88 Energy's quarterly activities report ending September 30, 2025, reveals key developments across its Alaskan and Namibian portfolios. Farm-out activity progressed at Project Phoenix, targeting a mid-CY2026 spud for the Franklin Bluffs-1H well. Planning advanced for the Tiri-1 exploration well at Project Leonis, targeting Q1'27 for drilling. In Namibia, a 12-month extension was granted for the PEL 93 First Renewal Exploration Period, with a high-resolution gravity survey planned for Q1 CY26. The divestment of Project Longhorn was completed for US$3.25 million before adjustments, avoiding US$2 million per well development costs. The company's cash balance stood at A$8.3 million as of September 30, 2025.

Full announcement

Select text to share a quote on X · sign in to keep highlights & notes in your 88E notes

88 Energy Limited (ASX: 88E, AIM: 88E, OTC: EEENF) (88 Energy, 88E or the Company) provides the following summary of activities for the quarter ended 30 September 2025

Alaskan Portfolio Highlights

Project Phoenix, Alaska (75% WI)

Farm-Out Activity and Work Program Progressing:

Ø Joint venture partner Burgundy Xploration LLC (Burgundy) advanced it's funding strategy and met all 2025 JV lease rental obligations.

Ø Planning for the Franklin Bluffs-1H horizontal well and extended flow test continued, targeting mid-CY2026 spud.

Ø The well will target the SMD-B reservoir, part of the Campanian sequence, the best-developed topset sandstone in the SMD series at Project Phoenix.

Ø Adjacent operator, Pantheon Resources confirmed a 565ft hydrocarbon column in the SMD-B reservoir at Dubhe-1, exceeding pre-drill expectations by 26%[1]. Additional hydrocarbon zones encountered in the SMD-C and two Slope Fan horizons highlighted the broader prospectivity.

Ø Licensing of the Great Bear 3D dataset enhanced planning and provided improved subsurface understanding across Project Leonis and Project Phoenix.

Project Leonis, Alaska (100% WI)

Planning Progressed for Tiri-1 Exploration Well:

Ø Planning and permitting advanced for the proposed Tiri-1 exploration well, to test the Canning and USB Prospects, with additional deeper reservoir potential under review.

Ø All key vendors submitted operational proposals, contributing to a robust well Authority for Expenditure (AFE).

Ø 88 Energy's 100% working interest positions the Company favourably to secure a material carry through the active farm-out process, with third party evaluation ongoing for a well in Q1'27.

Ø Permitting and operations planning remain in an advanced state, ready to resume in mid-CY26.

Namibian Portfolio Highlights

PEL93 Namibia (20% WI)

Licence Extension and Pre-Drill De-Risking Underway:

Ø The Namibian Ministry of Mines and Energy granted a 12-month extension to the PEL 93 First Renewal Exploration Period, now expiring in October 2026.

Ø A high-resolution gravity survey is planned for Q1 CY26, covering the southern area of PEL 93 where multiple structural leads have been identified.

Ø Regional activity continues to build, with nearby operator ReconAfrica drilling its Kavango West-1X exploration well that spud in July 2025. The well, which shares similar geological characteristics with Lead 9 in southern PEL 93.

Project Longhorn

Strategic Divestment Completed

Ø Divestment of 88E's 65% working interest in Project Longhorn completed, effective 1 July 2025, for US$3.25 million before adjustments.

Ø The divestment followed the Company's decision not to participate in the operator's multi-well program, avoiding exposure to estimated US$2 million per well development costs.

Corporate Activity

Ø Cash balance of A$8.3 million as at 30 September 2025.

Ø Small Holding Share Sale Facility closed on 1 August 2025. Sales of the parcels, (individually valued under A$500) remained in progress at quarter-end, with the proceeds to be distributed once all shares are sold, expected by year-end 2025.

Ø Mr. Philip Byrne retired as Non-Executive Chairman of 88 Energy Limited, effective 22 August 2025, succeeded by Ms. Joanne Williams.

Alaskan Portfolio Detail

Project Phoenix (~75% WI)

Joint Venture Partner Farm-Out Overview

Agreed terms with Burgundy to fully fund up to US$39 million (approx. A$60 million) of Project Phoenix's total gross future work program costs in exchange for up to an additional 50% Working Interest (WI) in Project Phoenix. Transaction provides the requisite funding pathway to advance Project Phoenix towards a final development decision via a two-phase farm-in arrangement:

Ø Phase 1: Burgundy to fund US$29 million (approx. A$45 million) for CY25/26 work program, including drilling of a horizontal well and production testing scheduled for mid-CY26 (88E fully carried; 88 Energy WI post Phase 1 farmout 35%).

Ø Phase 2: Upon Phase 1 Success; Burgundy to fund up to US$10 million (approx. A$15 million) for an additional well or other CAPEX program (88E carry up to US$7.5 million, based on current 75% WI; 88 Energy WI post Phase 2 farmout to 25%).

Franklin Bluffs-1H Horizontal Well and Extended Production Test

88 Energy continued to work with Burgundy to advance planning and permitting for the Franklin Bluffs-1H horizontal test well and flowback operation (FB-1H) scheduled for mid-CY26. FB-1H will target the SMD-B reservoir, one of the most promising zones identified at the Hickory-1 discovery well.

Burgundy appointed Fairweather LLC, a specialist Alaskan service provider, to manage permitting, well design, operations logistics, stimulation program and production test through the second half of 2025.

Completion of the Farm-out Participation Agreement remains subject to relevant government and other approvals, as well as customary conditions precent for farm-out transactions, and Burgundy securing Phase 1 funding by 31 December 2025, unless extended by mutual consent.

Geological Context of the SMD-B Reservoir

The SMD-B reservoir, part of the Campanian sequence, is the best-developed topset sandstone in the SMD series at Project Phoenix. The Hickory-1 well intersected 52 feet of net pay, with porosity ranging from 5-11%, while Icewine-1 intersected 69 ft net pay and showed higher porosity values ranging from to 8-14%, indicating improved reservoir quality in the Icewine-1 location.

Flow testing of the SMD-B at Hickory-1 in Q1 CY24 confirmed oil mobility with samples of 38.5-39.5 API gravity oil and a low gas-oil ratio. These results demonstrate reservoir deliverability and provide confidence that horizontal stimulation can enhance productivity. For full details, refer to the ASX announcement dated 15 April 2024.

Pantheon Resources' Dubhe-1 appraisal well represents a significant validation of the commercial potential of the SMD reservoirs. The well confirmed a 565 ft hydrocarbon column in the SMD-B topset horizon, exceeding pre-drill expectations by 26%, and also encountered hydrocarbon-bearing zones in the SMD-C and two Slope Fan intervals.

These results provide a compelling production analogue for 88 Energy's Franklin Bluffs-1H horizontal well. Together with the Hickory-1 flow test, Dubhe-1 confirms reservoir quality, hydrocarbon mobility and thickness across the SMD-B interval, supporting future commercial development potential for Project Phoenix.

Project Leonis (100% WI)

Tiri-1 Exploration Well Update

Planning and permitting for the Tiri-1 exploration well continued during the quarter, with all major vendors submitting operational proposals, resulting in a robust AFE and Major permitting C-Plan milestone approved by the State of Alaska.

Multiple parties continued technical due diligence on Project Leonis during the quarter. The proposed Tiri-1 well is currently positioned to intersect the Canning and USB reservoirs and to test deeper exploration potential. The final well location will be confirmed in consultation with prospective farm-in parties, with the well anticipated to be drilled in Q1'27. Preparations for the drilling of an exploration well at Leonis are advanced and will resume mid-2026.

Namibia PEL 93 (20% WI)

PEL 93 Forward Work Program

PEL 93 key milestones

Indicative PEL 93 timeline [2]H1-24H2-24H1-25H2-25H1-26H2-26
Working Interest assigned to 88EP
Completion of ~200km 2D acquisition and processingP
Airborne Gravity and Magnetic surveyn
Maiden Certified Prospective Resource Reportn
Planning/permitting/design for potential exploration welln

The Joint Venture is preparing to commence the airborne gravity survey in Q1 2026, focusing on the southern portion of the license area in the heart of the Owambo Basin. This follows identification of Lead 9, a very large anticlinal structure, during the H2 2024 2D seismic program. Lead 9 is analogous to the structure currently being drilled by ReconAfrica's Kavango West 1X well. Both structures exhibit large, robust structural closures incorporating shallow clastic reservoirs, the deeper Otavi carbonate reservoir (seen in Naingopo-1) and the deeper source rocks. According to the Operator of PEL 93, Monitor, the regional structural model suggests the presence of a series of similar features extending across the southern Owambo Basin. Early gravity and radiometric data suggest even larger structural leads may be present in the southeast of the block.

Regional Catalysts Building: ReconAfrica's Kavango West 1X Well

88 Energy notes the ongoing drilling of the nearby Kavango West 1X exploration well by ReconAfrica (TSXV: RECO) in the adjacent Damara Fold Belt. This well is targeting a large fold structure approximately 20 km long and 5 km wide, anticipated to penetrate a thick Otavi carbonate reservoir with mature source rocks within the same closure.

ReconAfrica commenced drilling of its Kavango West 1X exploration well in July 2025, on a structure which has striking similarities to Lead 9 located in the southern area of PEL 93. Drilling is proceeding on schedule, and the final casing string has been set just above the targeted Otavi reservoir. ReconAfrica expect to reach TD of ~3,800m in 2nd half of November prior to commencing an extensive logging program with results around 2025 year-end.

This regional activity highlights growing industry interest in the broader Owambo Basin.

Project Longhorn

On 18 August 2025, the Company announced it executed a binding Securities Purchase Agreement (SPA) with Lonestar I, LLC (Lonestar), Operator of Project Longhorn, for the sale of its 65% non-operated working interest in the producing oil and gas assets located in the Permian Basin, Texas, USA (Project Longhorn), held through subsidiary Longhorn Energy Investments LLC (88E - Longhorn) with an effective date of 1 July 2025 for total consideration of US$3.25 million before customary working capital and completion adjustments. The Company elected not to participate in the proposed multi-well drill program by the Operator and relieved exposure to a development program of US$2 million per well.

Full for details refer to the ASX announcement on 18 August 2025.

Corporate

At 30 September 2025, the Company's cash balance was A$8.3 million (US$5.4 million). The attached ASX Appendix 5B sets out the Company's cash flow for the quarter.

Material cash flows for the period include:

  • Exploration and Evaluation Expenditure: A$0.6 million (June 2025 quarter A$0.7 million) related to Leonis Tiri-1 permitting and planning and PEL 93 work program costs.
  • Staff and Administration Costs: A$1.1 million (June 2025 quarter A$1.3 million), material costs included one-off share registry payments for share consolidation and establishment of the SHSF noted below as well as annual listing fees and half yearly audit costs, and includes fees and consulting fees paid to Directors of A$0.21 million.
  • Leonis new lease costs including final bid bonus payment $A0.5 million. Phoenix lease costs payment of $A0.4 million was also made during the period of which was fully funded by Burgundy upon receipt of a cash call.

On 22 August 2025, 88 Energy Limited announced the retirement of Mr. Philip Byrne as Non-Executive Chairman, marking the conclusion of his tenure which began in August 2021. Mr. Byrne's leadership and extensive industry experience were instrumental during a pivotal period of transition for the Company. The Board appointed Ms. Joanne Williams to the role of Chair of 88 Energy. Ms. Williams, a petroleum engineer with over 25 years of global oil and gas experience, brings deep technical and strategic expertise. Her appointment as Chair follows four years on the Board as a Non-Executive Director and is expected to enhance the Company's focus on its core exploration growth pillars in Alaska and Namibia, and support its data-led approach to unlocking high-impact opportunities

Small Holding Sale Facility Update

Small Holding Share Sale Facility (SHSF) closed on 1 August 2025 for shareholders with parcels valued under A$500 (less than marketable parcels) that did not complete a notice of retention form. The sale facility remained ongoing at quarter end and upon the sale of all the less than marketable parcels, proceeds will be provided to participating shareholders as soon as sale of all shares is completed. Upon completion, the sale facility will streamline registry management and reduce Company administration costs by the reduced number of shareholders on the registry.

Information required by ASX Listing Rule 5.4.3

Project NameLocationNet Area (acres)Interest at beginning of QuarterInterest at end of Quarter
PhoenixOnshore, North Slope Alaska44,562~75%~75%
LeonisOnshore, North Slope Alaska35,634100%100%
PEL 93Onshore, Owambo Basin, Namibia914,27020%20%
Peregrine [3]Onshore, North Slope Alaska (NPR-A)125,735100%100%
Umiat [4]Onshore, North Slope Alaska (NPR-A)17,633100%100%
LonghornOnshore, Permian Basin Texas2,830~65%0%

This announcement has been authorised by the Board.

Media and Investor Relations:

Fivemark Partners, Investor and Media Relations

Michael VaughanTel: +61 (0)422 602 720
Euroz Hartleys Ltd
Chelsey KidnerTel: +61 (0)8 9268 2829
Cavendish Capital Markets Limited
Derrick Lee / Pearl KellieTel: +44 (0)131 220 6939
Hannam & Partners Leif Powis / Neil PassmoreTel: +44 (0) 207 907 8500

Information required by ASX Listing Rule 5.4.3 - Lease Schedules as at 30 September 2025

Note: Project Peregrine and Umiat leases positions are currently under suspension. The Board considers the acreage positions non-core and will look to relinquish or dispose of these acreage positions in the near-term.

Appendix 5B

Mining exploration entity or oil and gas exploration entity

quarterly cash flow report

Name of entity

88 Energy Limited

ABNQuarter ended ("current quarter")
80 072 964 17930 September 2025
Consolidated statement of cash flowsCurrent quarter $A'000Year to date (9 months) $A'000
1.Cash flows from operating activities--
1.1Receipts from customers
1.2Payments for--
(a) exploration & evaluation
(b) development--
(c) production--
(d) staff costs(451)(1,436)
(e) administration and corporate costs(646)(1,888)
1.3Dividends received (see note 3)--
1.4Interest received2681
1.5Interest and other costs of finance paid--
1.6Income taxes paid--
1.7Government grants and tax incentives--
1.8Other--
1.9Net cash from / (used in) operating activities(1,071)(3,243)
2.Cash flows from investing activities--
2.1Payments to acquire or for:
(a) entities
(b) tenements(963)(1,850)
(c) property, plant and equipment--
(d) exploration & evaluation(593)(2,284)
(e) investments--
(f) other non-current assets--
2.2Proceeds from the disposal of:--
(a) entities
(b) tenements--
(c) property, plant and equipment--
(d) investments--
(e) other non-current assets--
2.3Cash flows from loans to other entities--
2.4Dividends received (see note 3)--
2.5Other - Joint Venture Contributions Other - Distribution from Project Longhorn Other - Proceeds from sale Investments449 - 2,4926,193 262 2,492
2.6Net cash from / (used in) investing activities1,3854,813
3.Cash flows from financing activities--
3.1Proceeds from issues of equity securities (excluding convertible debt securities)
3.2Proceeds from issue of convertible debt securities--
3.3Proceeds from exercise of options--
3.5Proceeds from borrowings--
3.6Repayment of borrowings--
3.7Transaction costs related to loans and borrowings--
3.8Dividends paid--
3.9Other (provide details if material)--
3.10Net cash from / (used in) financing activities--
4.Net increase / (decrease) in cash and cash equivalents for the period
4.1Cash and cash equivalents at beginning of period8,0477,198
4.2Net cash from / (used in) operating activities (item 1.9 above)(1,071)(3,243)
4.3Net cash from / (used in) investing activities (item 2.6 above)1,3854,813
4.4Net cash from / (used in) financing activities (item 3.10 above)--
4.5Effect of movement in exchange rates on cash held(41)(448)
4.6Cash and cash equivalents at end of period8,3208,320
5.1Bank balances8,3208,047
5.2Call deposits--
5.3Bank overdrafts--
5.4Other (provide details)--
5.5Cash and cash equivalents at end of quarter (should equal item 4.6 above)8,3208,047
(a)
6.Payments to related parties of the entity and their associatesCurrent quarter $A'000
6.1Aggregate amount of payments to related parties and their associates included in item 1210
6.2Aggregate amount of payments to related parties and their associates included in item 2-
7.1Loan facilities--
7.2Credit standby arrangements--
7.3Other (please specify)--
7.4Total financing facilities--
7.5Unused financing facilities available at quarter end-
8.Estimated cash available for future operating activities$A'000
8.1Net cash from / (used in) operating activities (item 1.9)(1,071)
8.2(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))(593)
8.3Total relevant outgoings (item 8.1 + item 8.2)(1,664)
8.4Cash and cash equivalents at quarter end (item 4.6)8,320
8.5Unused finance facilities available at quarter end (item 7.5)-
8.6Total available funding (item 8.4 + item 8.5)8,320
8.7Estimated quarters of funding available (item 8.6 divided by item 8.3)5.00
8.8If item 8.7 is less than 2 quarters, please provide answers to the following questions:

Answer: n/a

Answer: n/a

Answer: n/a

Compliance statement

2 This statement gives a true and fair view of the matters disclosed.

Date: 30 October 2025

Authorised by: By the Board

(Name of body or officer authorising release - see note 4)

Notes

[1] Refer to Pantheon Resources (AIM: PANR) release on 18 August 2025 for further details

[2] This timeline is indicative and subject to change. The Company reserves the right to alter this timetable at any time

[3] Refer announcement released to ASX on 21 December 2023 regarding Project Peregrine initial suspension, which was extended by the BLM until 30 November 2025

[4] Refer 2024 Half Yearly announcement released to ASX on 2 September 2024, regarding Umiat 12-month suspension until 30 September 2025. The Company requested and was granted an additional 12-month suspension until 30 June 2026

Cleaned text: letterheads, contacts and legal notices removed. View the original announcement ↗ · Company filings. Not investment advice.

Share this quote

Quote card
Post on X WhatsApp Download image

The link opens this announcement with the quote highlighted. Quotes are checked against the original text.

Add a note