CatalystWireBeta

High-grade initial drill results at Lithium Ridge

In brief · summary, not quotable

Andrada Mining Limited has announced significant high-grade drill results from its Lithium Ridge project, confirming continuity and scale of lithium mineralization from surface to 160 meters depth, with notable intercepts including 9.63m at 2.12% Li₂O in LRD003 and 24.44m at 1.38% Li₂O in LRD010. The drilling also revealed meaningful associated tin and tantalum mineralization, such as 2.57m at 1.98% Sn and 227ppm Ta in LRD001, reinforcing the project's potential as a polymetallic asset. These results are part of an ongoing Stage 1 exploration program under an earn-in agreement with SQM, which could see SQM acquire a 30% interest.

Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your ATM notes

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF) ("Andrada"), a tin producer with a portfolio of critical minerals mining and exploration assets in Namibia, is pleased to announce high-grade intersections from the initial batch of diamond drilling results at Lithium Ridge ("Lithium Ridge" or the "Project") which is being advanced in partnership with Sociedad Química y Minera de Chile SA through its subsidiary SQM Australia (Pty) Ltd ("SQM"). The drilling confirms high-grade lithium mineralisation from surface to drill depth, together with meaningful tin and tantalum mineralisation, reinforcing Lithium Ridge's potential to evolve into a large-scale, long-life polymetallic asset. These results are part of the ongoing Stage 1 exploration programme under the previously announced earn-in agreement, pursuant to which SQM may earn a 30% interest in the Project.

HIGHLIGHTS

§ Consistent mineralisation: Lithium mineralisation was intersected in most of the holes reported, confirming mineralisation from surface down to a depth of 160m (LDR011).

§ Significant lithium intercepts: selected noteworthy and high-grade lithium intercepts include;

− Drill hole LRD003: 9.63m @ 2.12% Li2O from 36.66m to 46.29m

including 5.74m @ 3.02% Li2O from 38.00m to 43.74m

− Drill hole LRD010: 24.44m @ 1.38% Li2O from 55.44m to 79.88m

Including 14.57m @ 1.73% Li2O from 64.87m to 79.44m

− Drill hole LRD011: 16.81m @ 1.51% Li2O from 68.30m to 85.11m

Including 4.81m @ 1.98% Li2O from 80.30m to 85.11m

§ Compelling polymetallic upside: significant associated tin (Sn) and tantalum (Ta) mineralisation with notable intersections including;

− Drill hole LRD001: 2.57m @ 1.98% Sn and 227ppm Ta from 70.88m to 73.45m

− Drill hole LRD011: 0.89m @ 1.33% Sn and 247ppm Ta from 88.46m to 89.35m

§ Stage 1 exploration programme progressing on schedule: regular updates to be published as results are received and milestones achieved.

Anthony Viljoen, Chief Executive Officer, commented:

"We are extremely pleased to announce these exceptional drill results from Lithium Ridge, which validate our confidence in this asset as a potential world-class lithium discovery. These drill results build on the recent high-grade grab sample results and show the continuity of lithium mineralisation at depth. The high-grade intersections, with results reaching up to 3.02% Li₂O, demonstrate the impressive nature of the mineralisation across the project area. These results not only confirm the continuity of lithium mineralisation from surface but also showcase the substantial polymetallic potential with meaningful tin and tantalum credits that will enhance project economics. Lithium Ridge clearly represents an early-entry opportunity for Andrada into Africa's emerging lithium sector, supported by our partnership with global leader SQM.

With drilling progressing on schedule and new spodumene-bearing pegmatites identified through the ongoing geological mapping campaign, we are confident that subsequent results from the Stage 1 drilling campaign will continue to build on this strong foundation."

Overview of results

The Stage 1 drill programme is progressing on schedule and has been designed to comprise approximately 14 000 metres of orientated diamond core drilling across 120 planned drill holes, to determine the depth extent and continuity of the pegmatites within the license area. The drill programme commenced in August 2025 and aims to test mineralisation within both previously known and recently discovered pegmatites. These results are for the first 15 holes representing 1 328 metres of drilling that yielded 496 samples for analysis, including QA/QC.

The results reported as "Whole Intersection" in Table 1 indicate pegmatite intersections from the top to the bottom contact. Where these intersections contain schistose xenoliths, reported results provide the metal content of the actual pegmatite intersections excluding the schistose intervals. Intersections reported as "Including", represent selected higher-grade intervals within the total intersection of the selected pegmatites. All the drill holes were drilled at inclined angles from the horizontal, and the reported pegmatite intersections should, therefore, be considered to represent apparent widths.

Hole IDDip Angle (Degrees)Intersection TypeFrom - To (metres)Length (m)Grades
Li₂O (%)Sn (%)Ta (ppm)
LRD001-60Whole Intersection61.79 - 62.040.250.010.06290
Whole Intersection70.88 - 73.452.570.501.98227
Whole Intersection78.49 - 79.350.860.060.3641
LRD002-60Whole Intersection29.85 - 40.1510.300.820.0550
Including36.09 - 37.091.003.410.0611
LRD003-60Whole Intersection35.17 - 35.850.680.150.1352
Whole Intersection36.66 - 46.299.632.120.0836
Including38.00 - 43.745.743.020.0830
LRD004-60Whole Intersection12.20 - 12.450.250.050.01112
Whole Intersection35.00 - 45.2510.251.020.0838
Including36.98 - 41.494.511.680.0325
LRD005-60Whole Intersection28.03 - 41.0212.990.600.05113
Including33.54 - 37.193.651.750.0448
Whole Intersection43.23 - 43.520.290.020.05121
LRD006-60Whole Intersection20.06 - 22.672.611.070.1149
Including20.42 - 21.421.002.120.0640
Whole Intersection23.13 - 23.900.770.210.4196
LRD007-60Whole Intersection30.95 - 32.431.480.100.2982
Whole Intersection36.55 - 40.273.720.180.2364
Whole Intersection41.58 - 42.210.630.200.1676
LRD008-60Whole Intersection13.32 - 16.603.281.320.2590
Whole Intersection24.43 - 24.900.470.020.05106
Whole Intersection25.15 - 25.710.560.180.06147
Whole Intersection34.42 - 34.990.570.100.09100
Whole Intersection35.69 - 36.921.230.120.06110
Whole Intersection38.62 - 45.116.491.030.29115
Whole Intersection48.03 - 49.571.541.260.5780
Whole Intersection51.26 - 67.9716.711.360.1141
Including52.26 - 56.924.662.000.1429
LRD009-60Whole Intersection81.84 - 83.671.830.090.18101
Whole Intersection161.37 - 163.692.320.090.1339
LRD010-60Whole Intersection22.13 - 22.380.251.050.26135
Whole Intersection22.63 - 24.011.380.440.23127
Whole Intersection37.69 - 38.340.650.240.09135
Whole Intersection55.44 - 79.8824.441.380.2371
Including64.87 - 79.4414.571.730.3254
Hole IDDip Angle (Degrees)Intersection TypeFrom - To (metres)Length (m)Grades
Li₂O (%)Sn (%)Ta (ppm)
LRD011-60Whole Intersection13.52 - 13.840.320.020.12256
Whole Intersection29.90 - 30.330.430.060.05263
Whole Intersection57.18 - 59.622.440.970.1588
Whole Intersection65.65 - 66.000.351.430.05129
Whole Intersection67.80 - 68.050.250.220.1759
Whole Intersection68.30 - 85.1116.811.510.2488
Including80.30 - 85.114.811.980.2170
Whole Intersection88.46 - 89.350.890.771.33247
Whole Intersection95.54 - 96.791.250.230.08283
Whole Intersection103.13 - 103.380.250.080.04150
Whole Intersection121.75 - 124.202.450.760.06112
Whole Intersection128.78 - 129.030.250.040.15228
Whole Intersection130.01 - 137.257.241.260.1058
Including131.43 - 136.705.271.510.1159
Whole Intersection143.95 - 144.400.450.060.20281
Whole Intersection145.75 - 146.000.250.090.16174
Whole Intersection150.06 - 150.310.250.120.2067
Whole Intersection152.17 - 153.311.140.220.1952
Whole Intersection161.71 - 166.124.411.330.1138
Including162.86 - 163.981.123.320.0410
Whole Intersection174.07 - 174.320.250.050.03201
LRD012-60Whole Intersection11.66 - 19.788.120.410.1951
Whole Intersection21.53 - 26.865.330.710.1585
LRD013-60Whole Intersection20.25 - 22.952.700.080.1747
LRD016-50Whole Intersection86.73 - 87.550.820.020.05174
Whole Intersection90.19 - 93.082.890.170.1457
LRD018-60Whole Intersection13.03 - 18.245.210.070.2531

Pegmatite intersections which have not met at least one of the metal contents cut off criteria (>0.25% Li₂O, >0.1% Sn or >99ppm Ta) have not been reported as they are not currently considered to be of economic significance. Spodumene has been visually identified as the primary lithium mineral by the geological teams on site. Tin and tantalum grades have been highlighted as these metals are considered indicative of lithium bearing pegmatites and present economic upside as potential byproducts. Downhole orientation surveys were undertaken for each hole at regular intervals while the hole was advancing and surveyed again in totality after drilling was completed. The surveys were done using a magnetic deviation probe that collected readings at two metre intervals. Collar locations were surveyed using a handheld GPS.

Each drill hole was geologically and structurally logged before being cut and sampled as quarter core. The sampling programme attempted to follow geological contacts while also maintaining consistency in data representativity. The shortest sampled length was 25cm while the longest length was limited to 125cm wherever possible. Once sampled, the material was submitted to SA Labs Ithuba for pulverisation and homogenisation, with the pulps subsequently dispatched to UIS Analytical Services for geochemical analysis. Both contractors are certified, independent laboratories. A sodium peroxide fusion coupled with ICP-OES analysis was used to determine Li and other major element concentrations, while lithium borate fusion with ICP-MS analysis was performed to determine Sn, Ta and other minor or trace element concentrations. No top cut was applied in calculating the weighted average grades for mineralised intersections within the pegmatites.

As previously announced, the Company will continue to provide regular updates as significant results are received and milestones achieved.

Figure 1: Map showing the locations of the completed and planned diamond drill (DD) holes (circles) from this campaign and the reverse circulation (RC) drill holes (triangles) completed during the 2023 campaign. The line A-A' represents the cross section in Figure 2.

Figure 2: Section line A-A' displaying a projection of the diamond drill hole, LDR011, for which results are reported in this announcement and the RC drill hole, ATNN20, which was drilled during the 2023 campaign. The mineralised intersections from LDR011 are reported in Table 1.

Glossary of abbreviations

%Symbol for percentage
DDDiamond Drill
ICP-MSInductively Coupled Plasma-Mass Spectrometry
ICP-OESInductively Coupled Plasma-Optical Emission Spectrometry
LiSymbol for Lithium
Li → Li₂OMetal to metal-oxide conversion factor of 2.153
Li₂OLithium oxide
PPMParts Per Million
RCReverse Circulation Drill
QA/QCQuality Assurance / Quality Control
SnSymbol for Tin
TaSymbol for Tantalum
Glossary of technical Terms
Apparent thicknessThe relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).
Dip AngleThe angle of inclination measured downward from horizontal.

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note