Atalaya Mining Plc (LSE: ATYM) is pleased to announce its unaudited first quarter financial results for the period ended 31 March 2024 ("Q1 2024" or "the Period") together with its unaudited condensed consolidated financial statements.

Highlights

  • Copper production of 10.7 kt Cu at cash costs of $2.99/lb and AISC of $3.17/lb

‒ Good cost control despite lower production in Q1 2024

  • EBITDA of €10.3 million at a realised copper price of $3.89/lb

‒ Lower operating costs partly offset lower copper revenues

  • Made further investments in key projects including waste stripping at San Dionisio
  • Strong balance sheet maintained with €36.1 million in net cash

‒ Negative working capital movements impacted operating cash flows

  • Completed move to Main Market of the London Stock Exchange on 29 April 2024

‒ Re-domiciliation work continues post implementation of new Cyprus law

Q1 2024 Financial Results Summary

Period ended 31 MarchUnitQ1 2024Q1 2023
Revenues from operations€k69,93891,171
Operating costs€k(59,687)(66,766)
EBITDA€k10,25124,405
Profit for the period€k1,62711,104
Basic earnings per share€ cents/share1.58.1
Cash flows from operating activities€k(1,737)12,362
Cash flows used in investing activities€k(17,877)(8,811)
Cash flows from financing activities€k(16,809)(9,431)
Net Cash position (1)€k36,06755,263
Working capital surplus€k59,60885,336
Average realised copper price (excluding QPs closed in the Period)US$/lb3.894.00
Cu concentrate producedtonnes52,68457,670
Cu productiontonnes10,66612,139
Cash costsUS$/lb payable2.992.88
All-In Sustaining Cost ("AISC")US$/lb payable3.173.12
  • Includes restricted cash and bank borrowings at 31 March 2024 and 31 March 2023.

Alberto Lavandeira, CEO, commented:

"Naturally, our revenues reflected our copper production for the quarter and while lower than recent periods, we expect copper grades to improve in the coming quarters. Positively, our cost control was good and helped to support EBITDA in Q1 2024, and our net cash position remains strong. Waste stripping activities are also advancing at San Dionisio, which is expected to provide Riotinto with higher grade material in the coming years.

The positive developments in the copper price have been pleasing to observe in recent weeks. Global demand remains supported by solid economic activity and strong investment in renewables, new technologies and domestic supply chains. On the supply side, challenges remain in the largest copper producing regions.

Few new large sources of supply are expected in the coming years as a result of permitting and execution challenges, discipline by key producers and a preference for buying production capacity rather than building it, as highlighted by recent corporate activity.

Atalaya is well-positioned thanks to its pipeline of growth projects that are located in regions with high quality infrastructure and long mining histories. Our key projects including Touro and those around Riotinto are expected to have low capital intensities and could come onstream much quicker than the mega projects being pursued by peers."

Investor Presentation Reminder

Alberto Lavandeira (CEO) and César Sánchez (CFO) will be holding a live presentation relating to the Q1 2024 Financial Results via the Investor Meet Company platform at 11:00am BST today.

To register, please visit the following link and click "Add to Meet" Atalaya via:

Q1 2024 Operating Results Summary

Units expressed in accordance with the international system of units (SI)UnitQ1 2024Q1 2023
Ore minedt3,701,8283,421,556
Waste minedt5,539,6776,516,903
Ore processedt3,740,0933,723,853
Copper ore grade%0.340.38
Copper concentrate grade%20.2521.05
Copper recovery rate%84.7486.88
Copper concentratet52,68457,670
Copper contained in concentratet10,66612,139
Payable copper contained in concentratet10,13911,563
Cash costUS$/lb payable2.992.88
All-in sustaining costUS$/lb payable3.173.12

Mining

Ore mined was 3.7 million tonnes in Q1 2024 (Q1 2023: 3.4 million tonnes).

Waste mined was 5.5 million tonnes in Q1 2024 (Q1 2023: 6.5 million tonnes). Separately, waste stripping activities advanced at the San Dionisio area.

Processing

The plant processed ore of 3.7 million tonnes during Q1 2024 (Q1 2023: 3.7 million tonnes). Throughput in Q1 2024 included the scheduling of two plant shutdowns, one for maintenance and the other for connecting the 50 MW solar plant to the substation.

Copper grade was 0.34% in Q1 2024 (Q1 2023: 0.38%). The lower copper grade in Q1 2024 was mainly the result of pit sequencing and also due to rainfall which prevented access to higher grade areas of the Cerro Colorado pit.

Copper recovery was 84.74% in Q1 2024 (Q1 2023: 86.88%) due to lower grades being processed.

Production

Copper production was 10,666 tonnes in Q1 2024 (Q1 2023: 12,139 tonnes). Lower production in Q1 2024 was mainly the result of lower grades and recoveries.

On-site copper concentrate inventories at the end of Q1 2024 were approximately 8,283 tonnes.

Copper contained in concentrates sold was 10,286 tonnes in Q1 2024 (Q1 2023: 12,501 tonnes).

Cash Costs and AISC Breakdown

$/lb Cu payableQ1 2024Q1 2023
Mining0.990.83
Processing0.910.97
Other site operating costs0.670.52
Total site operating costs2.572.32
By-product credits(0.14)(0.09)
Freight, treatment charges and other offsite costs0.560.65
Total offsite costs0.420.56
Cash costs2.992.88
Cash costs2.992.88
Corporate costs0.090.07
Sustaining capital (excluding one-off tailings expansion)0.020.01
Capitalised stripping costs-0.08
Other costs0.070.08
AISC3.173.12

Note: Some figures may not add up due to rounding.

Cash costs were $2.99/lb payable copper in Q1 2024 (Q1 2023: $2.88/lb), with the increase mainly due to lower copper production, partly offset by lower offsite costs.

AISC were $3.17/lb payable copper in Q1 2024 (Q1 2023: $3.12/lb). Lower capitalised stripping costs at Cerro Colorado helped to offset higher cash costs and corporate costs. AISC excludes one-off investments in the tailings dam (consistent with prior reporting) and waste stripping at the San Dionisio area.

Q1 2024 Financial Results Highlights

Income Statement

Revenues were €69.9 million in Q1 2024 (Q1 2023: €91.2 million). Lower revenues were the result of lower copper concentrate sales and lower realised copper prices.

Operating costs were €59.7 million in Q1 2024 (Q1 2023: €66.8 million). Lower operating costs were mainly the result of lower sales volume and lower electricity prices.

EBITDA was €10.3 million in Q1 2024 (Q1 2023: €24.4 million). Lower EBITDA resulted from lower revenues, partly offset by lower operating costs.

Profit after tax was €1.6 million in Q1 2024 (Q1 2023: €11.1 million) or 1.5 cents basic earnings per share (Q1 2023: 8.1 cents). Lower profits were impacted by the same factors as EBITDA and higher depreciation, partly offset by a foreign exchange gain and lower taxes.

Cash Flow Statement

Cash flows from operating activities before changes in working capital were positive €11.4 million in Q1 2024 (Q1 2023: positive €24.1 million) and net cash from operating activities was negative €1.7 million (Q1 2023: positive €12.4 million).

Cash flows used in investing activities were €17.9 million in Q1 2024 (Q1 2023: €8.8 million). Key investments in Q1 2024 included €0.4 million in sustaining capex (Q1 2023: €0.3 million), nil in capitalised stripping at Cerro Colorado (Q1 2023: €1.9 million), €8.2 million related to the San Dionisio area (Q1 2023: nil), €2.3 million to extend the tailings dam (Q1 2023: €2.3 million), €0.7 million for the 50 MW solar plant (Q1 2023: €1.6 million) and €6.3 million for the E-LIX Phase I Plant (Q1 2023: €3.3 million) including ramp-up costs.

Cash flows from financing activities were negative €16.8 million in Q1 2024 (Q1 2023: negative €9.4 million) due to repayments made under the Company's credit facilities.

Balance Sheet

The Company's balance sheet remains strong with consolidated cash and cash equivalents of €86.2 million as at 31 March 2024. Net of current and non-current borrowings of €50.1 million, net cash was €36.1 million as at 31 March 2024, compared with €54.3 million as at 31 December 2023 with the decrease in cash being the result of lower copper sales and higher investment in the Company's capital projects.

Inventories of concentrate valued at cost were €8.8 million at 31 March 2024 (31 December 2023: €8.4 million). The total working capital surplus was €59.6 million at 31 March 2024 (31 December 2023: €68.6 million).

Outlook for 2024

Copper production in Q1 2024 was impacted by lower copper grades and recoveries. Guidance for FY2024 of 51,000 - 53,000 tonnes is unchanged due to the expectation of higher copper grades in the coming quarters and will be reviewed on an ongoing basis.

Guidance for FY2024 cash costs and AISC are $2.80 - 3.00/lb and $3.00 - 3.20/lb copper payable, respectively. AISC excludes one-off investments in the tailings dam and ongoing waste stripping at the San Dionisio area.

Corporate Activities Update

Move to the Main Market

On 29 April 2024, the Company announced the admission of its ordinary shares to the premium listing segment of the Official List maintained by the FCA and to trading on London Stock Exchange's main market for listed securities, along with the cancellation of trading on AIM.

The move up marks a significant corporate milestone for Atalaya and reflects the Company's desire to expand its investor base and continue its growth trajectory.

Photo 1: London Stock Exchange Market Open Ceremony

Re-domiciliation

On 12 December 2023, the Company held an Extraordinary General Meeting in relation to its intention to re-domicile the Company by transferring its registered office from the Republic of Cyprus to the Kingdom of Spain. All resolutions were approved by the Company's shareholders.

On 15 March 2024, a new law related to cross-border reorganisations entered into force in Cyprus, thereby amending the Cyprus Companies Law by setting out new procedural requirements in connection with cross-border conversions of Cypriot companies into another EU jurisdiction. The Company has concluded that it will need to follow the new procedures in order to complete the re-domiciliation.

As part of the new law, the Company is required to publish a report that analyses the implications of the cross-border conversion for its shareholders and employees ("Cross-Border Conversion Report"). The Cross-Border Conversion Report is now available on the Company's website at www.atalayamining.com/investors/other-documents/.

The Company will seek the shareholder approvals required to implement the new procedures at its 2024 Annual General Meeting on 27 June 2024. Assuming all necessary approvals are obtained, the Company expects that it could complete the re-domiciliation procedures in Q4 2024. Further updates on the process will be provided by the Company in due course.

Asset Portfolio Update

Proyecto Riotinto

In 2023, the Company was granted a substantial modification to the existing Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) for Proyecto Riotinto by the Junta de Andalucía. The AAU allows for the expansion of tailings capacity and the mine footprint at Riotinto and represents an important step towards developing regional deposits such as San Dionisio and San Antonio.

The Company is advancing the permitting process associated with the San Dionisio final pit, which represents a key component of the integrated mine plan outlined in the 2023 Riotinto PEA. Waste stripping is underway in order to prepare the area for future mining phases, with 4.6 million tonnes of waste mined in Q1 2024. Additional mining equipment is expected to arrive on site in Q2 2024.

At San Antonio, preparations are underway to begin an infill and step-out drilling programme.

E-LIX Phase I Plant

Final construction activities are underway at the E-LIX Phase I plant. Following the production of initial copper cathodes and zinc precipitate, commissioning and ramp-up is expected to continue throughout Q2 2024.

50 MW Solar Plant

Construction activities are advancing at the 50 MW solar plant at Riotinto, however, the Company's contractor has given notice of further delays and now expects completion in late 2024.

The Company is evaluating further measures that could mitigate the financial impact of a future increase in market electricity prices until the 50 MW solar plant is fully completed. So far in 2024, market electricity prices have been below long term averages in Spain, therefore the construction delay has not had a material impact on the Company's operating costs.

Riotinto District - Proyecto Masa Valverde ("PMV")

In 2023, the Company was granted the AAU and exploitation permit for PMV. As a result, various workstreams continue including geotechnical and sterilisation drilling to support design work associated with a future ramp and ventilation shaft. At this stage, the Company expects to start construction of the access ramp by the end of 2024.

Two core rigs are active and focused on step-out drilling at the Mojarra Trend and the Masa Valverde deposit.

Proyecto Touro

Touro has the potential to become a new source of copper production for Europe. As such, the project could also be granted "Strategic Project" status by the EU, which can be awarded to projects "based on their contribution to the security of supply of strategic raw materials, their technical feasibility, sustainability and social standards", as part of the Critical Raw Materials Act. Copper was added to the list of "Strategic Raw Materials" owing to its importance for strategic sectors and technologies and due to the supply-demand imbalance that is expected in the near future.

Proyecto Ossa Morena

Drilling continued to progress with one rig at the Guijarro-Chaparral gold-copper project and the La Hinchona copper-gold project, both in the central part of the district. Drilling is expected to resume at the flagship Alconchel-Pallares copper-gold project during Q2 2024.

Proyecto Riotinto East

In Q2 2024, drill testing will begin at priority anomalies identified via SkyTEM and AGG surveys.

ATALAYA MINING PLC

MANAGEMENT'S REVIEW AND

UNAUDITED INTERIM CONDENSED CONSOLIDATED

FINANCIAL STATEMENTS

Notice to Reader

Introduction

This report provides an overview and analysis of the financial results of operations of Atalaya Mining Plc and its subsidiaries ("Atalaya" and/or "Group"), to enable the reader to assess material changes in the financial position between 31 December 2023 and 31 March 2024 and results of operations for the three months ended 31 March 2024 and 2023.

This report has been prepared as of 20 May 2024. The analysis, hereby included, is intended to supplement and complement the unaudited interim condensed consolidated financial statements and notes thereto ("Financial Statements") as at and for the period ended 31 March 2024. The reader should review the Financial Statements in conjunction with the review of this report and with the audited, consolidated financial statements for the year ended 31 December 2023. These documents can be found on Atalaya's website at www.atalayamining.com.

Atalaya prepares its Annual Financial Statements in accordance with International Financial Reporting Standards ("IFRS") as adopted by EU and its Unaudited Interim Condensed Consolidated Financial Statements in accordance with International Accounting Standards 34: Interim Financial Reporting. The currency referred to in this document is the Euro, unless otherwise specified.

Incorporation and description of the Business

The Company was first listed on the Alternative Investment Market (AIM) of the London Stock Exchange in May 2005, trading under the symbol ATYM. On 29 April 2024, the Company was admitted to the premium listing segment of the Official List maintained by the FCA and to trading on the main market of the London Stock Exchange.

Proyecto Riotinto

Proyecto Touro

In November 2019, Atalaya executed the option to acquire 12.5% of Explotaciones Gallegas del Cobre, S.L. the exploration property around Touro, with known additional reserves, which will provide high potential to the Proyecto Touro.

Proyecto Masa Valverde

On 21 October 2020, the Company announced that it entered into a definitive purchase agreement to acquire 100% of the shares of Cambridge Mineria España, S.L. (since renamed Atalaya Masa Valverde, S.L.U.), a Spanish company which fully owns the Masa Valverde polymetallic project located in Huelva (Spain). Under the terms of the agreement Atalaya will make an aggregate €1.4 million cash payment in two instalments of approximately the same amount. The first payment is to be executed once the project is permitted and second and final payment when first production is achieved from the concession.

Proyecto Ossa Morena

In December 2021, Atalaya announced the acquisition of a 51% interest in Rio Narcea Nickel, S.L., which owns 9 investigation permits. The acquisition also provided a 100% interest in three investigation permits that are also located along the Ossa- Morena Metallogenic Belt. In Q3 2022, Atalaya increased its ownership interest in POM to 99.9%, up from 51%, following completion of a capital increase that will fund exploration activities. During 2022 Atalaya rejected 8 investigation permits.

Atalaya will pay a total of €2.5 million in cash in three instalments and grant a 1% net smelter return ("NSR") royalty over all acquired permits. The first payment of €0.5 million will be made following execution of the purchase agreement. The second and third instalments of €1 million each will be made once the environmental impact statement ("EIS") and the final mining permits for any project within any of the investigation permits acquired under the Transaction are secured.

Proyecto Riotinto East

In December 2020, Atalaya entered into a Memorandum of Understanding with a local private Spanish company to acquire a 100% beneficial interest in two investigation permits (known as Peñas Blancas and Cerro Negro investigation permits), which are located immediately to the east of Proyecto Riotinto.

Overview of Operational Results

Proyecto Riotinto

The following table presents a summarised statement of operations of Proyecto Riotinto for the three months ended 31 March 2024 and 2023, respectively.

Units expressed in accordance with the international system of units (SI)UnitThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Ore minedt3,701,8283,421,556
Waste minedt5,539,6776,516,903
Ore processedt3,740,0933,723,853
Copper ore grade%0.340.38
Copper concentrate grade%20.2521.05
Copper recovery rate%84.7486.88
Copper concentratet52,68457,670
Copper contained in concentratet10,66612,139
Payable copper contained in concentratet10,13911,563
Cash cost*US$/lb payable2.992.88
All-in sustaining cost*US$/lb payable3.173.12

(*) Refer Section 5 of this Management Review.

$/lb Cu payableQ1 2024Q1 2023
Mining0.990.83
Processing0.910.97
Other site operating costs0.670.52
Total site operating costs2.572.32
By-product credits(0.14)(0.09)
Freight, treatment charges and other offsite costs0.560.65
Total offsite costs0.420.56
Cash costs2.992.88
Cash costs2.992.88
Corporate costs0.090.07
Sustaining capital (excluding one-off tailings expansion)0.020.01
Capitalised stripping costs-0.08
Other costs0.070.08
AISC3.173.12

Note: Some figures may not add up due to rounding.

Three months operational review

Mining

Waste mined was 5.5 million tonnes in Q1 2024 (Q1 2023: 6.5 million tonnes), compared with 7.4 million tonnes in Q4 2023. Separately, waste stripping activities advanced at the San Dionisio area.

Processing

The plant processed 3.7 million tonnes of ore in Q1 2024 (Q1 2023: 3.7 million tonnes) compared to 4.1 million tonnes in Q4 2023. Throughput was impacted by the scheduling of two plant shutdowns, one for maintenance and the other for the connection of the 50 MW solar plant to the substation.

Copper grade in Q1 2024 was 0.34% (Q1 2023: 0.38%) compared to 0.36% in Q4 2023. The lower copper grade in Q1 2024 was mainly due to pit sequencing and also rainfall which prevented access to higher grade areas of the Cerro Colorado pit.

Copper recovery was 84.74% in Q1 2024 (Q1 2023: 86.88%), compared with 85.47% in Q4 2023, due to lower grades being processed.

Production

Copper production was 10,666 tonnes in Q1 2024 (Q1 2023: 12,139 tonnes), compared with 12,775 tonnes in Q4 2023. Lower production in Q1 2024 was mainly the result of lower grades and recoveries.

On-site copper concentrate inventories at the end of Q1 2024 were approximately 8,283 tonnes.

Copper contained in concentrates sold was 10,286 tonnes in Q1 2024 (Q1 2023: 12,501 tonnes).

Outlook

Operational guidance

Guidance for Proyecto Riotinto is unchanged from the previously announced outlook.

UnitGuidance 2024
Ore minedmillion tonnes~19
Waste minedmillion tonnes~25
Ore processedmillion tonnes15.3 - 15.8
Copper ore grade%0.39 - 0.41
Copper recovery rate%84 - 86
Contained coppertonnes51,000 - 53,000
Cash costs$/lb payable2.80 - 3.00
All-in sustaining cost$/lb payable3.00 - 3.20

Production

Copper production in Q1 2024 was impacted by lower copper grades and recoveries. Guidance for FY2024 of 51,000 - 53,000 tonnes is unchanged due to the expectation of higher copper grades in the coming quarters and will be reviewed on an ongoing basis.

Operating Costs

Operating cost guidance for FY2024 are a cash cost range of $2.80 - 3.00/lb copper payable and an AISC range of $3.00 - 3.20/lb copper payable. AISC excludes one-off investments in the tailings dam (consistent with prior reporting) and waste stripping at the San Dionisio area, which are included in capital expenditure guidance below.

Capital Expenditures

Non-sustaining capital expenditure guidance for FY2024 is €64 - 73 million. This includes €4 - 5 million for completion of the 50 MW solar plant, €5 - 7 million for completion and ramp-up of the E-LIX Phase I Plant, €42 - 46 million for San Dionisio waste stripping, dewatering and road relocation and €13 - 15 million for expansion of the existing Riotinto tailings facility.

Exploration

Atalaya's exploration guidance for FY2024 is €5 - 7 million.

Overview of the Financial Results

The following table presents summarised consolidated income statements for the three months ended 31 March 2024, with comparatives for the three months ended 31 March 2023.

( Euro 000's )Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Revenues69,93891,171
Costs of sales(56,757)(63,003)
Administrative and other expenses(1,927)(2,033)
Exploration expenses(855)(1,533)
Care and maintenance expenditure(432)(295)
Other income28498
EBITDA10,25124,405
Depreciation/amortisation(9,606)(8,762)
Net foreign exchange gain/(loss)1,571(1,222)
Net finance cost(90)(844)
Tax(499)(2,473)
Profit for the period1,62711,104

Three months financial review

Revenues for the three-month period ended 31 March 2024 amounted to €69.9 million (Q1 2023: €91.2 million). Lower revenues are mainly due to a lower in copper concentrate volume sold and lower realised copper prices.

Realised prices excluding QPs were US$3.89/lb copper during Q1 2024 compared with $4.00/lb copper in Q1 2023. The realised price, including QPs were approximately $3.79/lb during the quarter ($3.94/lb in Q1 2023).

Cost of sales for the three-month period ended 31 March 2024 amounted to €56.8 million, compared with €63.0 million in Q1 2023. Lower costs primarily attributable to lower sales volume and reduced electricity prices.

Cash costs of $2.99/lb payable copper during Q1 2024 compared with $2.88lb payable copper in the same period last year. Higher cash costs mainly due to lower copper production in the quarter, combined with a weaker USD Dollar/Euro exchange rate compared to Q1 2023. AISC excluding investment in tailings dam expansion and San Dionisio stripping for Q1 2024 were $3.17/lb payable copper compared to $3.12/lb payable copper in Q1 2023. The increase was primarily due to higher cash costs.

Sustaining capex for Q1 2024 amounted to €0.4 million compared with €0.3 million in Q1 2023. Sustaining capex was mainly related to continuous enhancements in the processing systems of the plant. In addition, the Company invested €2.3 million in the project to increase the tailings dam during Q1 2024.

Capex associated with the construction of the 50 MW solar plant amounted to €0.7 million in Q1 2024, while investments in the E-LIX Phase I plant, commissioning and ramp-up totalled €6.3 million. Additionally, a capex of €8.2 million is related to the San Dionisio area.

Administrative and other expenses amounted to €1.9 million (Q1 2023: €2.0 million) and include non-operating costs of the Cyprus office, corporate legal and consultancy costs, on-going listing costs, officers and directors' emoluments, and salaries and related costs of the corporate office.

Exploration costs for the three-month period ended 31 March 2024 amounted to €0.9 million, lower than Q1 2023 (€1.5 million).

EBITDA for the three months ended 31 March 2024 amounted to €10.3 million compared with Q1 2023 of €24.5 million. The lower EBITDA was due to the decline in sales as explained above, partially offset by a reduction in cost of sales.

The main item below the EBITDA line is depreciation and amortisation of €9.6 million (Q1 2023: €8.8 million).

Net foreign exchange differences have a positive impact due to the weaker US Dollar/Euro rate at the end of Q1 2024 compared with the beginning of the quarter.

Net financing costs for Q1 2024 amounted to €0.1 million compared with €0.8 million in Q1 2023.

Copper prices

The average realised copper price (excluding QPs) decreased 3% from US$4.00 per pound in Q1 2023 to US$3.89 per pound in Q1 2024.

The average prices of copper for the three months ended 31 March 2024 and 2023 are summarised below:

$/lbThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Realised copper price excluding QPs closed3.894.00
Market copper price per lb (period average)3.944.05

Realised copper prices for the reporting period noted above have been calculated using payable copper and excluding both provisional invoices and final settlements of quotation periods ("QPs") together. The realised price during the year, including the QP, was approximately $3.79/lb.

  • Non-GAAP Measures
  • Liquidity and Capital Resources

The following is a summary of Atalaya's cash position as at 31 March 2024 and 31 December 2023 and cash flows for Q1 2024 and 2023.

Liquidity information

( Euro 000's )31 Mar 202431 Dec 2023
Unrestricted cash and cash equivalents at Group level58,89594,868
Unrestricted cash and cash equivalents at Operation level27,26026,139
Consolidated cash and cash equivalents86,155121,007
Net cash position (1)36,06754,320
Working capital surplus59,60868,618

Includes borrowings

Unrestricted cash and cash equivalents (which include cash at both Group level and Operation level) as at 31 March 2024 decreased to €86.2 million from €121.0 million at 31 December 2023. The decrease in cash was mainly due to higher cash outflows from operations, investments and repayment of financing. Specifically, negative working capital movements offset cash flows from operations, investments increased due to the capital expenditure in the San Dionisio area and financing saw higher outflows due to the repayment of operating facilities. Cash balances are unrestricted and include balances at operational and corporate level.

As of 31 March 2024, Atalaya reported a working capital surplus of €59.6 million, compared with a working capital surplus of €68.6 million at 31 December 2023. The decrease in working capital mainly resulted from the repayment of current payables.

Overview of the Group's cash flows

( Euro 000's )Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Cash flows (used in)/from operating activities(1,737)12,362
Cash flows used in investing activities(17,877)(8,811)
Cash flows used in financing activities(16,809)(9,431)
Net (decrease) in cash and cash equivalents(36,423)(5,880)
Net foreign exchange differences1,571(1,222)
Total net cash flow for the period(34,852)(7,102)

Three months cash flows review

Cash and cash equivalents were €86.2 million at 31 March 2024. This was due to the net results of cash used in operating activities amounting to €1.7 million, the cash used in investing activities amounting to €17.9 million, the cash used from financing activities totaling €16.8 million and net foreign exchange differences of positive €1.6 million.

Cash generated from operating activities before working capital changes was €11.4 million. Trade receivables in the period increased by €2.7 million, inventory levels increased by €2.2 million and trade payables decreased by €6.2 million.

Investing activities during the quarter consumed €17.9 million, relating mainly to the tailings dams project, E-LIX, San Dionisio area and continuous enhancements in the processing systems of the plant.

Financing activities during the quarter used €16.8 million driven by repayments of existing unsecured credit facilities.

Foreign exchange

During the three months ended 31 March 2024, Atalaya recognised a foreign exchange gain of €1.6 million (€1.2 million foreign exchange loss in Q1 2023). Foreign exchange gain mainly related to change in the period end EUR and USD conversion rates, as all sales are cashed and generally held in USD.

The following table summarises the movement in key currencies versus the EUR:

( Euro 000's )Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Average rates for the periods
GBP - EUR0.85630.8831
USD - EUR1.08581.0730
Spot rates as at
GBP - EUR0.85510.8792
USD - EUR1.08111.0875

Sustainability

Corporate Social Responsibility

The first quarter of the year brings further developments from Atalaya and its wholly owned Fundación Atalaya Riotinto that continue to work on several actions to undertake its social responsibilities.

In this regard, the agreements with near-by municipalities to establish collaboration have been renewed and will be operative until mid 2027. With such instrument in place, there are already some agreed initiatives to improve certain aspects of the towns, with projects that will be funded by our Foundation Atalaya aiming at activities that will positively impact social, environmental, and infrastructure issues.

For example, during the quarter, Atalaya has agreed to fund the construction of a playground in Nerva, not only aimed at children but also comprising cardio exercising equipment for adults. Also in Nerva, Atalaya has agreed to fund the replacement of halogen bulbs for LED in multiple streets in Nerva town, which will improve the public lighting and contribute to reduce the carbon footprint of the town. In parallel, Atalaya keeps developing its own projects, including the Fourth Atalaya Mining Operators Course for unemployed locals. This program has entered now its final stage, with students already on board with the different companies to complete their 200 hrs hands-on training.

The Foundation is also working in the development of Riotinto Experience program, which is an established site tour open to the public that will represent a new product to attract visitors to the area contributing to diversification as well as a very effective channel to communicate the positive impact of modern mining. During the period, Fundación Atalaya has also agreed to support various initiatives in the near-by towns, including sporting activities, such as a bicycle championship that brought more than 400 participants (La Mina Bike Maraton), and contributions to local sports teams like CD Trail El Campillo, Campofrío FC, Riotinto Balompié, and Corta Atalaya Golf Club. It also contributed to cultural initiatives like the Music School "Julia Hierro" Contest, the Jornadas Micológicas with Agaricus association and the national Poetry Contest in Riotinto "Huellas de Cobre". On the social side, Atalaya has contributed to the activities of Unidos por el Alto association, which works with disadvantaged local youth.

Health and Safety

The positive trend of 2023 has continued during the first quarter of 2024. There were 3 accidents with lost time with a 5.08 for the Frequency Index and 0.07 for the Severity Index.

Annual reports of technical specialties in occupational risk prevention, the prevention plan, and the safety and health document accompanying the Work Plan were prepared, as well as the planning of preventive activity for the year 2024.

Regarding Industrial Hygiene measurements, almost all of those planned for the first quarter were carried out. As for the first intervention brigade, training for the volunteers of the Brigade in the handling of the basic life support and a inspection session of the mining facility.

In addition, Atalaya has reviewed the risks assessment of all jobs in terms of manual handling of loads, forced postures and repetitive movements to re-evaluate the ergonomics parameters.

Furthermore, during the quarter the first meeting of the health and safety committee with the worker representatives took place and Atalaya updated its internal procedure for controlling drugs and preventing work under the influence of psychoactive substances using AI.

Environment

During the first quarter of 2024, the environmental department has continued executing the actions of environmental monitoring of the activity and management of the natural environment. Key points of the quarter:

  • During the first quarter of the year, three environmental incidents were registered. All of them related to spills over unpaved area. The areas were cleaned, and the waste were handled properly.
  • A total rainfall of 481.3 l/m2 was recorded in Q1 2024, which was around 568% more than in the same period of previous year. The total rain collected for the hydrological year (October 2023 to September 2024) is 787.2 l/m2, which is 131% more than the rainfall recorded in the previous hydrological year (same period).
  • Upon expiration of the existing permit, in January 2024, Atalaya was granted a new temporary permit valid until January 2026 for an additional 4.1 hm3 per year of fresh water supply for a total of 6.6 hm3 per year.
  • The additional measures contemplated in the action plan against dust continued to be implemented, intensifying periodic irrigation, implementing new coordination measures, and carrying out exhaustive monitoring of the emissions generated in the operation.
  • All the regular internal controls of diffuse emissions into the atmosphere have been carried out, and the results of the controls are within the limit values. However, in January, PST limit was exceeded at sampling point number 1, and in March, PSD limit was exceeded in five control points (dust intrusion). In the rest, PSD and PST limits were met. The remaining periodic and mandatory controls have been carried out without incidents. In addition, during the quarter, several reports were handed to the Administration bodies.
  • Environmental inspections were performed daily, mainly focused on chemical storage and handling, housekeeping, waste management, uncontrolled releases and environmentally friendly practices carried out in the project by ARM's and contractors' personnel. Additionally, dust control and drainage system inspections were performed regularly. 84 inspections in total were carried out during the first quarter, including, plant, mine area and the contractors' camps.
  • Environmental inspections were performed daily, mainly focused on chemical storage and handling, housekeeping, waste management, uncontrolled releases and environmentally friendly practices carried out in the project by ARM's and contractors' personnel. Additionally, dust control and drainage system inspections were performed regularly. 82 inspections in total were carried out during the third quarter, including, plant, mine area and the contractors' camps.
  • Risk Factors

The Company continues to monitor the principal risks and uncertainties that could materially impact the Company's results and operations, including the areas of increasing uncertainty such as inflationary pressure on goods and services required for the business and geopolitical developments worldwide.

  • Critical accounting policies, estimates, judgements, assumptions and accounting changes

As at 31 March 2024, there are no significant changes in critical accounting policies or estimates to those applied in 2023.

Other Information

Additional information about Atalaya Mining Plc. is available at www.atalayamining.com

Unaudited interim condensed consolidated financial statements on subsequent pages.

By Order of the Board of Directors,

___________________________________

Roger Davey

Chairman

Nicosia, 20 May 2024

Unaudited Interim Condensed Consolidated Income Statements

(All amounts in Euro thousands unless otherwise stated)

For the period ended 31 March 2024 and 2023

( Euro 000's )NoteThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Revenue469,93891,171
Operating costs and mine site administrative expenses(56,606)(62,927)
Mine site depreciation and amortisation(9,606)(8,762)
Gross profit3,72619,482
Administration and other expenses(1,927)(2,033)
Share-based benefits15(151)(76)
Exploration expenses(855)(1,533)
Care and maintenance expenditure(432)(295)
Operating profit36115,545
Other income28498
Net foreign exchange gain/(loss)31,571(1,222)
Net finance costs5(90)(844)
Profit before tax2,12613,577
Tax6(499)(2,473)
Profit for the period1,62711,104
Profit for the period attributable to:
- Owners of the parent72,02611,369
- Non-controlling interests(399)(265)
1,62711,104

Earnings per share from operations attributable to equity holders of the parent during the period:

( Euro 000's )NoteThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Basic earnings per share (EUR cents per share)71.58.1
Fully diluted earnings per share (EUR cents per share)71.47.9
Profit for the period1,62711,104
Change in fair value of financial assets through other comprehensive income 'OCI'(4)6
Total comprehensive income for the period1,62311,110
Total comprehensive income for the period attributable to:
- Owners of the parent72,02211,375
- Non-controlling interests(398)(265)
1,62311,110

Unaudited Interim Condensed Consolidated Statement of Financial Position

(All amounts in Euro thousands unless otherwise stated)

As at 31 March 2024 and 2023

(Euro 000's)Note31 Mar 202331 Dec 2023
AssetsUnauditedAudited
Non-current assets
Property, plant and equipment9393,463384,739
Intangible assets1049,09049,397
Trade and other receivables1226,98926,702
Non-current financial assets2.31,1011,101
Deferred tax asset11,24611,282
481,889473,221
Current assets
Inventories1135,55833,314
Trade and other receivables1243,48742,897
Tax refundable1,902100
Other financial assets2.32730
Cash and cash equivalents1386,155121,007
167,129197,348
Total assets649,018670,569
Equity and liabilities
Equity attributable to owners of the parent
Share capital1413,59813,596
Share premium14319,482319,411
Other reserves1587,54970,463
Accumulated profit83,11398,026
503,742501,496
Non-controlling interests(9,503)(9,104)
Total equity494,239492,392
Liabilities
Non-current liabilities
Trade and other payables162,2052,205
Provisions1727,81627,234
Lease liabilities193,6813,877
Borrowings1813,55616,131
47,25849,447
Current liabilities
Trade and other payables1669,70575,922
Lease liabilities19487501
Borrowings1836,53250,556
Current provisions17163434
Current tax liabilities6341,317
107,521128,730
Total liabilities154,779178,177
Total equity and liabilities649,018670,569

Unaudited Interim Condensed Consolidated Statements of Changes in Equity

(All amounts in Euro thousands unless otherwise stated)

For the period ended 31 March 2024 and 2023

(Euro 000's)NoteShare capitalShare premium (1)Other reservesAccum. ProfitsTotalNCITotal equity
At 1 January 202413,596319,41170,46398,026501,496(9,104)492,392
Profit for the period---2,0262,026(399)1,627
Change in fair value of financial assets through OCI--(4)-(4)-(4)
Total comprehensive income--(4)2,0262,022(399)1,623
Issuance of share capital271--73-73
Recognition of depletion factor14--7,500(7,500)---
Recognition of share-based payments15--151-151-151
Recognition of non-distributable reserve15--142(142)---
Recognition of distributable reserve15--9,297(9,297)---
At 31 March 202413,598319,48287,54983,113503,742(9,503)494,239
(Euro 000's)NoteShare capitalShare premium (1)Other reservesAccum. ProfitsTotalNCITotal equity
At 1 January 202313,596319,41169,80570,483473,295(6,998)466,297
Profit for the period---11,36911,369(265)11,104
Change in fair value of financial assets through OCI--6-6-6
Total comprehensive income--611,36911,375(265)11,110
Issuance of share capital14-------
Recognition of share-based payments15-------
Recognition of depletion factor15-------
Recognition of non-distributable reserve15-------
Recognition of-distributable reserve15-------
Other changes in equity-------
At 31 March 202313,596319,41169,81181,852484,670(7,263)477,407
(Euro 000's)NoteShare capitalShare premium (1)Other reservesAccum. ProfitsTotalNCITotal equity
Audited
At 1 January 202313,596319,41169,80570,483473,295(6,998)466,297
Profit for the period---38,76938,769(2,106)36,663
Change in fair value of financial assets through OCI--(3)-(3)-(3)
Total comprehensive income--(3)38,76938,766(2,106)36,660
Recognition of share-based payments15--661-661-661
Other changes in equity---252252-252
Dividends paid11---(11,478)(11,478)-(11,478)
At 31 December 202313,596319,41170,46398,026501,496(9,104)492,392

The share premium reserve is not available for distribution

Unaudited Interim Condensed Consolidated Statement of Cash Flows

(All amounts in Euro thousands unless otherwise stated)

For the period ended 31 March 2024 and 2023

(Euro 000's)NoteThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Cash flows from operating activities
Profit before tax2,12613,577
Adjustments for:
Depreciation of property, plant and equipment89,0267,678
Amortisation of intangibles95791,084
Recognition of share-based payments1515176
Interest income5(535)(226)
Interest expense5511510
Unwinding of discounting on mine rehabilitation provision17107553
Other provisions17-53
Net foreign exchange differences3(1,571)1,222
Unrealised foreign exchange gain/(loss) on financing activities1,035(404)
Cash inflows from operating activities before working capital changes11,42924,123
Changes in working capital:
Inventories10(2,244)3,930
Trade and other receivables12(2,679)7,435
Trade and other payables16(6,213)(20,994)
Provisions17(271)(148)
Cash flows from operations2214,346
Tax paid(1,242)(1,467)
Interest on leases liabilities5(7)(7)
Interest paid5(510)(510)
Net cash from operating activities(1,737)12,362
Cash flows from investing activities
Purchase of property, plant and equipment8(17,853)(8,845)
Purchase of intangible assets9(272)(31)
Interest received524865
Net cash used in investing activities(17,877)(8,811)
Cash flows from financing activities
Lease payments19(210)(151)
Net (Repayments) from borrowings18(16,599)(9,280)
Net cash from financing activities(16,809)(9,431)
Net decrease in cash and cash equivalents(36,423)(5,880)
Net foreign exchange difference31,571(1,222)
Cash and cash equivalents :
At beginning of the period121,007126,448
At end of the period86,155119,346

Notes to the Unaudited Interim Condensed Consolidated Financial Statements

(All amounts in Euro thousands unless otherwise stated)

For the period ended 31 March 2024 and 2023

Incorporation and summary of business

The Company was first listed on the Alternative Investment Market (AIM) of the London Stock Exchange in May 2005, trading under the symbol ATYM. On 29 April 2024, the Company was admitted to the premium listing segment of the Official List maintained by the FCA and to trading on the main market of the London Stock Exchange.

Additional information about Atalaya Mining Plc is available at www.atalayamining.com.

Change of name and share consolidation

Following the Company's Extraordinary General Meeting ("EGM") on 13 October 2015, the change of name from EMED Mining Public Limited to Atalaya Mining Plc became effective on 21 October 2015. On the same day, the consolidation of ordinary shares came into effect, whereby all shareholders received one new ordinary share of nominal value Stg £0.075 for every 30 existing ordinary shares of nominal value Stg £0.0025.

Principal activities

Proyecto Riotinto

Proyecto Touro

In November 2019, Atalaya executed the option to acquire 12.5% of Explotaciones Gallegas del Cobre, S.L. the exploration property around Touro, with known additional reserves, which will provide high potential to the Proyecto Touro.

Proyecto Masa Valverde

On 21 October 2020, the Company announced that it entered into a definitive purchase agreement to acquire 100% of the shares of Cambridge Mineria España, S.L. (since renamed Atalaya Masa Valverde, S.L.U.), a Spanish company which fully owns the Masa Valverde polymetallic project located in Huelva (Spain). Under the terms of the agreement Atalaya will make an aggregate €1.4 million cash payment in two instalments of approximately the same amount. The first payment is to be executed once the project is permitted and second and final payment when first production is achieved from the concession.

In November 2023, the exploitation permits for the Masa Valverde and Majadales deposits was officially granted.

Proyecto Ossa Morena

In December 2021, Atalaya announced the acquisition of a 51% interest in Rio Narcea Nickel, S.L., which owns 9 investigation permits. The acquisition also provided a 100% interest in three investigation permits that are also located along the Ossa- Morena Metallogenic Belt. In Q3 2022, Atalaya increased its ownership interest in POM to 99.9%, up from 51%, following completion of a capital increase that will fund exploration activities. During 2022 Atalaya rejected 8 investigation permits.

Atalaya will pay a total of €2.5 million in cash in three instalments and grant a 1% net smelter return ("NSR") royalty over all acquired permits. The first payment of €0.5 million will be made following execution of the purchase agreement. The second and third instalments of €1 million each will be made once the environmental impact statement ("EIS") and the final mining permits for any project within any of the investigation permits acquired under the Transaction are secured.

Proyecto Riotinto East

In December 2020, Atalaya entered into a Memorandum of Understanding with a local private Spanish company to acquire a 100% beneficial interest in two investigation permits (known as Peñas Blancas and Cerro Negro investigation permits), which are located immediately to the east of Proyecto Riotinto.

Basis of preparation and accounting policies

2.1 Basis of preparation

Overview

These condensed interim financial statements are unaudited.

The unaudited interim condensed consolidated financial statements for the period ended 31 March 2024 have been prepared in accordance with International Accounting Standard 34: Interim Financial Reporting. IFRS comprise the standard issued by the International Accounting Standard Board ("IASB"), and IFRS Interpretations Committee ("IFRICs") as issued by the IASB. Additionally, the unaudited interim condensed consolidated financial statements have also been prepared in accordance with the IFRS as adopted by the European Union (EU), using the historical cost convention and have been prepared on a historical cost basis except for the revaluation of certain financial instruments that are measured at fair value at the end of each reporting period, as explained below.

Going concern

These unaudited condensed interim consolidated financial statements have been prepared based on accounting principles applicable to a going concern which assumes that the Group will realise its assets and discharge its liabilities in the normal course of business. Management has carried out an assessment of the going concern assumption and has concluded that the Group will generate sufficient cash and cash equivalents to continue operating for the next twelve months.

2.2 New standards, interpretations and amendments adopted by the Group

Several amendments and interpretations apply for the first time in 2024, but do not have a material impact on the unaudited condensed interim consolidated financial statements of the Group.

The amendments are effective for annual reporting periods beginning on or after January 1, 2024, with earlier application permitted, and will need to be applied retrospectively in accordance with IAS 8. The objective of the amendments is to clarify the principles in IAS 1 for the classification of liabilities as either current or non-current. The amendments clarify the meaning of a right to defer settlement, the requirement for this right to exist at the end of the reporting period, that management intent does not affect current or non-current classification, that options by the counterparty that could result in settlement by the transfer of the entity's own equity instruments do not affect current or non-current classification. Also, the amendments specify that only covenants with which an entity must comply on or before the reporting date will affect a liability's classification. Additional disclosures are also required for non-current liabilities arising from loan arrangements that are subject to covenants to be complied with within twelve months after the reporting period. The amendments had no material impact on the Group's unaudited condensed interim consolidated financial statements.

IFRS 16 Leases: Lease Liability in a Sale and Leaseback (amendments)

The amendments are effective for annual reporting periods beginning on or after January 1, 2024, with earlier application permitted. The amendments are intended to improve the requirements that a seller-lessee uses in measuring the lease liability arising in a sale and leaseback transaction in IFRS 16, while it does not change the accounting for leases unrelated to sale and leaseback transactions. In particular, the seller-lessee determines 'lease payments' or 'revised lease payments' in such a way that the seller-lessee would not recognise any amount of the gain or loss that relates to the right of use it retains. Applying these requirements does not prevent the seller-lessee from recognising, in profit or loss, any gain or loss relating to the partial or full termination of a lease. A seller-lessee applies the amendment retrospectively in accordance with IAS 8 to sale and leaseback transactions entered into after the date of initial application, being the beginning of the annual reporting period in which an entity first applied IFRS 16. The amendments had no material impact on the Group's unaudited condensed interim consolidated financial statements.

The amendments are effective for annual reporting periods beginning on or after January 1, 2024, with earlier application permitted. The amendments supplement requirements already in IFRS and require an entity to disclose the terms and conditions of supplier finance arrangements. Additionally, entities are required to disclose at the beginning and end of reporting period the carrying amounts of supplier finance arrangement financial liabilities and the line items in which those liabilities are presented as well as the carrying amounts of financial liabilities and line items, for which the finance providers have already settled the corresponding trade payables. Entities should also disclose the type and effect of non-cash changes in the carrying amounts of supplier finance arrangement financial liabilities, which prevent the carrying amounts of the financial liabilities from being comparable. Furthermore, the amendments require an entity to disclose at the beginning and end of the reporting period the range of payment due dates for financial liabilities owed to the finance providers and for comparable trade payables that are not part of those arrangements. The amendments have not yet been endorsed by the EU. The amendments had no material impact on the Group's unaudited condensed interim consolidated financial statements.

IAS 21 The Effects of Changes in Foreign Exchange Rates: Lack of Exchangeability (Amendments)

The amendments are effective for annual reporting periods beginning on or after January 1, 2025, with earlier application permitted. The amendments specify how an entity should assess whether a currency is exchangeable and how it should determine a spot exchange rate when exchangeability is lacking. A currency is considered to be exchangeable into another currency when an entity is able to obtain the other currency within a time frame that allows for a normal administrative delay and through a market or exchange mechanism in which an exchange transaction would create enforceable rights and obligations. If a currency is not exchangeable into another currency, an entity is required to estimate the spot exchange rate at the measurement date. An entity's objective in estimating the spot exchange rate is to reflect the rate at which an orderly exchange transaction would take place at the measurement date between market participants under prevailing economic conditions. The amendments note that an entity can use an observable exchange rate without adjustment or another estimation technique. The amendments had no material impact on the Group's unaudited condensed interim consolidated financial statements.

2.3 Fair value estimation

Fair value measurements recognised in the consolidated statement of financial position

2.3 Fair value estimation

Financial assets or liabilitiesLevel 1Level 2Level 3Total
(Euro 000's)
31 Mar 2024
Other financial assets
Financial assets at FV through OCI27-1,1011,128
Trade and other receivables----
Receivables (subject to provisional pricing)-14,158-14,158
Total2714,1581,10115,286
31 Dec 2023
Other financial assets
Financial assets at FV through OCI33-1,1011,134
Trade and other receivables-
Receivables (subject to provisional pricing)-15,164-15,164
Total3015,1641,10116,295

2.4 Critical accounting estimates and judgements

Business and geographical segments

Business segments

Copper concentrates produced by the Group are sold to three off-takers as per the relevant offtake agreements. In addition, the Group enters into spot agreements for the concentrates not committed to off-takers.

Geographical segments

Revenue - from external customersThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
€'000€'000
Switzerland69,93891,171
Revenue - from external customersThree month period ended 31 Mar 2024Three month period ended 31 Mar 2023
€'000€'000
Cyprus5,2276,589
Spain64,71184,582
69,93891,171
Non-current assets31 Mar 202431 Dec 2023
€'000€'000
Spain442,554434,136
442,554434,136

Revenue represents the sales value of goods supplied to customers; net of value added tax. The following table summarises sales to customers with whom transactions have individually exceeded 10.0% of the Group's revenues.

(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Segment€'000Segment€'000
Offtaker 1Copper19,701Copper14,396
Offtaker 2Copper26,101Copper27,892
Offtaker 3Copper24,136Copper48,866
4. Revenue
(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Revenue from contracts with customers (1)73,71888,313
Fair value (losses)/gains relating to provisional pricing within sales (2)(3,780)2,858
Total revenue69,93891,171
  • Included within Q1 2024 revenue there is a transaction price of €3.1 million (€2.4 million in Q1 2023) related to the freight services provided by the Group to the customers arising from the sales of copper concentrate under CIF incoterm.
  • Net Finance Costs
(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Interest expense
Other interest(511)(510)
Interest on lease liabilities(7)(7)
Unwinding of discount on mine rehabilitation provision (Note 17)(107)(553)
Interest income
Financial interest (1)535226
(90)(844)
  • Interest income mainly related to interest received on bank balances.
  • Tax
(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Income taxes
Current (income) tax/expense(499)2,473
(Income) tax/expense recognised in statement of profit and loss(499)2,473
7. Earnings per share
(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Profit attributable to equity holders of the parent2,02611,369
Weighted number of ordinary shares for the purposes of basic earnings per share (000's)139,889139,880
Basic earnings per share (EUR cents/share)1.58.1
Weighted number of ordinary shares for the purposes of fully diluted earnings per share (000's)144,728143,423
Fully diluted earnings per share (EUR cents/share)1.47.9

At 31 March 2024 there are nil warrants (Note 14) and 4,828,500 options (Note 14) (31 March 2023: nil warrants and 3,543,500 options) which have been included when calculating the weighted average number of shares for 2024.

Property, plant and equipment

(Euro 000's)Land and buildingsRight-of-use assetsPlant and machineryAssets under construction (1)Deferred mining costs (2)Other assets (3)Total
Cost
At 1 January 202380,3267,076291,33550,23552,358872482,202
Additions--1,4096,9771,868-10,254
Reclassifications--1,543(1,543)---
Increase in rehab. Provision120-----120
At 31 March 202380,4467,076294,28755,66954,226872492,576
Additions36-4,60235,1729,8467949,735
Increase in rehab. Provision3,025-----3,025
Reclassifications--20,240(20,240)---
Advances10-----10
Write-off-
At 31 December 202383,5177,076319,12970,60164,072951545,346
Adjustments--5---5
Opening adjusted83,5177,076319,13470,60164,072951545,351
Additions--1,67016,188--17,858
Increase in rehab. Provision475-----475
Reclassifications--242(242)---
Write-off-(148)(439)---(587)
At 31 March 202483,9926,928320,60786,54764,072951563,097
Depreciation
At 1 January 202320,4541,99889,182-14,921739127,294
Adjustments--6---6
Opening adjusted20,4541,99889,188-14,921739127,300
Charge for the period9846035,277-816(2)7,678
At 31 March 202321,4382,60194,465-15,737737134,978
Charge for the period3,264(70)19,082-3,3262725,629
At 31 December 202324,7022,531113,547-19,063764160,607
Adjustments--1---1
Opening adjusted24,7022,531113,548-19,063764160,608
Charge for the period1,9871175,798-1,170119,083
Write-off-(57)----(57)
At 31 March 202426,6892,591119,346-20,233775169,634
Net book value
At 31 March 202457,3034,337201,26186,54743,839176393,463
At 31 December 202358,8154,545205,58270,60145,009187384,739
  • Assets under construction at 31 March 2024 were €86.5 million (31 Dec 2023: €70.6 million) which include sustaining capital expenditures, tailings dams project, ELIX plant, solar plant and the San Dionisio area.
  • Stripping costs excluding San Dionisio

The above fixed assets are mainly located in Spain.

Intangible assets

(Euro 000's)PermitsLicences, R&D and softwareTotal
Cost
At 1 January 202381,2558,64289,897
Additions31-31
At 31 March 202381,2868,64289,928
Additions113116229
Disposals(200)-(200)
At 31 December 202381,1998,75889,957
Additions272-272
At 31 March 202481,4718,75890,229
Amortisation
At 1 January 202327,6278,44036,067
Charge for the period1,066181,084
At 31 March 202328,6938,45837,151
Charge for the period3,387223,409
At 31 December 202332,0808,48040,560
Charge for the period5727579
At 31 March 202432,6528,48741,139
Net book value
At 31 March 202448,81927149,090
At 31 December 202349,11927849,397

Increase of permits related to the capitalisation of Proyecto Masa Valverde.

Inventories

(Euro 000's)31 Mar 202431 Dec 2023
Finished products8,7828,416
Materials and supplies23,25521,852
Work in progress3,5213,046
Total inventories35,55833,314

As of 31 March 2024, copper concentrate produced and not sold amounted to 8,283 tonnes (31 Dec 2023: 6,722 tonnes). Accordingly, the inventory for copper concentrate was €8.8 million (31 Dec 2023: €8.4 million).

During Q1 2024 the Group recorded cost of sales amounting to €56.8 million (Q1 2023: €63.0 million).

Dividends paid

Cash dividends declared and paid during the period:

(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Dividends declared and paid--
Interim dividend declared and paid--

A final dividend of US$0.04 in respect of 2023 was proposed on 18 March 2024 for approval by shareholders at the 2024 AGM. This will result in a total dividend for 2023 of US$0.09 per share.

Trade and other receivables

(Euro 000's)31 Mar 202431 Dec 2023
Non-current
Deposits306307
Loans234233
Prepayments for service contract23,76323,476
Other non-current receivables2,6862,686
26,98926,702
Current
Trade receivables at fair value - subject to provisional pricing11,07610,110
Trade receivables from shareholders at fair value - subject to provisional pricing (Note 22.3)3,0825,054
Trade receivables from shareholders at amortised cost (Note 21.3)21-
Other receivables from related parties at amortised cost (Note 21.3)5656
Deposits3737
VAT receivables23,69021,003
Tax advances22-
Prepayments5,0105,855
Other current assets495782
43,48742,897
Allowance for expected credit losses--
Total trade and other receivables70,47669,599

Non-current deposits included €250k (€250k at 31 December 2023) as a collateral for bank guarantees, which was recorded as restricted cash (or deposit).

The prepayments for the service contract relate to an agreement entered into between the Group and Lain Technologies Ltd for the construction of an industrial plant using the E-LIX technology, which is currently under construction at Proyecto Riotinto. This technology system is a newly developed electrochemical extraction process that utilises singular catalysts and physiochemical conditions to dissolve the valuable metals contained within sulphide concentrates. Lain Technologies Ltd. developed and fully owns the E-LIX System. According to the agreement, once the Industrial Plant at Proyecto Riotinto is operational, the Group will have access to (i) the use of E-LIX Technology to extract cathodes and (ii) exclusivity in the use of the E-LIX Technology on concentrates extracted from the Iberian Pyrite Belt for eight years.

Cash and cash equivalents

( Euro 000's )31 Mar 202431 Dec 2023
Unrestricted cash and cash equivalents at Group level58,89594,868
Unrestricted cash and cash equivalents at Operation level27,26026,139
Consolidated cash and cash equivalents86,155121,007

The table above provides a comprehensive overview of the cash and cash equivalents held by Atalaya as of 31 March 2024.

Cash and cash equivalents denominated in the following currencies:

(Euro 000's)31 Mar 202431 Dec 2023
Euro - functional and presentation currency43,37450,470
Great Britain Pound12652
United States Dollar42,65570,485
Consolidated cash and cash equivalents86,155121,007
14. Share capital and share premium
Shares 000'sShare Capital Stg£'000Share premium Stg£'000Total Stg£'000
Authorised
Ordinary shares of Stg £0.075 each*200,00015,000-15,000
Issued and fully paidSharesShare CapitalShare premiumTotal
Issue DatePrice (£)Details000's€'000€'000€'000
31 December 2022/1 January 2023139,88013,596319,411333,007
31-Dec-23139,88013,596319,411333,007
14-Feb-243.090Exercised share options (a)2027173
31-Mar-24139,89913,598319,482333,080

Authorised capital

The Company's authorised share capital is 200,000,000 ordinary shares of Stg £0.075 each.

Issued capital

  • On 9 February 2024, the Company announced that it has issued 20,000 ordinary shares of 7.5p in the Company ("Option Shares") pursuant to an exercise of share options by an employee.

No share issuance has taken place in FY2023.

The Company's share capital at 31 March 2024 is 139,899,209 ordinary shares of Stg £0.075 each.

Details of share options outstanding as at 31 March 2024:

Grant dateExpiry dateExercise price £Share options
29 May 201928 May 20242.015666,500
30 June 202029 June 20301.475516,000
24 June 202123 June 20313.090996,000
26 January 202225 January 20324.160120,000
22 June 202230 June 20273.5751,225,000
22 May 202330 May 20283.2701,305,000
Total4,828,500
Weighted average exercise price £Share options
At 1 January 20242.8574,848,500
Granted during the year--
Options executed during the year3.090(20,000)
31 Mar 20242.9674,828,500

Warrants

As at 31 March 2024 and 2023 there were no warrants.

Other reserves

(Euro 000's)Share optionBonus shareDepletion factor (1)FV reserve of financial assets at FVOCI (2)Non-Distributable reserve (3)Distributable reserve (4)Total
At 1 January 202310,36520837,778(1,153)8,31614,29169,805
Change in fair value of financial assets at fair value through OCI---6--6
At 31 March 202310,36520837,778(1,147)8,31614,29169,811
Recognition of share-based payments661-----661
Change in fair value of financial assets at fair value through OCI---(9)--(9)
At 31 December 202311,02620837,778(1,156)8,31614,29170,463
Recognition of share-based payments151-----151
Recognition of non-distributable reserve----142-142
Recognition of distributable reserve-----9,2979,297
Recognition of depletion factor--7,500---7,500
Change in fair value of financial assets at fair value through OCI---(4)--(4)
At 31 March 202411,17720845,278(1,160)8,45823,58887,549

Depletion factor reserve

At 31 March 2024, the Group has recognised €7.5 million (31 March 2023: €nil million) as a depletion factor reserve as per the Spanish Corporate Tax Act.

  • Fair value reserve of financial assets at FVOCI
  • Non-distributable reserve
  • Distributable reserve

The Group reclassified at least 10% of the profit of 2023 to distributable reserves.

Trade and other payables

(Euro 000's)31 Mar 202431 Dec 2023
Non-current
Other non-current payables2,0032,003
Government grant202202
2,2052,205
Current
Trade payables65,39970,303
Trade payables to shareholders (Note 22.3)-179
Accruals3,5953,395
VAT payables355391
Other3591,654
69,70875,922

Other non-current payables are related with the acquisition of Atalaya Ossa Morena SL (former Rio Narcea Nickel SL).

Provisions

(Euro 000's)Other provisionsLegal costsRehabilitation costsTotal costs
At 1 January 20231,43522623,37425,035
Use of provision--(148)(148)
Increase in provision--120120
Finance cost--553553
At 31 March 20231,43522623,89925,560
Additions-1-1
Use of provision(685)-(370)(1,055)
Reversal of provision--3,0253,025
Finance cost--137137
At 31 December 202375022726,69127,668
Use of provision--(271)(271)
Increase in provision--475475
Finance cost--107107
At 31 March 202475022727,00227,979
(Euro 000's)31 Mar 202431 Dec 2023
Non-current27,81627,234
Current163434
Total27,97927,668

Rehabilitation provision

The discount rate used in the calculation of the net present value of the liability as at 31 March 2024 was 3.62% (2023: 3.62%), which is the 15-year Spain Government Bond rate for 2023. An inflation rate of 1%-5.70% (2023: 1%-5.70%) is applied on annual basis.

Legal provision

The Group has been named a defendant in several legal actions in Spain, the outcome of which is not determinable as at 31 Martch 2024. Management has individually reviewed each case and established a provision of €0.2 million as of 31 March 2024 (€0.2 million at 31 December 2023) for these claims, which has been reflected in these unaudited condensed interim consolidated financial statements.

Other provisions

Other provisions are related with the called-up equity holdings of Atalaya Masa Valverde S.L.

Borrowings

(Euro 000's)31 Mar 202431 Dec 2023
Non-current borrowings
Credit facilities13,55616,131
13,55616,131
Current borrowings
Credit facilities36,53250,556
36,53250,556

The Group had credit approval for facilities totalling €125.4 million (€103.8 million at 31 December 2023). During 2023, Atalaya drew down some of its existing credit facilities to financing the construction of 50 MW solar plant (outstanding balance of €18.5 million at 31 March 2024) and in 2022 to pay the Deferred Consideration.

Borrowing with fixed interest rates range from 1.75% to 2.45% with an average fixed interest rate of 2.10%. Margins on borrowing with variable interest rates, usually 12 months EURIBOR, range from 0.95% to 2.25% with an average margin of 1.36%.

At 31 March 2024, the Group had used €50.1 million of its facilities and had undrawn facilities of €75.3 million.

Lease liabilities

(Euro 000's)31 Mar 202431 Dec 2023
Non-current
Lease liabilities3,6813,877
3,6813,877
Current
Lease liabilities487501
487501

Lease liabilities

The Group entered into lease arrangements for the renting of land which is subject to the adoption of all requirements of IFRS 16 Leases. The Group has elected not to recognise right-of-use assets and lease liabilities for short-term leases that have a lease term of 12 months or less and leases of low-value assets. Depreciation expense regarding leases amounts to €0.1 million (Q1 2023: €0.6 million) for the three month period ended 31 March 2024. The land lease is set for a duration of thirteen years, with payments due at the beginning of each month, increasing annually by an average of 1.5%. As of 31 March 2024, the remaining term of this lease is nine years.

(Euro 000's)31 Mar 202431 Dec 2023
Minimum lease payments due:
- Within one year487501
- Two to five years1,8771,928
- Over five years1,8041,949
Present value of minimum lease payments due4,1684,378
(Euro 000's)Lease liabilities
At 1 January 20234,378
Interest expense7
Lease payments(129)
Write-off(88)
At 31 March 20244,168
At 31 March 2024
Non-current liabilities3,681
Current liabilities487

4,168

Acquisition, incorporation and disposal of subsidiaries

There were no acquisitions or incorporation of subsidiaries during the three month period ended 31 March 2024 and 2023.

Winding-up of subsidiaries

There were no operations wound up during the three month period ended 31 March 2024 and 2023.

Related party transactions

The following transactions were carried out with related parties:

22.1 Compensation of key management personnel

(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Directors' remuneration and fees297360
Share option-based benefits and other benefits to directors4820
Key management personnel fees149204
Share option-based and other benefits to key management personnel4820
541604

22.2 Share-based benefits

The directors and key management personnel have not been granted any options during the three-month period ended 31 March 2024 (Q1 2023: nil).

22.3 Transactions with related parties/shareholders

Transaction with shareholders

(Euro 000's)Three month period ended 31 Mar 2024Three month period ended 31 Mar 2023
Trafigura Pte Ltd- Revenue from contracts (a)19,94612,294
(Losses)/gains relating provisional pricing within sales(245)2,103
19,70114,397
Impala Terminals Huelva S.L.U. - Port Handling and Warehousing services (b)(417)(566)
Trafigura - Total revenue from contracts19,28413,831

Offtake agreement and spot sales to Trafigura

Offtake agreement

During Q1 2024, the Company completed 3 sales transactions under the terms of the 2015 Offtake Agreements valued at €19.7 million (Q1 2023: 5 sales valued at €14.4 million).

Spot Sales Agreements

In Q1 2024, the Company completed nil spot sales (Q1 2023: nil spot sales valued at €nil) There was an adjustment of negative €1.0 million in Q1 2024 which related to QP adjustments registered in Q1 2024 relating to spot sales made in the previous year.

Port Handling and Warehousing services

As at 31 March 2024, Impala Terminals was part of the Trafigura Group, under joint control.

Period-end balances with related parties

(Euro 000's)31 Mar 202431 Dec 2023
Receivables from related parties:
Recursos Cuenca Minera S.L.5656
Total (Note 12)5656

The above balances bear no interest and are repayable on demand.

Period-end balances with shareholders

(Euro 000's)31 Mar 202431 Dec 2023
Receivable from shareholder (Note 12)
Trafigura - Debtor balance- subject to provisional pricing3,0825,054
Trafigura - Debtor balance- at amortised cost21-
3,1035,054
Payable from joint venture of shareholder (Note 16)
Impala Terminals Huelva S.L.U. - Payable balance-(179)
-(179)

Contingent liabilities

Judicial and administrative cases

Commitments

There are no minimum exploration requirements at Proyecto Riotinto. However, the Group is obliged to pay local land taxes which currently are approximately €235,000 per year in Spain and the Group is required to maintain the Riotinto site in compliance with all applicable regulatory requirements.

In 2012, ARM entered into a 50/50 joint venture with Rumbo to evaluate and exploit the potential of the class B resources in the tailings dam and waste areas at Proyecto Riotinto (mainly residual gold and silver in the old gossan tailings). Under the joint venture agreement, ARM will be the operator of the joint venture, will reimburse Rumbo for the costs associated with the application for classification of the Class B resources and will fund the initial expenditure of a feasibility study up to a maximum of €2.0 million. Costs are then borne by the joint venture partners in accordance with their respective ownership interests.

  • Significant events
  • On 9 February 2024, the Company issued 20,000 ordinary shares of 7.5p in the Company pursuant to an exercise of share options by a former employee.
  • Events after the Reporting Period
  • On 25 April 2022, BlackRock, Inc., shareholder of the Company, decreased its voting rights from 4.07% to 4.05%, and on 26 April decreased its voting rights to 3.97%.
  • On 7 May 2024, the Company issued 66,500 ordinary shares of 7.5p in the Company pursuant to an exercise of share options by non-PDMR employees.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note