(2.15)(3.01)(5.66)

The weighted average number presented for the period ending 30 June 2025 above and the year ending 31 December 2024 in the statement of comprehensive income have been adjusted for the effect of a 50 to 1 share consolidation.

Borrowings

(Unaudited)(Audited)
As at 30 June 2025As at 31 December 2024
££
Opening balance--
Funds advanced732,742723,881
Finance costs52,08659,147
Effect of FX31,954(24,709)
Funds repaid(816,782)(758,319)
--

On 21 March 2025, the Company secured a Bridging loan from Nordic investors of SEK 10 million (approximately £0.74 million). The Loan had a fixed interest rate of 1.5% per stated 30-day period during the duration. Accrued interest was compounding. The Loan had a commitment fee of 5.0% and a Maturity Date of 30 June 2025. The bridging loan principal and interest totalling £0.95 million was repaid early in May 2025 using part of the proceeds from the capital raise.

Share capital

(Unaudited)(Unaudited)(Audited)
As at 30 June 2025As at 30 June 2024As at 31 December 2024
£££
Allotted, issued and fully paid
Ordinary shares of 5p each2,982,8931,942,2401,942,240
Deferred A shares of 0.9p each10,414,68710,414,68710,414,687
Total13,397,58012,356,92712,356,927
The number of shares in issue was as follows:
Number
of ordinary shares
Balance at 1 Jan 20241,157,187,463
Issued during the period-
Effect of share consolidation(1,134,043,714)
Balance at 30 June 202423,143,749
Issued during the period15,701,041
Balance at 31 December 202438,844,790
Issued during the period20,813,076
Balance at 30 June 202559,657,866
Number
of deferred A shares
Balance at 1 January 2024-
Issued during the period1,157,187,463
Balance at 30 June 20241,157,187,463
Issued during the period-
Balance at 31 December 20241,157,187,463
Issued during the period-
Balance at 30 June 20251,157,187,463

On 8 May 2025, the Company announced the completion of the Capital Raise which comprised: the conditional Placing to issue 8,980,877 ordinary shares of £0.05 which raised a total of £1.0 million (approximately SEK 12.8 million) before expenses; the Rights Issue which raised SEK 14.9 million (approximately £1.2 million) before expenses with the issue of 10,714,286 new SDRs; the WRAP Retail Offer which raised £0.12 million (approximately SEK 1.6 million) before expenses with the issue of a total of 1,134,436 ordinary shares of £0.05.

Share based payments

During the Period, no options were granted (year ended 31 December 2024: 2,560,000). The options outstanding as at 30 June 2025 have an exercise price in the range of 37.5 pence to 262.5 pence (31 December 2024: 37.5 pence to 262.5 pence) and a weighted average remaining contractual life of 8 years, 67 days (31 December 2024: 8 years, 284 days).

The share-based payment expense for the options for the period ended 30 June 2025 was £44,601 (Q2 2024: £126,433; year ended 31 December 2024: £326,628).

202420242024202320222022
Fair value at grant date24p25.5p15p26p179.5p156p
Share price35p36.5p35p84p200p200p
Exercise price37.5p37.5p37.5p103p50p262.5p
Expected volatility77.5%79.9%77.5%55.2%100.0%100.0%
Expected option life6 years6 years2 years2.5 years5 years6 years
Contractual option life10 years10 years10 years5 years10 years10 years
Risk free interest rate4.080%4.100%4.480%4.800%4.520%4.480%
Reconciliation of options in issueNumberWeighted average exercise price(£'s)
Outstanding at 1 January 2024895,0002.300
Granted during the period2,560,0000.375
Lapsed during the period(285,000)3.307
Outstanding at 30 June 20243,170,0000.651
Exercisable at 30 June 2024646,6671.369
Reconciliation of options in issueNumberWeighted average exercise price(£'s)
Outstanding at 1 January 20253,170,0000.65
Outstanding at 30 June 20253,170,0000.65
Exercisable at 30 June 20251,501,6670.90

No warrants were granted during the Period (2024: Nil).

The reconciliation of options in issue presented for the year ended 31 December 2024 has retrospectively adjusted for the effect of a 50 to 1 share consolidation.

Intangible Assets: Group

Exploration assetsOther intangible assetsTotal
Net book value£££
As at 31 December 2024 (Audited)15,521,317501,70516,023,022
As at 30 June 2025 (Unaudited)17,098,417677,76617,776,183
Exploration costsAs at 30 June 2025As at 31 December 2024
(Unaudited)(Audited)
££
Cost
Opening balance15,521,31714,797,833
Additions for the period/year724,1471,751,954
Foreign exchange movements852,953(955,907)
Impairment-(72,563)
Closing balance17,098,41715,521,317

The net book value of exploration costs is comprised of expenditure on the following projects:

(Unaudited)(Audited)
As at 30 June 2025As at 31 December 2024
££
ProjectCountry
KallakSweden11,630,72610,271,536
PitkäjärviFinland1,712,3481,627,258
RääpysjärviFinland199,313188,016
LuopioinenFinland8,6817,157
EmasFinland51,58448,898
PirttikoskiFinland12,0567,347
MitrovicaKosovo2,488,4782,425,900
VitiKosovo675,364663,106
ShalaKosovo319,867282,099
17,098,41715,521,317

Total Group exploration costs of £17,098,417 are currently carried at cost in the financial statements. No impairment has been recognised during the Period, (2024: £72,563 in Karhunmäki).

Kallak is included in the condensed financial statements as at 30 June 2025 as an intangible exploration licence with a carrying value of £11,630,726 (31 December 2024: £10,271,536). Management have considered that there is no current risk associated with Kallak and thus have not impaired the project.

Other intangible assets(Unaudited) As at 30 June 2025(Audited) As at 31 December 2024
££
Cost
At 1 January501,70575,493
Additions for the period/year154,309620,561
Grant income received-(180,644)
Foreign exchange movements21,752(13,705)
Total677,766501,705

Post balance sheet events

On the 17 July 2025, the Company made an award of options for a total of 2,272,000 ordinary shares of 5 pence each in capital of the Company, representing approximately 3.8% of existing issued share capital. Following the award of the options, there will be 5,442,000 ordinary shares of 5 pence each of the Company under option to directors, senior management, and employees of the Company, representing 9.1% of the existing issued share capital of the Company. The options are exercisable at a price of 12 pence per share, vest over three years, in three equal proportions, a third on each subsequent anniversary of the date of grant, and are valid for 10 years from the date of grant

Availability of interim report

A copy of these results will be made available for inspection at the Company's registered office during normal business hours on any weekday. The Company's registered office is at 207 Temple Chambers, 3-7 Temple Avenue, London, EC4Y 0DT. A copy can also be downloaded from the Company's website at https://beowulfmining.com/. Beowulf Mining plc is registered in England and Wales with registered number 02330496.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.