Operational and Financial Update
Impala-2 drilling underway with first oil expected January 2027; net debt $0.7m, cash $69.6m at 31 October 2026.
- Net Average Production (Jan-Oct 26) 5,869 bopd
- Crude Oil Sales $188.4 million
- Cash resources $69.6 million
- Net debt $0.7 million
- Revenue (10 months) $144.2 million
Select text to share a quote on X · sign in to keep highlights & notes in your AET notes
Afentra plc (‘Afentra’ or the ‘Company’) (AIM: AET), an upstream oil and gas company focused on production and development assets in Africa, is pleased to provide an operational and financial trading update for the 10 months ended 31 October 2026.
Key Highlights
Block 3/05 Drilling:
o Impala-2 drilling underway, first oil expected January 2027
o Pacassa SW sidetrack to follow, first oil expected end Q1 2027
- Net Average Production (Jan – Oct 26): 5,869 bopd1
- Crude Oil Sales: ~1.9 mmbbls sold at an average price of $98.2/bbl, representing total sales of $188.4 million2
- Financial Position: Cash of $69.6 million, net debt of $0.7 million at 31 October 2026
- Etu Acquisition: Government approval received; completion expected in coming weeks
- Kwanza Onshore: KON4 licence awarded, development work underway
Operational & Corporate Overview
Block 3/05 and Block 3/05A Asset Performance
Infill drilling and workover programme
- Impala-2: Spudded on 18 October 2026, with drilling and completion operations anticipated to take approximately 80 days. First oil is expected in January 2027 at an initial gross production rate of approximately 4,000 bopd.
- Impala-2 Funding: The joint venture partners have elected to fund Impala-2 directly rather than utilise the previously agreed carry mechanism. Direct funding allows Afentra to participate in production revenues from first oil and benefit from the full capital expenditure uplift available under the Production Sharing Contract. The agreed well cost cap of $60 million gross provides Afentra with protection against cost overruns.
- Pacassa SW: Delivered a successful oil discovery, encountering 136 metres of net oil pay. The well requires a sidetrack due to operational problems restricting access to the wellbore. Following completion of Impala-2, the Borr Grid rig will return to sidetrack and complete the well. The revised sequence allows Impala-2 to progress while final preparations and equipment mobilisation for the Pacassa SW sidetrack are completed. First oil from Pacassa SW is expected at the end of Q1 2027 following connection to the existing Pacassa production infrastructure.
Remapping of the Pacassa SW discovery is ongoing incorporating the discovery well results. This work is expected to confirm significant incremental oil resources of up to 70 mmbo as predicted prior to drilling the well.
- Hydraulic Workover Programme: Preparations for the workover programme have progressed and are now focussed on a one year campaign of up to eight wells. A workover unit has been identified and is expected to mobilise to Angola to start operations in H1 2027. This initial programme is expected to continue into 2028.
Production
- Gross average production for the ten months ended 31 October 2026 was 19,678 bopd (Block 3/05 19,281 bopd; Block 3/05A 397 bopd). Production was impacted by drilling related downtime associated with the positioning of the Borr Grid drilling unit at Pacassa and its subsequent relocation to Impala, as well as a planned shutdown of the gas compression system to improve gas distribution.
Revamping & Integrity
The multi-year redevelopment plan remains on track, underpinning increased reserves recovery and production growth.
o Water injection averaged ~50,000 bwpd during the period, with recent sustained rates of ~65,000 bwpd. Trials have achieved peak rates above 120,000 bwpd, confirming system capacity and work continues to increase sustained rates towards ~100,000 bwpd.
o Infrastructure upgrades progressed across key platforms, with work completed at Pambi and ongoing at Cobo and Palanca. Palanca FSO works were completed and formal recertification received for a further five-year period.
o Well intervention activities continue including slickline, electric line and acid stimulation. Impala-1 was brought back online in September at a constrained rate of approximately 2,000 bopd gross before being shut in to accommodate drilling at Impala-2.
Block 3/24
- Activities in support of the GPQ development progressed. Afentra safely completed its first operated offshore campaign, inspecting four GPQ subsea wellheads using a low-cost ROV operation. Subsurface and engineering studies continued to refine the phased development concept, with preparatory wellhead work planned and a final investment decision targeted for H1 2027.
Onshore Kwanza basin
- Quenguela Norte: Planning progressed for a potential pilot development involving the re-entry of four existing wells, targeting initial production during H2 2027. The pilot aims to prove the concept for a phased redevelopment of the Quenguela Norte field with limited initial capital investment.
- Exploration: Interpretation of the eFTG survey data, integrated with existing seismic, has identified a number of Tertiary age leads adjacent to the Quenguela Norte field in KON4 and further pre-salt and post-salt leads in KON15. A focused 2D seismic programme around Quenguela Norte is being evaluated for H1 2027 to better define the structures and support future drilling decisions. Acquisition of 300 km of 2D seismic on KON15 is now planned for Q1 2027.
Portfolio expansion
- Etu acquisition: Formal ministerial approval has been received for the acquisition of an additional 3.33% interest in Block 3/05 and 3.66% interest in Block 3/05A. The novation process is now underway, with completion expected in the coming weeks.
- KON4: The KON4 licence was formally awarded and signed.
Financial Overview (As at and for 10 months ended 31 October 2026)
- Revenue of $144.2 million3
- Cash resources of $69.6 million
- Total debt of $70.3 million4
- Net debt of $0.7 million
- Prepayment facility, $70 million drawn with a further $30 million available to draw until April 2027 and $25 million available from H2 2027
- Crude Oil Sales
o Total sales of 1,919,276 bbls, at an average price of $98.2/bbl, representing total sales of $188.4 million, comprising:
1,569,457 bbls lifted, generating $144.2 million of revenue; and
349,819 bbls contracted for sale, representing $44.2 million, lifting to be completed in November
o The next lifting of 450k bbls is expected in January 2027
- Hedging activity continued with approximately 38% of forecast 2027 sales hedged through collars, with a weighted average floor and cap price of $70.7/bbl and $104.1/bbl respectively5
Near-Term Catalysts
- Completion of the Etu transaction in coming weeks
- Completion of Impala-2, with first oil expected January 2027
- Completion of the Pacassa SW sidetrack, with first oil expected end of Q1 2027
- Operational update on the re-development of the KON4 Quenguela Norte field
- Update on the assessment of the exploration potential across the Kwanza Onshore portfolio
- Commencement of the Block 3/05 hydraulic workover programme planned for H1 2027
Paul McDade, Chief Executive Officer, Afentra plc commented:
"The spudding of Impala-2 opens a further area within Block 3/05 that can deliver material production and reserves growth with first oil planned for January 2027. This follows the material discovery at Pacassa SW where the planned sidetrack will follow Impala-2 providing an efficient pathway to bring both wells into production in Q1 2027. Our multi-year redevelopment plan remains on track, through targeted investment in drilling, workovers, asset integrity, water injection and infrastructure upgrades, underpinning increased reserves recovery, material production growth and cash flow generation.
Onshore, the award of KON4 provides both redevelopment and exploration potential. We are focused on building a low-cost position across the Kwanza basin, with work underway to assess a potential production pilot at the Quenguela Norte field, including the re-entry of legacy wells delivering production in H2 2027. Across the basin, we are using eFTG survey data to guide our 2D seismic planning for late 2026 and 2027.
Afentra will enter 2027 with cash resources and funding headroom that leave us well positioned to continue to unlock value through disciplined investment, technical and operational expertise, combined with our collaborative partnership model. The Etu transaction reflects this approach and, on completion, will increase our exposure to production, reserves and growth, while creating long-term value for all partners.”
Supporting presentation:
A supporting presentation can be found here on Afentra’s website.
Production figures are reported on a net (working interest) basis; net entitlement volumes are reflected in revenue and cash flow reporting.
Aggregate sales value comprises $144.2 million of recognised revenue from completed liftings and $44.2 million of contracted sales lifting to be completed in November, with revenue to be recognised upon completion of delivery.
Revenue is net of the state’s fiscal take (cost oil and profit oil allocation), but prior to deduction of petroleum income tax (PIT).
Total Debt comprises debt principal drawn adjusted for accrued interest, capitalised costs and lease liabilities.
Refer to the accompanying investor presentation for further details of the Company's hedge portfolio, including collar structures, floor prices and ceiling prices.
Glossary
| bbl | Barrel |
| bbls | barrels |
| bopd | barrels of oil per day |
| bwpd | barrels of water injected per day |
| eFTG | enhanced Full Tensor Gravity Gradiometry |
| FSO | floating storage and offloading unit |
| GPQ | Golungo-Palanca NE-Quissama |
| mmbbls | million barrels |
| mmbo | million barrels of oil |
| mmboe | million barrels of oil equivalent |
| PIT | petroleum income tax |
| ROV | remotely operated vehicle |
Standard
Technical Information
Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.