Appraisal Well M-12 Results
Arrow Exploration Corp. has announced positive results from its Mateguafa HZ12 appraisal well, which has been successfully drilled and brought onto production, encountering multiple hydrocarbon-bearing intervals with approximately 30 feet of net oil pay in the Carbonera C9 formation and 15 feet in the Carbonera C7 formation. The well is currently producing at a restricted rate of 564 BOPD gross (282 BOPD net) with a 60% water cut, and initial testing indicates potential for higher rates. The company also spud its first Icaco exploration well and maintains a strong financial position with a cash balance of US$24.2 million and no debt as of May 1, 2026.
Select text to share a quote on X · sign in to keep highlights & notes in your AXL notes
First Icaco exploration well spud
CALGARY, May 8, 2026 - Arrow Exploration Corp. (AIM: AXL; TSXV: AXL) ("Arrow" or the "Company"), the high-growth operator with a portfolio of assets across key Colombian hydrocarbon basins, is pleased to provide an update on operational activity at the Mateguafa Attic field on the Tapir Block in the Llanos Basin of Colombia where Arrow holds a 50 percent beneficial interest.
Mateguafa H-Z12 Well
The Mateguafa HZ12 well (M-HZ12) was spud March 27, 2026, and reached target depth on April 7, 2026. The M-HZ12 well was drilled, on time and under budget, to a total measured depth of 13,824 feet (8,455 feet true vertical depth) and encountered multiple hydrocarbon-bearing intervals.
Arrow put M-HZ12 on production on April 16, 2026 in the Carbonera C9 formation ("C9"), which has approximately 30 feet of net oil pay (true vertical depth) at this location. The pay zone is a clean sandstone exhibiting an average porosity of 24% with high resistivities. An electric submersible pump (ESP) has been inserted in the well after perforating. During the clean-up period the well reached a maximum rate of 668 BOPD gross (334 BOPD net) before settling into the current stable production rate.
The M-HZ12 well also encountered approximately 15 feet of net oil pay (true vertical depth) in the Carbonera C7 formation ("C7").
The well is currently on production at 33/128 choke, 36 Hz pump frequency resulting in a heavily restricted rate of approximately 564 BOPD gross (282 BOPD net). The oil quality is 32° API and there is a 60% water cut (completion fluid and formation water).
The testing results indicate that the well is capable of higher rates, and the ultimate flow rate will be determined over the coming weeks of production.
Mateguafa Pad
The Mateguafa Pad currently has the following wells on production:
| Well | Production Gross BOPD | Production Net BOPD | Water Cut | Formation |
|---|---|---|---|---|
| M-HZ12 | 564 | 282 | 60% | C9 |
| M-11 | 460 | 230 | 50% | C7 |
| M-10 | 336 | 168 | 67% | C7 |
| M-HZ9 | 948 | 474 | 64% | C9 |
| M-HZ7 | 1,850 | 925 | 49% | C9 |
| M-6 | 236 | 118 | 56% | C7 |
| M-5 | 366 | 183 | 87% | C9 |
Forward Drilling Plans
The rig is currently at the Icaco pad where the Icaco 1 (A-1) well, an exploration well, was spud on May 5, 2026. Dependent upon the success of the A-1 well, Arrow plans a development program at the Icaco location.
The Company is also in the process of contracting a workover rig for a number of recompletions on the Tapir block. Arrow expects the workovers to begin late in the second quarter.
Production
Including the restricted production from the M-HZ12 well, total gross corporate production is approximately 5,000 boe/d. Currently the CN-HZ12 well is offline waiting on a workover. The well was producing approximately 330 BOPD gross (165 BOPD net) when it was shut in. Arrow has also shut in the Pepper gas field due to low natural gas prices in Alberta which was producing approximately 130 boe/d when it was shut in.
Prices
During March and April 2026, Arrow's oil field realized prices averaged $87 US/barrel and $90 US/barrel respectively, which reflects the increase in Brent oil prices caused by the unrest in the Middle East. Brent averaged $103.13 and $103.91 during the March and April 2026 periods.
Field prices reflect the deduction of the Vasconia differential and logistics fees (mostly transportation and quality differential) and are the prices Arrow receives for production.
Cash Balance
On May 1, 2026, the Company's cash balance was US$24.2 million. The Company continues to have no debt.
Tapir Extension
Arrow and its partner in the Tapir block remain in discussions with regulatory employees on the extension of the Tapir block. To date the dialog has been very constructive and we are working towards an agreement. Management remains very confident that the extension will be granted. Once the Colombian Federal election has been decided Arrow expects the focus of the regulatory bodies to return to the extension application process. The Company will continue to update the market on developments as they occur.
Marshall Abbott, CEO of Arrow commented:
"The continued success of the Mateguafa wells reinforces the materiality of the Mateguafa field to Arrow. Future work at Mateguafa will include both horizontal and vertical development wells, workovers and co-mingling."
"The Icaco prospect has been developed by the Arrow team using both 2D seismic and the more recently shot 3D seismic program. The Icaco prospect demonstrates the same technical scope and repeatability of the play type that has proven to be highly successful for Arrow in the Tapir Block in the Llanos Basin of Colombia. Management looks forward to updating shareholders on the progress at Icaco in the near term."
"Arrow aims to maintain a strong balance sheet with a healthy cash position, no debt and significant cash flow. This provides a stable platform with optionality to pursue both organic growth and accretive acquisitions."
About Arrow Exploration Corp.
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.